Korean Journal of Air-Conditioning and Refrigeration Engineering
/
v.20
no.10
/
pp.654-661
/
2008
Our government will make a plan regulating the cooling limit temperature of the summer season to 26 degree and the heating limit temperature of the winter season to 20 degree for energy saving. Where, the key point of this politic pursuit can be the charge system on heating and cooling cost. Currently, the heating and cooling cost are charged as much as the volume or heat flow rate regardless of the high and low room temperature. However, we have suggested new cost estimating methodology as a worth method in the precedent study, and preformed the worth evaluation and cost allocation of electricity and heat on various cogenerations. In this study, we applied the suggested worth method to four kind of warm air, and preformed the worth evaluation and cost allocation of each warm air. As a result, the more energy a customer saved, the more heating unit cost decreased, and the more energy a customer consumed, the more heating unit cost increased. From this analysis, we hope that the suggested worth methodology can offer a theoretical basis to the politic pursuit of government, and induce the spontaneous energy saving of consumers.
Journal of Fisheries and Marine Sciences Education
/
v.26
no.2
/
pp.444-454
/
2014
The range of optimization problem in aquaculture is very wide, resulting from the range of species, mode of operation. Quite a few studies focus marine net-cages, but studies on land based culture farm are few or no. This paper considers a allocation problem to meet production planning in land based aquaculture system. A water pool allocation model in land based aquaculture system was developed. The solution finds the value of decision variable to minimize yearly production costs that sums up the water pool usage cost and sorting cost. The model inputs were (1) the fish growth rate (2) critical standing corp (3) number of water pool (4) number of fish. The model outputs were (5) number of water pool in growing phase (6) cost of cultivation (6) optimal facility allocation(number of water pool for each growing phase). To solve the problem, an efficient heuristic algorithm based on a greedy manner is developed. Branch and bound and heuristic is evaluated through numerical examples.
In deregulated power market, transmission pricing methodology should maintain non-discrimination amongst all participants while ensure that TRANSCOs recover their revenue requirements. The proposed transmission pricing methodology for Korea needs cost allocation ratios, such as allocation ratio of physical transport to network security and that of generators to loads. In this paper, we studied the nodal transmission price determined by the cost allocation factors and its influence on GENCOs and DISTCOs.
Proceedings of the Korea Information Processing Society Conference
/
2022.05a
/
pp.45-47
/
2022
Mobile edge computing (MEC), which enables mobile terminals to offload computational tasks to a server located at the user's edge, is considered an effective way to reduce the heavy computational burden and achieve efficient computational offloading. In this paper, we study a multi-user MEC system in which multiple user devices (UEs) can offload computation to the MEC server via a wireless channel. To solve the resource allocation and task offloading problem, we take the total cost of latency and energy consumption of all UEs as our optimization objective. To minimize the total cost of the considered MEC system, we propose an DRL-based method to solve the resource allocation problem in wireless MEC. Specifically, we propose a Asynchronous Advantage Actor-Critic (A3C)-based scheme. Asynchronous Advantage Actor-Critic (A3C) is applied to this framework and compared with DQN, and Double Q-Learning simulation results show that this scheme significantly reduces the total cost compared to other resource allocation schemes
The Journal of Korean Institute of Communications and Information Sciences
/
v.21
no.1
/
pp.196-205
/
1996
Severice allocation to satellite transponders under consideration of interference caused by inter-satellite and intra-satellite systems is one of the most important issue in terms of optimal usage of satellite network resource. In this paper, we present a new and show several simulation results to verify the proposed method. Especially, our concerns are concentrated on the cost (interference) matrix which is believed to be optimal in obtaining the service allocation plan. The method and concepts presented in this paper may be well applicable to making a plan for service assignment of the satellite communication systems.
