• Title/Summary/Keyword: Work zone

Search Result 601, Processing Time 0.031 seconds

Estimation of Capacity at Two-Lane Freeway Work Zone Using Traffic Flow Models of Each Vehicle-Type (차종별 교통류 모형을 이용한 편도 2차로 고속도로 공사구간 용량 산정)

  • Park, Yong-Jin;Kim, Jong-Sik
    • International Journal of Highway Engineering
    • /
    • v.13 no.3
    • /
    • pp.195-202
    • /
    • 2011
  • The purpose of this study is to estimate the capacity of two-lane freeway work zone blocking one lane using traffic flow models of each vehicle-type. Firstly, three traffic flow models of three different vehicle-types were developed using the data collected from each at the beginning and the ending point of the work zone. For each model, the maximum flow rate of three vehicle-types were calculated respectively. Maximum flow rate at the work zone was recalculated using passenger car equivalent value and percentage of vehicle-type. Secondly, traffic flow model using passenger car equivalent volume data was developed using the data collected from each at the beginning and the ending point of the work zone. Maximum flow rate for the work zone was calculated along. Two values of maximum flow rates through the work zone were compared and evaluated as the capacity of the work zone. This study found that the maximum flow rate of the work zone at the beginning point was less than that at the ending point because of impedance such as lane changing behaviors before entering the work zone. The capacity of two-lane freeway work zone blocking one lane was estimated 1,800pcphpl.

Prioritization of Potential Technology for Establishing a Safe Work Zone Environment (안전한 도로 공사구간 환경 구축에 필요한 기술의 우선순위 선정)

  • Kim, Jin Guk;Yang, Choong Heon;Yun, Duk Geun
    • International Journal of Highway Engineering
    • /
    • v.17 no.6
    • /
    • pp.117-126
    • /
    • 2015
  • PURPOSES : This study prioritizes potential technology for establishing a safe work zone environment on roadways. We consider almost all conceivable technologies that enable mitigation of unexpected accidents for both road workers and drivers. METHODS : This study suggests a methodology to set the priority of potential technology for establishing a safe work zone environment by using the analytical hierarchy process (AHP). For this purpose, the AHP structure was first developed. Thereafter, a web-based survey was conducted to collect experts' opinions. Based on the survey results, weights associated with the relevant criteria of the developed structure were estimated. With the consistency index (CI) and consistency ratio (CR), we verified the estimated weights. In addition, a sensitivity analysis was performed to confirm whether the estimated weights were reliable. We finally proposed the priority for potential technology for establishing a safe work zone environment on roadways. RESULTS : In the first level, safety technology has the highest priority, and real-time information delivery for work zone, hazard warning for drivers, and temporal automated operation for traffic facilities were selected in the second level of hierarchy. CONCLUSIONS : The results imply that establishing the priority will be useful to establish a future road map for improving the work environment for road workers and drivers by employing appropriate protection facilities and developing safety systems.

A Study on Level-of-Service Changes of Expressway in Accordance with the Revision of Traffic Capacity at Work-Zone (교통용량 개정에 따른 고속도로 공사구간의 서비스 수준에 대한 연구)

  • Ryu, SungWoo;Park, Kwon-Jea;Han, SeungHwan;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.16 no.3
    • /
    • pp.109-117
    • /
    • 2014
  • PURPOSES : This study analyzes the available working time at work-zone on the Expressway in accordance to the new capacity manual. METHODS : Sensitivity analysis on variables were conducted to calculate the adjusted capacity at work-zone based on previous researches. RESULTS : The main factors which affect available working time at the work-zone were its capacity, number of lanes, terrain and lane width. Other factors have minimal effect on the available working time. Based on the analysis, a calendar of lane closures was suggested. CONCLUSIONS : A series of studies concluded that the capacity at work-zone in the new capacity manual reduced to 76-82% of the existing manual. As such, the available working time decreased. Furthermore, the factors affecting the available working time needs to be considered when making a plan to rehabilitate the distressed pavement.

