• Title/Summary/Keyword: acquisition process

Search Result 1,224, Processing Time 0.027 seconds

Study to Protocol of PET Acquisition Time for Patient Body Type in PET/CT (PET/CT 검사에서 환자체형에 따른 적정검사 프로토콜에 관한 고찰)

  • Cho, Seok Won;Ham, Joon-Chul;Kang, Chun Goo;Bahn, Young Kag;Lee, Seung Jae;Lim, Han Sang;Lee, Chang-Ho;Park, Hoon-Hee
    • The Korean Journal of Nuclear Medicine Technology
    • /
    • v.17 no.2
    • /
    • pp.72-77
    • /
    • 2013
  • Purpose: Whole-body PET using radiopharmaceutical is one of the imaging study methods for physiological changes of body. High specificity of the PET-CT examination is used to detect an early stages of cancer and metastatic cancer by imaging a physiological changes. During the imaging process, PET image has been characterized by a relatively low image quality due to its low sensitivity and the acquisition of random and scatter coincidences as well as patients figure. Therefore, the image quality as the changes of the acquisition times of patient weight was evaluated in this study. Materials and Methods: Thirty patients who presented to our hospital were enrolled. They were divided to normal, overweight, and obese group using BMI index, respectively. The patients with a liver disease and diabetes were excluded. $^{18}F-FDG$ was administered to the patients as 5.2 MBq per kg. After an hour from an injection, image acquisition was obtained as List mode in a part of liver in 1 bed. SNR (signal-to-noise ratio) of each groups acquisition times were confirmed from the calculated radiation counts and random fractions. The statistical significance of three groups was confirmed through one-way ANOVA test. On the basis of the counts of 2 minutes on normal group, the SNR of overweight group and obese group were compared. Results: The SNR were increased with loger aquisition time in 3 groups. In the condition of same acquisition time, the SNR had a statistical significance (P<0.05). The SNR were decreased to the normal, overweight, and obese, respectively. Liver activity had no significance difference on each group and RF had the significance differences (P<0.05). On the basis of the counts of 2 minutes on normal group, there were no statistical significance in a three minute acquisitions of overweight group and two minute acquisitions of obese group (P=0.150). Conclusion: In this study, the administrated amount of radiation dose did not adjust as the change of the patients weight. Increasing the acquisition time when the administration of the same amount of dose was able to get a good result of SNR. When the Based 2 minute on normal group, if overweight and obese case the increased acquisition time of 3 minute was able to obtain a similar SNR. On the basis of the normal group, the acquisition times of overweight and obese group were increased to 3 minutes per bed and the SNR were similar to the normal group.

  • PDF

A GNSS Code Tracking Scheme Based in Slope Difference of Correlation Outputs (상관 함수의 기울기 차에 기반한 GNSS의 부호 추적 기법)

  • Yoo, Seung-Soo;Yoo, Seung-Hwan;Chong, Da-Hae;Ahn, Sang-Ho;Yoon, Seok-Ho;Kim, Sun-Yong
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.33 no.6C
    • /
    • pp.505-511
    • /
    • 2008
  • The global navigation satellite system (GNSS) is using a direct sequence/spread spectrum (DS/SS) modulation. In order to recover the information data, the DS/SS system first performs a two-step synchronization process: acquisition and tracking. The acquisition process adjusts the phase difference between the received and locally generated acquisition sequences within ${\pm}T_c/2$ or less, where $T_c$ is the chip period. The tracking process performs fine synchronization. In this paper, we focus on the tracking issue. The single delta delay locked loop($\Delta$-DLL) is the optimal tracking scheme for a GNSS in the absence of multipath signals, where $\Delta$ means the spacing between the early and late correlation time offset. In the multipath environments, however, the $\Delta$-DLL suffers from huge estimation bias(denoted by $\beta$) caused by distorted correlation values. Although some modified schemes such as a $\Delta$-DLL with a narrow $\Delta$ and a double delta DLL (${\Delta}^{(2)}$-DLL) were proposed to reduce the estimation bias, they cannot remove the estimation bias completely and need more accurate acquisition process. This paper proposes a novel tracking scheme that can dramatically reduce the estimation bias, using the maximum slope change among the correlation outputs.

