• Title/Summary/Keyword: analytical hierarchical process

Search Result 48, Processing Time 0.019 seconds

Performance Analysis of Optimal Tracking Load Balance Scheme in Hierarchical LTE Networks (계층적 LTE 네트워크에서 최적의 트래킹 로드밸런스 기법의 성능분석)

  • Jeon, Minsu;Jeong, Jongpil
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.50 no.6
    • /
    • pp.9-21
    • /
    • 2013
  • Tracking is a process which explores user equipment (UE) in the area of tracking in terms of cells. In this paper, two tracking schemes based on macrocell-microcell tiers in hierarchical LTE networks, PMMT and IMMT, are evaluated. In this network, UE can receive a signal from macrocells and overlapping microcells, and can be called from each macrocell or microcell-tier in the PMMT. Also, the UE can be called from the combined macrocell-tier and microcell-tier in the IMMT. Finally, we analyze the optimization of load balance between marcocell-tier and microcell-tier, and an analytical model is developed to evaluate those two arrangements.

On the Evaluation Algrithm of Hierarchical Process using $\lambda$-Fuzzy Integral (퍼지 적분을 도입한 계증구조 평가 알고리즘)

  • 여기태;노홍승;이철영
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.2 no.1
    • /
    • pp.97-106
    • /
    • 1996
  • One of the main problems in evaluating complex objects, such as an ill-defined system, is how to treat ambiguous aspect of the evaluation. Due to the Complexity and ambiguity of the objects, many types of evaluation attributes should be identified based on the rational dsision. One of these attributes is an analytical hierarchy process (AHP). the weight of evaluation attribtes in AHP however comes from the probability measure based on the additivity. Therefore, it is notapplicable to the objects which have the property of non-additivity. In the previous studies by other researchers they intriduced the Hierarchical Fuzzy Integral method or mergd AHP and fuzzy measure for the analysis of the overlaps among the evaluation objects. But, they need more anlyses in terms of transformation of the probability measure into fuzzy measure which fits for the additivity and overlapping coefficient which affects to the fuzzy measure. Considering these matters, this paper deals that, ⅰ) clarifying the relation between the fuzzy and probability measure adopted in AHP, ii) calculating directly the family of fuzzy measure from the overlapping coefficient and probability measure. A simple algorithm for the calculation of fuzzy measures and set family of those from the above results is also proposed. Finally, the effectiveness of the algorithm developed by applying this to the problems for estimation of safety in ship berthing and for evaluation of ports in competition is verified. This implied that the new algoritnm gives better description of the system evaluation.

  • PDF

The Perceived Utility of Education and Training in SMEs on Employee Satisfaction: The Moderating Role of HRM Department Activities (중소기업 재직자들의 교육훈련에 대한 인지된 유용성이 교육 훈련 만족도에 미치는 영향: 인사부서 활동의 조절효과)

  • Park, Ji-Sung;Chae, Hee-Sun
    • Asia-Pacific Journal of Business
    • /
    • v.12 no.4
    • /
    • pp.241-251
    • /
    • 2021
  • Purpose - Drawing on the content-process approach, this study examines the effect of employees' perceived utility of education and training in small and medium enterprises (SMEs) on their satisfaction. In addition, this study investigates how the human resource management department' activities moderate the relationship between employees' perceived utility of education and training and satisfaction. Design/methodology/approach - This study predicts the positive relationship between employees' perceived utility of education and training and satisfaction, and HR activities strengthens this positive relationship. To test these hypotheses, this study utilized Human Capital Corporate Panel (HCCP) datasets, especially 2017 data at the individual level. The number of the final sample is 425 for the test. Moreover, this study used the hierarchical regression model with SPSS. Finding - As predicted, the analytical results with the hierarchical regression model showed that employees' percieved utility of education and training and satisfaction were positively related. In addition, HR activities strengthened this relationship between employees' percieved utility of education and training and satisfaction. Research implications or Originality - This study will provide academic and practical implications for future research on human resource development, especially SMEs by deepening an understanding of the important factors in order to increase employees' satisfaction of education and training. the number of viewers is found in most American films released in Korea.