Determination of Base Capacity Values for Short-Term Freeway Work Zone (고속도로 단기공사구간 기본용량 결정에 관한 연구)

  • Kim, Sang Gu;Hong, Gil Seong
    • Journal of Korean Society of Transportation
    • /
    • v.31 no.1
    • /
    • pp.37-46
    • /
    • 2013
  • Lane closure in freeway work zone due to maintenance and repair of freeway facilities results in abrupt change of traffic flow. Sudden change of traffic flow results strong interactions among vehicles, and reduces capacity compared to the ordinary traffic condition. Such capacity reduction is likely to cause congestion, traffic queues, and economic loss cost. This study aims to determine the base capacity for a short-term freeway work zone that can be used to establish a work zone schedule in advance without any traffic impact. First, the research collected detector data and schedule data of road works on all freeways in Korea. Second, the research determined 23 study sites finding the capacity values of work zone after matching two kinds of data. All study sites had varying characteristics regarding traffic flow being adjacent to work zone during road works. The capacity values were reviewed in terms of lane closure configuration, the types of work, and design speed. Finally, research proposed capacity values for a short-term freeway work zone with the design speeds of 100 kph, 120 kph and 1,700 pcphpl, 1,750 pcphpl, respectively.

A Study on Logistical Distribution Management and Safety in Thailand's Highway Work Zone: The case of Logistics Drivers

  • MAHASIRIKUL, Narongdet;AKSORN, Preenithi;SRINAVIN, Korb;NGOWTANASUWAN, Grit
    • Journal of Distribution Science
    • /
    • v.20 no.3
    • /
    • pp.23-31
    • /
    • 2022
  • Purpose: The purpose of this study is to analyze the Safety and Logistical Distribution Management system in Thailand's Highway Work Zone based on data from Logistics drivers. Accidents in highway construction zones have caused enormous casualties in Thailand yearly. Statistical data shows evidence of correlation between numbers of accidents and drivers' recklessness. Research design, data, and methodology: In this study, we conducted an in- depth interview with 414 logistics drivers and highway construction workers in Khon Kaen province, Thailand. The data was collected based on 63 questionnaires aiming at capturing factors contributing to the risk of safety and cause of accidents in logistic infrastructures such as Highway work zone. Results: The result reveals two significant factors affecting safety in highway work zone, which includes construction environment and safety management system. Moreover, the result shows that feeling of afraid and confused while driving within the construction zones significantly affecting driver's risk of having an accident. Conclusions: The findings of this study offer that a strategic planning and evaluation of the logistics drivers' satisfaction and construction workers' participation to mitigate highway accidents at construction zones and that drivers' knowledge and perception toward construction safety management plays a significant role in preventing highway accidents at the construction areas.

Development of a Theoretical Model for Predicting Contaminant Concentrations in a Multi-zone Work Environment (다구획 작업환경에서의 오염농도 예측을 위한 이론적 모델의 개발)

  • Cho, Seok-Ho
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.21 no.4
    • /
    • pp.185-192
    • /
    • 2011
  • To predict contaminant concentrations within a multi-zone work environment, an air quality model in the work environment was developed. To do this, airflow equations on the basis of orifice equation were solved by using the Conte and De Boor scheme, and then equations for the conservation of mass on contaminant were solved by using the fourth-order Runge-Kutta algorithm. To validate the accuracy of simulated results, this model was applied to the controlled environment chamber that had been tested in 1998 by Chung KC. The comparison of predicted concentrations by this study with measured concentrations by the Chung KC indicated that the average deviations were 2.66, 3.35, and 3.15% for zone 1, zone 2, and zone 3, respectively. Also, this model was applied to a working plant with four zones. Thus, the results of contaminant concentration versus time were predicted according to the schedule of the openings operation, and case studies were done for four cases of the openings operation to investigate the interaction of airflow and contaminant concentration. The results indicated that opening operation schedules had a significant effect on contaminant removal efficiency. Therefore, this model might be able to apply for the design of ventilation schedules to control contaminants optimally.

