Feasibility Analysis for Introduction of Scaffolding with Advanced Guardrail System to Prevent Falls (비계작업의 추락재해예방을 위한 선행 안전난간 공법의 도입 타당성 분석)

  • Park, J.D.;Moon, S.O.;Lee, H.S.;Jeong, S.C.;Kwon, Y.J.;Jung, K.
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.4
    • /
    • pp.23-31
    • /
    • 2020
  • In the construction sector, there were 99 fatalities from falls associated with steel tube and system scaffolds for three years from 2016 to 2018 and out of which 27.3 percent (27 workers) were found to have occurred during installing and dismantling procedure. To erect scaffolding which is installed for the work at height, the work platforms are generally installed first and the safety guardrails are installed and vice versa to dismantle. As a result, workers are exposed to the risk of falling because they erect and dismantle scaffolding without guardrails. To minimize the risk of falling, it is necessary to study a new construction method that can erect or dismantle scaffolding while guardrails are installed (called advanced guardrail system). This study analyzed advanced guardrail system in terms of safety regulation, workability and economic efficiency by investigating the domestic situation on the use of scaffolding, reviewing domestic and foreign standards for guardrails and conducting economic feasibility study. The results of this study is expected to greatly contribute to preventing falls in scaffolding installation and dismantlement procedure. As a follow-up study, empirical research is required including physical test of scaffolding with advanced guardrail system and effectiveness analysis after trial applications.

Structural Capacity Evaluation of System Scaffolding using X-Type Advanced Guardrail (교차가새형 선행 안전난간을 적용한 시스템비계의 구조 성능 평가)

  • Park, J.D.;Lee, H.S.;Shin, W.S.;Kwon, Y.J.;Park, S.E.;Yang, S.S.;Jung, K.
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.5
    • /
    • pp.49-58
    • /
    • 2020
  • In domestic construction sites, when installing steel pipe scaffolding and system scaffolding, the guardrails are installed after the installation of the work platforms. This conventional guardrail system (CGS) is always exposed to the risk of falls because the safety railing is installed later. In order to prevent fall disasters during erecting and dismantling scaffolds, it is necessary to introduce the advanced guardrail system (AGS) which installs railings in advance of climbing onto a work platform. For the introduction of the AGS, the structural performance of the system scaffolding applying the CGS and the AGS was compared and evaluated. The structural analysis of the system scaffold (height: 31 m and width: 27.4 m) with AGS confirmed that structural safety was ensured because the maximum stress of each element of the system scaffolding satisfies the allowable stress of each element. As a result of performance comparison of CGS and AGS for each element, the combined stress ratio of vertical posts in AGS was 6.4% lower than that of CGS. In addition, in the case of ledger and transom, the combined stress ratios of AGS and CGS were almost the same. The compression test of the assembled system scaffolding (three-storied, 1 bay) showed that the AGS had better performance than the CGS by 9.7% (8.91 kN). The cross bracing exceeds the limit on slenderness ratio of codes for structural steel design. But the safety factor for the compressive load of the cross bracing was evaluated as meeting the design criteria by securing 3 or more. In actual experiments, it was confirmed that brace buckling did not occur even though the overall scaffold was buckled. Therefore, in the case of temporary structures, it was proposed to revise the standards for limiting on slenderness ratio of secondary or auxiliary elements to recommendations. This study can be used as basic data for the introduction of AGS for installing guardrails in advance at domestic construction sites.

Improvement of Fall Prevention Method in Construction Site through Comparison with Advanced Countries' Cases (해외 사례 비교를 통한 건설현장 추락재해 예방기법 개선방안)

  • Kim, Dae Young;Yun, Sungmin;Kim, Ji-Myong;Lee, Sunyong;Son, Kiyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.5
    • /
    • pp.471-480
    • /
    • 2020
  • Although the domestic industrial accidents have been decreased gradually, deaths in the construction sites have been occupied 49.9 percent of the total industry and deaths from fall accident have been accounted for 59.7 percent of the construction industry. In order to prevent fall accident, various safety activities and policy have been carried out. However, the impact on the domestic construction industry was inadequate. On the other hand, in advanced countries, such as the United States, Japan, EU, and Singapore Industrial accidents have been lower than domestic industry due to safety activities, the regulations and policies appropriate for each country's situation. In this study, we compare the major points of the Industrial Safety and Health Act in developed countries with those in South Korea to reduce the number of falls, and propose a revision. As a result of conducting research, three revisions have been proposed as 1) Enhance standards for fall height, 2) Improvement of upper safety rail height on guardrail, 3) Revision and research on Horizontal Sarety bar attachment system. This study will be utilized as a basic study for the analysis of cases in advanced countries.