This paper presents the application draft of ancillary services for Korean Wholesale Electricity Market. This application draft of ancillary services is based on technical rules for ancillary services agreements prepared by KEMA and the present conditions of KEPCO system operations and future directions.
The Transactions of The Korean Institute of Electrical Engineers
/
v.58
no.2
/
pp.256-263
/
2009
For the power system to keep in a stable operating state, sufficient ancillary services must be available to respond to credible contingency events and return the power system to a satisfactory operating state in the case of contingencies as well as blackout events within specified predefined limits. The logical and reasonable bases of valuing and pricing the ancillary services are required to reach the common ground among market participants. The total amount of black start service transactions is quite small compared to the total ancillary service transactions as well as energy market transactions. Black start services must be provided as one of the ancillary services in the deregulated electricity market. In order to procure and remunerate black start services, it is necessary to quantify the value of the black start sources within the power system. In this paper, an approach to assess the value of the black start service is presented based on the cost-of-service solution. Financial simulation of the influence on market participants for the proposed approach on the service is carried out. The cost of the black start service is allocated in accordance with the principle of "causer pays", and the cost is shared by the producers and consumers equally that created the requirement for the service. Under the present electricity market, the mechanism to recover the cost is not implemented, a new approach to the ancillary services to provide incentive for the service providers has to be studied in the near future.
Transactions of the Korean Society of Mechanical Engineers A
/
v.41
no.3
/
pp.225-232
/
2017
Several maintenance issues related to cavitation erosion and fatigue cracks in the water turbine subcomponents of pumped-storage plants, such as a runner and a draft tube, have been reported in the past. Generally, the pumped-storage plants provide ancillary services, such as black-start and system stabilization. The ancillary services are responsible for cyclic low opening operation of the guide vanes. It has been empirically established that this low opening operation further damages the water turbine subcomponents. In this study, the acceleration effect of the low opening operation on the cavitation erosion and fatigue of the water turbine is quantitatively assessed through finite element flow analysis, finite element stress analysis, and fatigue analysis. As a result of the assessment, it is identified that the cavitation potential increases and the turbine efficiency decreases with a decrease in the opening of the guide vane. Also, the low opening operation has an insignificant effect on the fatigue even though it increases the maximum stress values at the runner blade roots.
This study purports to investigate the determinants of patient satisfaction and intent to revisit at national university hospitals in Korea. A total of 8 independent variables for outpatients, 9 independent variables for inpatients, and an intervening variable of overall patient satisfaction were selected through literature review. The independent variables for outpatients contain the level of satisfaction with physicians, nurses, ancillary staff, administrative procedure, medical cost, physical environment, facility convenience. and health recovery. With regard to the independent variables for inpatients, the quality of ward services was added to those of outpatients. Each variable contains 3 to 8 items measuring the level of satisfaction with various aspects of the variable. The sample used in this study consisted of 879 outpatients and 821 inpatients. Data were collected with interview survey and analyzed using path analysis. The major findings of the study are as follows: 1) The following variables have significantly positive effect on the intent to revisit of outpatients: health recovery, overall satisfaction, satisfaction with physicians, and ancillary staff. 2) The following variables have significantly positive effect on the intent to revisit of inpatients: health recovery, satisfaction with nurses and physicians, overall satisfaction, and administrative procedure. 3) The following variables of admission procedure, satisfaction with ancillary staff, facility convenience, quality of ward services were found to have significantly positive effect only on the level of overall satisfaction, even though they do not have significant total effect on the intent to revisit. The results of the study indicate that national university hospitals in Korea should make an effort to improve the satisfactory level of patients with clinical outcome, services provided by physicians, nurses, and ancillary staff, and the quality of administrative procedure for enhancing the intent to revisit of patients.