Development of Work Zone Traffic Control Algorithm for Two Lane Road (공사구간 교대통행 동적제어 알고리즘 개발)

  • Park, Hyunjin;Oh, Cheol;Moon, JaePil
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.16 no.2
    • /
    • pp.23-35
    • /
    • 2017
  • Work zone traffic control is of keen interest because both traffic operations and safety performances are directly affected by traffic management methods. In particular, work zone traffic on two-lane roads needs to be managed in more efficient and safer manners due to its unique characteristics of alternative right-of-way assignment. This study developed a dynamic control algorithm that can be used for real-time operations of two-lane work zone traffic. The performance of the developed algorithm was evaluated by VISSIM microscopic traffic simulator. An applied programming interface (API) based program was developed to plug-in the control algorithm onto the simulator. The results demonstrated the feasibility of the proposed control algorithm for two-lane work zone.

Identification of Factors Affecting the Crash Severity and Safety Countermeasures Toward Safer Work Zone Traffic Management (공사구간 교통관리특성을 고려한 고속도로 교통사고 심각도 영향요인 분석 및 안전성 증진 방안)

  • YOON, Seok Min;OH, Cheol;PARK, Hyun Jin;CHUNG, Bong Jo
    • Journal of Korean Society of Transportation
    • /
    • v.34 no.4
    • /
    • pp.354-372
    • /
    • 2016
  • This study identified factors affecting the crash severity at freeway work zones. A nice feature of this study was to take into account the characteristics of work zone traffic management in analyzing traffic safety concerns. In addition to crash records, vehicle detection systems (VDS) data and work zone historical data were used for establishing a dataset to be used for statistical analyses based on an ordered probit model. A total of six safety improvement strategies for freeway work zones, including traffic merging method, guidance information provision, speed management, warning information systems, traffic safety facility, and monitoring of effectiveness for countermeasures, were also proposed.

The Effect of the Tied Sleeper on the Maintenance Work in the Rail Expansion Joint Zone (레일신축 이음부 유지보수 작업에 대한 침목결속의 영향)

  • Bae, Hyun-Ung;Kang, Tae-Ku;Choi, Jin-Yu;Jeong, Won-Ik;Lim, Nam-Hyoung
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2125-2128
    • /
    • 2011
  • The continuous welded rail(CWR) track without the rail expansion joint has many advantages over the conventional track in a variety of fields including the speed-up and the ride comport. However, due to the excessive axial force in the CWR and the track-bridge interactive behavior, inevitably, the rail expansion joint must be installed at the vulnerable zone such as the bridge end zone, etc. In this rail expansion joint zone, the frequency of the maintenance work to repair the track irregularity is on the rise. This is because that the creep of the sleeper is occurred in the moveable zone of the rail expansion joint. In this study, among the several options for reducing the track irregularity on the rail expansion joint zone, the application and efficiency of the tied sleeper is investigated. Field test construction has been conducted, then the progress of the track irregularity and the frequency of the maintenance work are analyzed before and after the filed test construction.

  • PDF

컨베이어 벨트를 이용한 혼합 모델 조립 라인에서의 미완료 작업량을 최소화하기 위한 제품 투입 순서 결정

  • 김시원;정봉주
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.10a
    • /
    • pp.157-160
    • /
    • 2000
  • This study is concerned with how to optimize the Input sequence of product models with sequence -dependent setup time in Mixed-Model Assembly Line (MMAL) using conveyor system. Usually MMAL consists of a number of stations linked by conveyor belt and each station has a work zone limited by upstream and downstream boundaries. To avoid improper interference between operators in the adjacent stations and excess of machine moving range, operators are forced to complete their operations within their predetermined work zone. In this study, our goal is to determine sequence of models for minimizing the total work unfinished within their work zone. A generalized formulation of the product sequencing problem in MMAL is presented and we developed an optimal procedure using Branch & Bound. Also we developed a heuristic procedure using local search.

  • PDF