A SIMULATION MODEL FOR DECIDING AN OPTIMIZED 3D SHAPE OF CONSTRUCTION WORKSPACE CONSIDERING RESOURCES IN BIM ENVIRONMENT

  • Hyoun Seok Moon (Dept. of Civil and Environmental Engineering, University of Michigan) ;
  • Hyeon Seung Kim (Dept. of Civil Engineering, Gyeongsang National University) ;
  • Leen Seok Kang (Dept. of Civil Engineering, Gyeongsang National University) ;
  • Byung Soo Kim (Dept. of Civil Engineering, Gyungpook National University)
  • Published : 2013.01.09

Abstract

A construction workspace is considered as a critical factor to secure constructability and safety of a project. Specially, optimized size of each workspace helps to minimize any conflicts between workspaces, works and resources within a workspace in the construction site. However, since an existing method for making a decision workspace's size depends on generally experiences of managers and work conditions of activity, it is difficult to perform safe works considering feasible workspace size. The workspace size is changed according to the quantity of resources allocated into each activity as time progresses. Accordingly, it is desirable that optimized workspace size considering input size of resources is determined. To solve these issues, this study configures an optimized model for deciding standard size of workspaces by simple regression analysis and develops a visualized scenario model for simulating the optimized workspace shape in order to support BIM (Building Information Modeling) environment. For this, this study determines an optimized resource shape size considering maximum working radius of each resource and constructs its visual model. Subsequently, input size of resources for each activity is estimated considering safety execution area of resources and workspaces. Based on this, an optimized 3D workspace shape is generated as a VR simulation model of a BIM system based on the suggested methodologies. Moreover, operational feasibility of the developed system is evaluated through a case study for a bride project. Therefore, this study provides a visualized framework so that project managers can establish an efficient workspace planning in BIM environment. Besides, it is expected that constructability, productivity and safety of the project will be improved by minimizing conflicts between workspace and congestions between resources within a workspace in the construction phase.

Keywords

Acknowledgement

A part of this work was supported by the National Research Foundation of Korea (NRF) grant funded by the Korea government (No. 2011-0016064).