A SIMULATION MODEL FOR DECIDING AN OPTIMIZED 3D SHAPE OF CONSTRUCTION WORKSPACE CONSIDERING RESOURCES IN BIM ENVIRONMENT

  • Hyoun Seok Moon;Hyeon Seung Kim;Leen Seok Kang;Byung Soo Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.163-168
    • /
    • 2013
  • A construction workspace is considered as a critical factor to secure constructability and safety of a project. Specially, optimized size of each workspace helps to minimize any conflicts between workspaces, works and resources within a workspace in the construction site. However, since an existing method for making a decision workspace's size depends on generally experiences of managers and work conditions of activity, it is difficult to perform safe works considering feasible workspace size. The workspace size is changed according to the quantity of resources allocated into each activity as time progresses. Accordingly, it is desirable that optimized workspace size considering input size of resources is determined. To solve these issues, this study configures an optimized model for deciding standard size of workspaces by simple regression analysis and develops a visualized scenario model for simulating the optimized workspace shape in order to support BIM (Building Information Modeling) environment. For this, this study determines an optimized resource shape size considering maximum working radius of each resource and constructs its visual model. Subsequently, input size of resources for each activity is estimated considering safety execution area of resources and workspaces. Based on this, an optimized 3D workspace shape is generated as a VR simulation model of a BIM system based on the suggested methodologies. Moreover, operational feasibility of the developed system is evaluated through a case study for a bride project. Therefore, this study provides a visualized framework so that project managers can establish an efficient workspace planning in BIM environment. Besides, it is expected that constructability, productivity and safety of the project will be improved by minimizing conflicts between workspace and congestions between resources within a workspace in the construction phase.

  • PDF

Spatiotemporal chronographical modeling of procurement and material flow for building projects

  • Francis, Adel;Miresco, Edmond;Le Meur, Erwan
    • Advances in Computational Design
    • /
    • 제4권2호
    • /
    • pp.119-139
    • /
    • 2019
  • Planning and management building projects should tackle the coordination of works and the management of limited spaces, traffic and supplies. Activities cannot be performed without the resources available and resources cannot be used beyond the capacity of workplaces. Otherwise, workspace congestion will negatively affect the flow of works. Better on-site management allows for substantial productivity improvements and cost savings. The procurement system should be able to manage a wider variety of materials and products of the required quality in order to have less stock, in less time, using less space, with less investment and avoiding multiple storage stations. The objective of this paper is to demonstrate the advantages of using the Chronographic modeling, by combining spatiotemporal technical scheduling with the 4D simulations, the Last Planner System and the Takt-time when modeling the construction of building projects. This paper work toward the aforementioned goal by examining the impact that material flow has on site occupancy. The proposed spatiotemporal model promotes efficient site use, defines optimal site-occupancy and workforce-rotation rates, minimizes intermediate stocks, and ensures a suitable procurement process. This paper study the material flow on the site and consider horizontal and vertical paths, traffic flows and appropriate means of transportation to ensure fluidity and safety. This paper contributes to the existing body of knowledge by linking execution and supply to the spatial and temporal aspects. The methodology compare the performance and procurement processes for the proposed Chronographic model with the Gantt-Precedence diagram. Two examples are presented to demonstrate the benefits of the proposed model and to validate the related concepts. This validation is designed to test the model's graphical ability to simulate construction and procurement.