Deregulation in power industry has made the reactive power ancillary service management a critical task to power system operators from both technical and economic perspectives. Reactive power management in power systems is a complex combinatorial optimization problem involving nonlinear functions with multiple local minima and nonlinear constraints. This paper proposes a practical market-based reactive power ancillary service management scheme to tackle the challenge. In this paper a new model for voltage security and reactive power management is presented. The proposed model minimizes reactive support cost as an economic aspect and insures the voltage security as a technical constraint. For modeling validation study, two optimization algorithm, a genetic algorithm (GA) and particle swarm optimization (PSO) method are used to solve the problem of optimum allocation of reactive power in power systems under open market environment and the results are compared. As a case study, the IEEE-30 bus power system is used. Results show that the algorithm is well competent for optimal allocation of reactive power under practical constraints and price based conditions.
KIEE International Transactions on Power Engineering
/
v.5A
no.4
/
pp.311-321
/
2005
A competitive generating company (GENCO) could maximize its payoff by optimizing its generation assets. This paper considers the GENCO's arbitrage problem using price-based unit commitment (PBUC). The GENCO could consider arbitrage opportunities in purchases from qualifying facilities (QFs) as well as simultaneous trades with spots markets for energy, ancillary services, emission, and fuel. Given forecasted hourly market prices for each market, the GENCO's generating asset arbitrage problem is formulated as a mixed integer program (MIP) and solved by a branch-and-cut algorithm. A GENCO with 54 thermal and 12 combined-cycle units is considered for analyzing the proposed formulation. The proposed case studies illustrate the significance of simultaneous arbitrage by applying PBUC to multi-commodity markets.
Credit rating agencies(CRAs) are accused of failing to provide accurate and fair credit ratings and hence being responsible for the crisis. This paper tries to add on to the literature on credit rating reform through examining the CRAs in a model where rating quality is unobservable. We show that unobservability of rating effort results in the sub-optimal level of quality. Then the paper extends the model to incorporate ancillary services, competition and reputation. We show that ancillary services worsen the conflict of interests of the CRAs and that competition and reputation may not be strong enough to discipline the CRAs. Hence regulatory oversight and imposition of liability may be necessary in order to increase the accuracy of ratings.
Vehicle-to-grid presents a mechanism to meet the key requirements of an electric power system, using electric vehicles (EVs) when they are parked. The most economic ancillary service is that of frequency regulation, which imposes some constraints regarding the period and duration of time the vehicles have to be connected to the grid. The majority of research explores the profitability of the aggregator, while the perspective of the EV fleet owner, in terms of their need for usage of their fleet, remains neglected. In this paper, the optimal allocation of available vehicles on a day-ahead basis using queuing theory and fuzzy multi-criteria methodology has been determined. The proposed methodology is illustrated on the daily scheduling of EVs in an electricity distribution company.
Variable renewable energy (VRE) such as solar and wind power is the main sources of achieving carbon net zero, but it undermines the stability of power supply due to high variability and uncertainty. Energy storage system (ESS) can not only reduce the curtailment of VRE by load shifting but also contribute to stable power system operation by providing ancillary services. This study analyzes how the allocation of ESS resources between load shifting and ancillary service can contribute to maximizing the efficiency of power supply in a situation where the problems caused by VRE are becoming more and more serious. A stochastic power system optimization model that can realistically simulate the variability and uncertainty of VRE was applied. The analysis time point was set to 2023 and 2036, and the optimal resource allocation strategy and benefits of ESS by varying VRE penetration levels were analyzed. The analysis results can be largely summarized into the following three. First, ESS provides excellent functions for both load shifting and ancillary service, and it was confirmed that the higher the reserve price, the more limited the load shifting and focused on providing reserve. Second, the curtailment of VRE can be a effective substitute for the required reserve, and the higher the reserve price level, the higher the curtailment of VRE and the lower the required amount of reserve. Third, if a reasonable reserve offer price reflecting the opportunity cost is applied, ESS can secure economic feasibility in the near future, and the higher the proportion of VRE, the greater the economic feasibility of ESS. This study suggests that cost-effective low-carbon transition in the power system is possible when the price signal is correctly designed so that power supply resources can be efficiently utilized.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.