In this paper, we deal with an allocation model of vertical type container yard for minimizing the total ATC (Automated Transfer Crane) working time and the equivalence of ATC working load in each block on automated container terminal. Firstly, a layout of automated container terminal yard is shown The characteristic of equipment which work in the terminal and its basic assumption are given Next, an allocation model which concerns with minimizing the total working time and the equivalence of working load is proposed for effectiveness of ATC working in automated container terminal. Also, a weight values on critical function are suggested to adjust the critical values by evaluating the obtained allocation plan. For ATC allocation algorithm, we suggest a simple repeat algorithm for on-line terminal operation.
Proceedings of the Korean Society of Precision Engineering Conference
/
1997.10a
/
pp.446-449
/
1997
Yard cranes are very useful equipments for handling of heavy containers. But rope-driven yard cranes must have a little of sway and skew motion because ropes arc passive mechanical device. So many researches have been concentrated on anti-sway algorithm controlling trolley speed. But control algorithm of trolley speed is not practical in windy weather. In this paper, we are going to propose a new structure for anti-sway. This structure uses aux. :opes. The control strategy with auxiliary rope is very useful to sway control of yard crane because rope length is shorter than quay-sidc container cranes. In this paper, we derive cquatlons of motion of trolley system which have anti-sway controller to use auxiliary rope. And we propose the control strategy and analyse the behavior of the proposed system.
Kim, Kap-Hwan;Kim, Hong-Bae;Yun, Won-Young;Kim, Jong-Hoon;Kwon, Bong-Jae;Cho, Chi-Wun
IE interfaces
/
v.11
no.1
/
pp.105-117
/
1998
A decision support system is introduced for the efficient operation of port container terminals. It consists of ship planning subsystem, yard planning subsystem, resource management subsystem, real-time control subsystem, and simulation subsystem. The system is intended to support the planning process of the planners and the operation process of the administrators in the container terminals. It is assumed that the transfer cranes and the yard tractor/trailers are used to handle containers in the marshaling yard. The system is explained in terms of the functions of each subsystem and the data flows among various subsystems.
This Paper discusses how to estimate the container yard space of a port container terminal as well as how much the Inventory level of containers Is affected by related factors such as allowable dwell time for containers, handling volume per containership, and loading/unloading productivity of a port container terminal. Under the assumption of static relations among the factors, a model for estimating the container yard space is suggested. In terms of arrival patterns of containers, sub-models for export, import, and transshipment containers are constructed separately. A numerical example and the sensitivity analysis for some parameters are provided to help intuitive understanding the characteristics of the suggested model. The experimental results show that the allowable dwell time for containers is the most critical one of the factors to influence on the maximum Inventory level of containers.
In order to cope with improvement of labor cost and cargo volume, Korean ports, especially Busan port, are in need of many new facilities. Of course, current facilities should be fully used, and at the same time it needs to make every effort to maximize its productivity as well as cost saving. To this end, this study has decided to focus on automatic yard operation suitable to the domestic container terminal environments, making a survey of many advanced container terminals, trying to find out their common factors, and finally suggesting several alternatives based on the combination of these factors. Also, this study has suggested the present value of initial investment and operating cost by alternative, and at the same time presented the relationship between cargo handling volume and cost/revenue of the optimal alternative, so that it may be of help in decision making.
Korean Journal of Computational Design and Engineering
/
v.14
no.6
/
pp.374-381
/
2009
To meet the soaring demand recently, South Korea big shipbuilders are examining two things. One is new investment in plant and equipment. The other is replacement of production resources. Considering plant & equipment investment and replacement of production resources, even if actual production ability would be enough, the real output could be affected by limitation of logistics with lack of analysis. As we set up big shipyard in virtual space, we could perform actual production by using confirm production plan in virtual space. We've analyzed the load of block stock, load of road and load of transporter for logistics effects are followed by production increase. This research is to determine the possible problems of those analyzed results and to present the resolution using the current layout. And then modified yard layout, we reanalyzed previous three logistics effects. This simulation model could help administrator to make rational decision for changing yard layout.
One of the most important objectives of the schedules in a container terminal is to minimize the ship operation time, which consists of discharging and loading operation times. Recently, dual cycling techniques have been used for improving terminal operations, especially for reducing the total empty trips of handling equipment. The main focus of this study is to reduce the empty trip times of yard trucks with minimum delays for ship operations. A heuristic algorithm, modified from a previous algorithm, is proposed to solve this problem. A simulation study is conducted to evaluate the effect of different types of discharging and loading schedules and different locating methods for discharging containers in terms of the performance of the system, including the percentage of the dual cycle operations of yard trucks.
A yard in a container terminal is a temporary storage space before containers are loaded onto the target vessel or delivered to consignees. For improving the utilization of the space in the yard and the efficiency of loading and discharging operations, it is important that operation plans must be carefully constructed in advance. A heuristic method is suggested to solve operation space planning problems considering workloads on handling equipment as well as space availabilities. The operation plans in this paper includes quay crane (QC) schedules and space plans for multiple vessels considering the workload in the container yard of container terminals. This paper evaluates the effectiveness of a space planning method and the performance of a new QC scheduling method using a simulation model.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
1999.10a
/
pp.309-314
/
1999
The major movement block of the containers is range between apron and designation points on yard in container terminal. The yard tractor operated by human takes charge of it's movement in conventional container terminal. In unmanned container terminal, UCT(unmanned container transporter) has charge of the yard tractor's role and the navigation path is ordered from upper level control system. The unmanned container terminal facilities must have docking system that guided landing line to have high speed travelling and precision positioning in unmanned container terminal. The general method for docking uses the vision system with CCD camera, infra red, and laser. This paper describes the investigation for the developed docking method in view point of merit and demerit and introduces 속 result of developing the docking system with LSB(laser slit beam).
The present headway on KNR(Korea National Railway) lines varies from 6 to 10 minutes depending on the each line and by the operation of High Speed line in 2004, the bottleneck would be expected within a few sections such as Daejeon-Daejeon shunting yard which will be the common mute between KTX(Korea Train Express) and conventional trains. Therefore, KNR would like to reduce the headway of the all lines by 4 minutes with the implementation of ERTMS/ETCS on-board system. Where ETCS(European Train Control system), the subsystem of ERTMS, is Automatic Train Protection system for safety train running. This study will be analyze expected braking distance and running time depending on characteristics of conventional passenger and freight trains and high speed train will be operated within electrified conventional line for comparing the headways of ATS(Automatic Train Stop) system and ETRMS/ETCS system within the Daejeon-Daejeon shunting yard section.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.