On Improving the Test and Evaluation Process by Incorporating the RAMS and Risk Management Processes (무기체계 개발에서 RAMS 및 위험 관리를 통한 시험평가 프로세스의 개선에 관한 연구)

  • Shin, Young-Don;Sim, Sang-Hyun;Lee, Jae-Chon
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.2
    • /
    • pp.31-42
    • /
    • 2014
  • As weapon systems become complex in terms of the scale and functionality, the required time to complete the test and evaluation (T&E) process is inevitably getting longer. However, nowadays the reduction of T&E period becomes one of the core targets in the weapon systems acquisition programs. This is because the reduced time for T&E process can yield the reduction of defense budget and also faster deployment of the weapon systems, thereby having a competitive edge over rival countries. On the other hand, in weapon systems development the management of reliability, availability, maintainability and safety (RAMS), and risk is considered important to keep competitiveness and thus has been carried out separately. Thus, the objective of this paper is to study on improving the T&E process by integrating the RAMS and risk management process in it. To do so, the related processes are analyzed and modeled first. Then an integrated process model is developed. The resulting model is equipped with the traceability among the data and interfaces that are generated from the T&E and RAMS/risk processes. As a case study, the model developed is applied in tanks development. The effective use of the traceability is expected to reduce the time and cost required to complete T&E process.

A Study on the Design Methodology of SE-Based Military Force Construction in Defense Acquisition Process (Focusing on Influencing Factor Priorities) (국방획득 과정에서 SE개념 기반의 군사력건설 설계 방법론 연구(영향요인 우선순위 결정 중심으로))

  • Kim, Heung Bin;Seo, Je Hyeon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.15 no.2
    • /
    • pp.87-97
    • /
    • 2019
  • This paper focuses on the SE concept based on the weapon system design, which is the lack of systematic research at the stage of military requirements creation prior to acquisition management phase. Influence factors were derived by focusing on the core issues that were at issue in the process of requirements analysis, requirements verification, and business management in recent years. Next, the impact factor was prioritized using the AHP technique and then alternatives were suggested. As a result, through the hierarchical analysis process, 'substantiation of necessity' was found to be the most important factor in the large category, and 'satisfaction of the operating concept' was the most important factor. In addition, as a result of calculating the final weight for each nutritional factor, it was analyzed in order of 'enemy threat response ability', 'response to operational environment change', 'performance considering operational environment', and 'guaranteed power generation'. The results of this analysis suggest which factors should be focused on, firstly, based on the concept of SE by the military and JCS.

Autonomous Compensation of Thermal Deformation during Long-Time Machining Process (공작기계 장시간 가공중 열변형의 CNC 자율보정 기술)

  • Kim, Dong-Hoon;Song, Jun-Yeob
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.31 no.4
    • /
    • pp.297-301
    • /
    • 2014
  • The biggest factors, which lower the machining accuracy of machine, are thermal deformation and chatter vibration. In this article, we introduce the development case of a device and technology that can automatically compensate thermal deformation errors of machine during long-time processing on the machine tool's CNC (Computerized Numerical Controller) in real time. In machine processing, the data acquisition of temperature signal in real time and auto-compensation of the machine origin of machine tools depending on thermal deformation have significant influence on improving the machining accuracy and the rate of operation. Thus, we attempts to introduce the related contents of the development we have made in this article : The development of a device that embedded the acquisition part of temperature data, linear regression to get compensation value, compensation model of neural network and a system that compensates the machine origin of machine tool automatically during manufacturing process on the CNC.

A Study on the Selection of Alternatives for Flight Attendants to Adapt Flying Conditions using the Analytic Hierarchy Process (AHP를 이용한 공중승무원 비행환경 적응장비 획득방안 선정에 관한 연구)

  • Seol, Hyeon-Ju;Kim, Gyu-Ho;Jung, Hyun-Wook;Cho, Hwan-Kee;Hwang, Chang-Su
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.12 no.4
    • /
    • pp.460-468
    • /
    • 2009
  • The purpose of this study is propose an alternative for flight attendants to acquire equipment that could enhance the ability to adapt in flying conditions. Introducing and acquiring weapon system, such equipments should be deeply considered in multilateral aspects; reinforcements in the overall strategic status in the army, the ramifications that can contribute to military resources, and economic situations in the country. To do this, we first induced several criteria that can be used for evaluating alternatives. After that, we applied the analytic hierarchy process(AHP) approach to putting all factors into considerations in decision making for equipment acquirement. The results of this study are expected to have usefulness in formulating strategies and policies in selecting equipment acquisition alternatives for flight attendants.

