In this paper, we Investigated effects on impurities and water of semiconductive shield through a thermal, mechanical, and absorption experiment to estimate performance of insulating materials in power cable. Specimens had been prepared 22[kV], 154[kV] XLPE power cables and then were made of sheet form with XLPE and semiconductive shield with dimension of 0.4[mm] ~1.2[mm] of thickness from power cable. Heat capacity $({\Delta}H)$ and glass trasition temperature (Tg) of XLPE sheet were measured by DSC (Differential Scanning Calorimetry). We could know that thermal stabilities of 154[kV] are more excellent than 22[kV] from this experimental result. The strain of mechanical properties in 22[kV] and 154[kV] XLPE was 486[%], 507[%] and stress was 1.74$[kgf/mm^2]$, 1.80$[kgf/mm^2]$. The absorption contents of existing semiconductive shield were measured 710[ppm] to 1,090[ppm], and semiconductive shield of 22[kV] cable was measured 14,750[ppm] to 24,780[ppm]. We thermal and mechanical properties of 154[kV] could know more excellent than 22[kV] from this experimental result.
지중전선로에 있어서 케이블을 연결하는 중간 접속재에 발생하는 전계 집중, 각종 불순물의 침투 및 케이블 절연층의 손상은 궁극적으로 열화 및 절연파괴를 야기하게 되어 케이블의 수명을 단축시키고 있다. 본 연구에서는 경계요소법을 이용하여 초고압 케이블 절연재료로 널리 사용되고 있는 가교폴리에틸렌과 접속재 키트의 절연층으로 사용되고 있는 EPDM의 전계분포를 시뮬레이션 하였다. 시료는 두께 1[mm]로 3장을 중첩한 것으로 모델링하여 컴퓨터 시뮬레이션을 하였다. 전계해석 결과 보이드 내부의 defect는 silicone oil에 의해 전계집중을 약화시킴을 확인하였고, XLPB보다 EPDM의 전계분포가 낮게 유지됨을 확인하였다.
Recently, on power system, it is used to high voltage of transmission and distribution due to safe power supply and have high quality and insulation in order to satisfy excellent insulator. Thus, according to underground of high voltage cable, is occurred break down by ground short. Therefore, it is used to high quality XLPE power cable to interrupt instantaneous voltage drop. If it appear inner defect for cable whose have high quality and insulation, it is reduced rapidly due to concentration of electrical field. After assemble to manufacture, in order to inspect cable condition, it is decided much inspection standard. In this paper, In inner defect of assembling cable at manufacture, for measure the variation of insulation condition by void. it tested the variation of insulating characteristics, using $\phi$-q-n distribution variation in partial discharge experiment.
We constructed an on-line PD monitoring system for the 380kV U/G Cable project at the Riyad 9012 substation in Saudi-arabia. The system will be monitoring the termination of the two 380kV XLPE Cables to prevent unexpected failure of the cable insulation. The system had been tested in the laboratory and on-site for detection of various PD signals and reliability of operation. The system distinguish the existence and nonexistence of the partial discharge and then judge the source of partial discharge using automatic PD pattern recognition software.
In this paper, it is attempted to distinguish the charged particles and to judge the polarity by the use of Thermally Stimulated Current(TSC) and Temperature Gradient Thermally Stimulated Surface Potential Measurement(TG-TSSP)with experimental insulation material XLPE-EVA for power cables which is made by blending cross-linked polyethylene(XLPE) and ethylene-vinylacetate copolymer(EVA). In addition, it is performed to investigate the effect of EVA blending. From the experimental results, it is known that for the case of XLPE-EVA blended experimental material, the generation of space charged electric field is not obtained in the high temperature region due to the obatruction of the injection of trapping carrier by the electron and the positive hole.
The needle electrode was inserted in virgin and 1.000 hr aged XLPE which is the insulation used for 22.9 kV underground distribution cable with the distance of 1, 1.5 and 2mm respectively. Breakdown voltage were measured for the virgin and 1.000 hr aged specimen and statistically evaluated through Weibull distribution. As the of electrode increase in virgin and 1.000 hr aged specimen. shape parameter and scale parameter showed increase coincidently. For shape parameter, the value of aged specimen showed the higher than that of virgin specimen.
The purpose of termination for high voltage tests of XLPE power cable is to prevent flashover during the breakdown test of specimen as well as to withstand the specified voltage between its conductor and screen without failure. For easier treatment and simpler construction of testing termination, resistivity grading method using semi-conductive material was employed. Based on the fundamental theory, its failure characteristics by changing the resistivity of semi-conductive material on the insulation surface was investigated. With two layers construction by difference resistivity on their surfaces, much improved result than that of one resistivity was obtained through the experiment for MV cable.
In this thesis, it is investigated that the effect of the cross linked polyethylene(XLPE) insulator do to breakdown phenomenon by the insertion of the needle and bar electrode into XLPE which is used of electric power cable for the ultra-high voltage. The result of the partial discharge properties in the specimen showed that in case of the insertion of needle or bar electrode into XLPE, the effect of the inner discharge become large when the air void is bigger then the clearance of the electrode of the specimen. The closer the distance between the insulator and needle electrode, it takes less time to the insulation breakdown.
We studied about electrical, chemical and mechanical characteristics of XLPE by dicumyl peroxide(DCP) and trimethylolpropane triacrylate(TMPTA) content ratio. DCP content was changed from 1.0 to 2.Sphr increasing 0.5phr. TMPTA content was changed 0.5 to 1.5phr increasing 0.5phr. Thermal analysis (DSC) was carried out in order to observe tendency of Tg according to DCP and TMPTA content. Tensile strength was measured in order to observe mechanical strength. In experimental results, content DCP 2.0phr and TMPTA 1.0phr has highest breakdown strength. Content DCP 2.0phr and TMPTA 0.5phr has lowest dielectric constant. Tendency of Tg did not affected by DCP and TMPTA content. Breakdown strength and Specific inductive capacity was measured.
한국전기전자재료학회 2002년도 춘계학술대회 논문집 유기절연재료 전자세라믹 방전플라즈마 일렉트렛트 및 응용기술
/
pp.148-151
/
2002
In order to prevent the failures of underground distribution power cables we need to measure insulation condition in the field. Until now we used DC high voltage as a power source for the cable diagnosis but it was not proper method to the XLPE insulation cables because DC high voltage can affect sound insulation and can't diagnose exactly insulation degradation. For these reasons we imported isothermal relaxation current measurement system called by KDA-1 from germany but it's reliability did not proved in our URD cables. DC voltage decay measurement system was developed by domestic company but they don't have field experience. In this paper we tried to prove reliability of these two systems in the field. Through the field diagnosis and Ac breakdown test the two systems showed similar results.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.