Integrating Balanced Scorecard and Analytic Hierarchy Process Techniques for Evaluating Corporate Performance

  • Sohn, Myung-Ho;Park, Sungbum;Lee, Heeseok
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.111-115
    • /
    • 2001
  • A good business performance measurement system is an effective tool io sustained growth in profits. Although interest in creating performance measurement models is widespread, a well-designed system is rare. To be successful in today's competitive environment, a performance measurement system should incorporate strategic success factors and contain financial and non-financial measuring index to carry out strategic management. In the 1990s, Kaplan & Norton introduced a concept called the Balanced Scorecard. The Balanced Scorecard supplements traditional financial measures with criteria that measured performance from three additional perspectives - those perspectives of customers, internal business processes, and learning and growth. This paper presents five measuring index criteria for each perspective. To calculate the relative priority for These measuring index, we investigate weights investigated by interviews with management consultant. Then, AHP method is employed for calculating priority weight. Our evaluation model may be referred to as the Balanced Analytic Hierarchical Performance Model(BAHPM) in the sense that the analytic hierarchical scheme, along with the AHP, is applied. The BAHPM is the first kind of analytical model to cover a wide variety of measures. In comparison with previous evaluation models, our model shows strengths in structural flexibility, ease of incorporating feedback, group evaluation capacity, participation promotion, sensitivity analysis, and computational simplicity. A prototype based on the BAHPM can be applied to various industry sectors.

  • PDF

Dimensioning of linear and hierarchical wireless sensor networks for infrastructure monitoring with enhanced reliability

  • Ali, Salman;Qaisar, Saad Bin;Felemban, Emad A.
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.8 no.9
    • /
    • pp.3034-3055
    • /
    • 2014
  • Wireless Sensor Networks have extensively been utilized for ambient data collection from simple linear structures to dense tiered deployments. Issues related to optimal resource allocation still persist for simplistic deployments including linear and hierarchical networks. In this work, we investigate the case of dimensioning parameters for linear and tiered wireless sensor network deployments with notion of providing extended lifetime and reliable data delivery over extensive infrastructures. We provide a single consolidated reference for selection of intrinsic sensor network parameters like number of required nodes for deployment over specified area, network operational lifetime, data aggregation requirements, energy dissipation concerns and communication channel related signal reliability. The dimensioning parameters have been analyzed in a pipeline monitoring scenario using ZigBee communication platform and subsequently referred with analytical models to ensure the dimensioning process is reflected in real world deployment with minimum resource consumption and best network connectivity. Concerns over data aggregation and routing delay minimization have been discussed with possible solutions. Finally, we propose a node placement strategy based on a dynamic programming model for achieving reliable received signals and consistent application in structural health monitoring with multi hop and long distance connectivity.

An Efficient Index Structure Supporting Structure Queries for Video Documents (비디오 문서의 구조 질의를 위한 효율적 인덱스 구조)

  • Lee, Yong-Kyu
    • The Transactions of the Korea Information Processing Society
    • /
    • v.5 no.5
    • /
    • pp.1109-1118
    • /
    • 1998
  • Recently, much attention has been focused on video databases. Video documents also have a hierarchical logical structure like text documents. By exploiting this structure using structure queries, users can obtain greater benefits than by using only content queries. In order to process structure queries efficiently, an index structure supporting fast video element access must be provided. However, there has been little attention to the index structure for video documents. In this paper, we present a tree-structured video document model and a new inverted index structure for video documents. We evaluate the storage requirement and the disk access time of the scheme and present the analytical results.

  • PDF

Quantitively deducing basic method of construction schedule risk (공정리스크의 정량적 도출을 위한 기초적 방법)

  • Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.90-91
    • /
    • 2014
  • Previous research related to the construction schedule management has focused on construction schedule categorization, construction schedule management, and system development to manage construction schedule risks. Therefore this research present quantitively deducing method for managing construction schedule risk. Based on the investigation, this study suggested the probable risk factors and a practical management method, through interviews and discussions with experts. The quantified risks should be adapted for an individually specific projects and managed until the project is complete. To maintain the continuity of schedule risks, the schedule risk management procedures should be controlled during the performance of the construction project.