Acquisition of Direct-Sequence Cellular Communication System for Code Division Mutlipie Access (부호 분할 다원 접속을 위한 직접 확산 셀룰라 통신 시스팀의 동기)

  • 전정식;한영열
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.18 no.2
    • /
    • pp.207-217
    • /
    • 1993
  • In this paper, knowing a priori probability of phase offset between transmitted codes and reference codes in the receiver, we construct the state diagram of acquisition process of the direct sequence spread-spectrum communication system using the expanding window search. The scannings are performed from the cell with higher probability code epoch synchronization to that with lower one. We expand window size from initial value by r times of its previous size in each search, construct the corresponding the state diagrams, and derive average synchronization time using the Markov process and Mason's gain formula. Average synchronization times versus number of search n and detection probability $P_d$ are calculated.

  • PDF

Risk Management for R&D Projects in the Military Aircraft Systems (군용항공기 연구개발 사업의 리스크 관리)

  • Kim, Sung Hun;Lee, Hyun Cheol
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.4
    • /
    • pp.76-84
    • /
    • 2021
  • Military aircraft R&D projects require large-scale investment in cost and time, and involve a complex coordination process in decision-making. The R&D project manager should determine the development management priorities as accurately as possible and focus on R&D capabilities, thereby reducing the risks of the aircraft R&D project. To this end, this study aims to reduce R&D risk by prioritizing cost, schedule, and performance, which are basic management factors used in R&D project management in defense project management regulations. Analytic Hierarchy Process (AHP) is applied using a questionnaire for managers in charge of aviation R&D under the Defense Acquisition Program Administration. As a primary result, the importance of the factors that the aircraft R&D project manager should consider was derived in the order of performance, cost, and schedule, and the priorities of performance and cost in the lower layer were also identified. In addition, in order to provide practical risk management measures to aircraft R&D project managers, the results of analyzing 28 cases of US National Transportation Safety Board accidents were compared and analyzed with the AHP analysis results, and management measures suitable for the situation were specified.

Study of Acquiring the Credibility for Weapon System M&S with V&V Process (검증 및 확인(V&V) 절차를 통한 무기체계 M&S 신뢰도 확보에 관한 연구)

  • Kim, Seok-Woo;Park, Sanghyuk
    • Journal of the Korea Society for Simulation
    • /
    • v.24 no.3
    • /
    • pp.1-8
    • /
    • 2015
  • Verification, Validation & Accreditation (VV&A) process is widely applied in various disciplines as a method of acquiring the credibility for M&S tools. The guideline of VV&A states that the detailed process can be established flexibly according to the needs and the availability of resources. For example, DAPA (Defense Acquisition Program Administration) guideline suggests that the accreditation process in the VV&A can be omitted if necessary. On this study, we first introduce and describe V&V process. Accreditation process is omitted due to limited time and resources. However, the proposed V&V is sufficient for our needs. Finally, we apply the proposed process of V&V to the System-Integrated Simulator of "Raybolt", Medium-Range Infantry Missile System, for the acquisition of the M&S credibility.

A Study on Efficient Test & Evaluation Methods in Naval Ship Acquisitions (함정사업 시험평가의 효율적 수행방안에 관한 연구)

  • Kim, Jaeyong;Choi, Woensug;Hong, Sukyoon;Chung, Hyungyun;Song, Jeehun;Im, Wooseok;Kwon, Hyunwung
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.19 no.6
    • /
    • pp.703-711
    • /
    • 2016
  • The purposes of this study is to identify the problems arising from current Test & Evaluation process of the naval ship acquisition program and to suggest methods to increase the acquisition efficiency. Considering that the present rule of developmental test &evaluation(DT&E) and operational test & evaluation(OT&E) has caused an inefficiency effect on the acquisition procedures due to the limited practices on it, the DT&E and OT&E procedures through test & evaluation master plan(TEMP) is proposed based on the selective practices of the defense instruction articles. Also, considering characteristics of naval ship acquisitions, efficient procedure systems are derived through case analysis results by comparing each performances of the system. The suggested methods are able to meet the requirements of the changed acquisition environments and also increase efficiency of acquisition systems by adoption of DT&E and OT&E combined test scheme.