A new cost management system, called Activity Based Costing (ABC) system, has arisen to solve the limitation of a Traditional Cost Accounting (TCA) system until last two decades and ABC has been applied by many companies. TCA systems have limitation in tracing cost because they arbitrarily allocate overhead cost to the cost objects without standard for direct cost distribution. ABC is an accounting system that assigns costs to products or services based on the resources they consume. The costs of all activities are traced to the products for which they are performed. Therefore ABC is a cost management system that provides a matrix to accurately quantify consumed resources triggered by activities and activities triggered by products and services. There is little implementation of ABC in the health services field, one of service industries, due to complicated and many activities, and volatile cost object. However, the necessity for applying reasonable cost accounting system is largely issuing as strategy responding hostile environment, and financial pressure, and it is imperative to implement the Activity Based Costing (ABC) system. Therefore, this study presents the framework to develop ABC system for total health service organizations. Cost objects in this study base on medical service activities per health insurance claim from one general hospital located in Metropolitan Statistical Areas (MSAs). Medical service activities include all health insurance claims in the hospital. The purpose of the study is presenting useful tools and basic frame to develop Activity Based Costing system for health service organizations which want to use ABC system. The steps to develop ABC system for health service organizations are following: 1. Identifying of activity centers; 2. Definition of cost objects and activity by activity center; 3. Analysis of activity and tracing activity contribution; 4. Allocation of direct cost for specific activity; 5. Allocation of indirect cost for specific activity; 6. Allocation of depreciation for facilities, applicants, and consumption goods; 7. Allocation of administration cost; 8. Allocation of cost among activity centers; and 9. Tracing cost of cost objects by activity center. This study identified necessary information from existing reports which hospitals generally made by each step, and defined outcome which had to be produced in each step using this information. The steps of this study had limitation to apply all different size hospitals because the steps were structured ABC system by one hospital, however, this study used similar basic framework and methods with general cases. When a health service organization want to apply Activity Based Costing (ABC) system on all activities of it in future days, this study is very useful to design system structure in the health service organization.
The assembly tolerance design methods have applied linear or nonlinear programming methods and used simulation method and search algorithms to optimize the tolerance allocation of each part in an assembly. However, those methods are only considered to the relationship between tolerance and manufacturing cost, which do not consider a quality loss cost for each part tolerance. In this paper, the integrated simulation model used genetic algorithm and the Monte-Carlo simulation method was developed for the allocation of the optimal tolerance considering the manufacturing cost and quality loss cost.
In the telecommunication industry, estimation of the cost of network facilities is very important since depreciation cost of the facilities accounts for a large portion of the product cost. Moreover, cost estimation in the industry becomes more difficult because of increasing indirect cost upon digital convergence, expanding multi-purpose facilities, complexity of service product, etc. Nevertheless, not much seem to have been done in improving estimation methodology of the cost of network facilities. As a result, the quality of cost information on network facilities has deteriorated, and now even decision-makers in the industry dismiss the information. Recently, two major telecommunication companies adopted a new network cost estimation method to deal with the issue. In this paper, we study the concept of new cost estimation method and the procedure to develop and apply it. We also suggest the method to carry out the cost allocation using Matlab which is more efficient and time-saving than other commercial cost calculation packages.
It only takes one failed project to wipe out an entire year's profit, when the projects are not managed efficiently. Additionally, escalating costs of materials and a competitive local construction market make subcontractors a challenge. Subcontractors have finite resources that should be allocated simultaneously across many projects in a dynamic manner. Significant scheduling problems are posed by concurrent multi-projects with limited resources. The objective of this thesis is to identify the effect of productivity changes on the total cost resulting from shifting crews across projects using a descriptive model. To effectively achieve the objective, this study has developed a descriptive cost model for a subcontractor with multi-resources and multi-projects. The model was designed for a subcontractor to use as a decision-making tool for resources allocation and scheduling. The model identified several factors affecting productivity. Moreover, when the model was tested using hypothetical data, it produced some effective combinations of resource allocation with associated total costs. Furthermore, a subcontractor minimizes total costs by balancing overtime costs, tardiness penalties, and incentive bonus, while satisfying available processing time constraints.
Proceedings of the Korea Society for Industrial Systems Conference
/
1998.10a
/
pp.731-740
/
1998
This paper discusses a brcriterion approachto sequencing with time/cost trade-offs. The first problem is to minimize the total flow time and the maximum tardiness. And second is to the maximum tardiness and resource allocation costs. This approach , which produces an efficient frontier of possible schedules, has the advantage that it does not require the sequencing criteria to be measurable in the same units as the resource allocation cost. The basic single machine model is used to treat a class of problems in which the sequencing objective is to minimize the maximum completion penalty. It is further assumed that resource allocation costs can be represented by linear time/cost function.
이메일무단수집거부
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.