  • PDF

Enhanced MPR Selection Strategy for Multicast OLSR

  • Matter, Safaa S.;Al Shaikhli, Imad F.;Hashim, Aisha H.A.;Ahmed, Abdelmoty M.;Khattab, Mahmoud M.
    • International Journal of Computer Science & Network Security
    • /
    • v.22 no.10
    • /
    • pp.137-144
    • /
    • 2022
  • Wireless community networks (WCNs) are considered another form of ownership of internet protocol (IP) networks, where community members manage and own every piece of equipment in a decentralized way, and routing for traffic is done in a cooperative manner. However, the current routing protocols for WCNs suffer from stability and scalability issues. In this paper, an enhanced routing protocol is proposed based on the optimized link state routing (OLSR) protocol to meet the standards of efficiency in terms of stability and scalability. The proposed routing protocol is enhanced through two phases: multicasting expansion and multipoint relay (MPR) selection based on an analytical hierarchical process (AHP). The experimental results demonstrate that the proposed routing protocol outperforms the OLSR protocol in terms of network control overhead and packet delivery ratio by 18% and 1% respectively.

An Analytical Hierarchy Process Combined with Game Theory for Interface Selection in 5G Heterogeneous Networks

  • Chowdhury, Mostafa Zaman;Rahman, Md. Tashikur;Jang, Yeong Min
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.14 no.4
    • /
    • pp.1817-1836
    • /
    • 2020
  • Network convergence is considered as one of the key solutions to the problem of achieving future high-capacity and reliable communications. This approach overcomes the limitations of separate wireless technologies. Efficient interface selection is one of the most important issues in convergence networks. This paper solves the problem faced by users of selecting the most appropriate interface in the heterogeneous radio-access network (RAN) environment. Our proposed scheme combines a hierarchical evaluation of networks and game theory to solve the network-selection problem. Instead, of considering a fixed weight system while ranking the networks, the proposed scheme considers the service requirements, as well as static and dynamic network attributes. The best network is selected for a particular service request. To establish a hierarchy among the network-evaluation criteria for service requests, an analytical hierarchy process (AHP) is used. To determine the optimum network selection, the network hierarchy is combined with game theory. AHP attains the network hierarchy. The weights of different access networks for a service are calculated. It is performed by combining AHP scores considering user's experienced static network attributes and dynamic radio parameters. This paper provides a strategic game. In this game, the network scores of service requests for various RANs and the user's willingness to pay for these services are used to model a network-versus-user game. The Nash equilibria signify those access networks that are chosen by individual user and result maximum payoff. The examples for the interface selection illustrate the effectiveness of the proposed scheme.

Difficulty Factor for Activation of Amateur Tennis Tournament (아마추어 테니스 대회의 활성화를 위한 문제요인 도출)

  • Cha, Jung-Hoon;Kang, Hye-Yeon
    • Journal of Digital Convergence
    • /
    • v.16 no.3
    • /
    • pp.543-552
    • /
    • 2018
  • The purpose of this study is to provide basic data for the improvement of the tournament operating environment and effective tournament operation. For the factor analysis, exploratory factor analysis was conducted. Based on this, in order to conduct hierarchical analysis, we've produced and distributed the questionnaire to expert group. And after, with collected data, AHP (Analytical Hierarchy Process) technique was used to analyze relative importance and determinants. As a result, operational factors showed the highest priority among the components of evaluation. And next prior factors are satisfaction of participants, environmental factors and etc. In order to stabilize the operation of the tournament, priority shall be securing the budget. And it is necessary to understand the desire of participants and shall consider characteristics and level of the tournament. In future studies, it will be necessary to make a comparative study through expert group in order to secure the fitness.