• Title/Summary/Keyword: Work simulation

Search Result 3,259, Processing Time 0.025 seconds

Computerized Human Body Modeling and Work Motion-capturing in a 3-D Virtual Clothing Simulation System for Painting Work Clothes Development

  • Park, Gin Ah
    • Journal of Fashion Business
    • /
    • v.19 no.3
    • /
    • pp.130-143
    • /
    • 2015
  • By studying 3-D virtual human modeling, motion-capturing and clothing simulation for easier and safer work clothes development, this research aimed (1) to categorize heavy manufacturing work motions; (2) to generate a 3-D virtual male model and establish painting work motions within a 3-D virtual clothing simulation system through computerized body scanning and motion-capturing; and finally (3) to suggest simulated clothing images of painting work clothes developed based on virtual male avatar body measurements by implementing the work motions defined in the 3-D virtual clothing simulation system. For this, a male subject's body was 3-D scanned and also directly measured. The procedures to edit a 3-D virtual model required the total body shape to be 3-D scanned into a digital format, which was revised using 3-D Studio MAX and Maya rendering tools. In addition, heavy industry workers' work motions were observed and recorded by video camera at manufacturing sites and analyzed to categorize the painting work motions. This analysis resulted in 4 categories of motions: standing, bending, kneeling and walking. Besides, each work motion category was divided into more detailed motions according to sub-work posture factors: arm angle, arm direction, elbow bending angle, waist bending angle, waist bending direction and knee bending angle. Finally, the implementation of the painting work motions within the 3-D clothing simulation system presented the virtual painting work clothes images simulated in a dynamic mode.

Development of Exposure Level Prediction Program in Radioactive Waste Work (방사성 폐기물 작업 중의 피폭서량 예측 프로그램 개발)

  • Park, Won-Man;Kim, Yoon-Hyuk;Whang, Joo-Ho
    • Journal of the Ergonomics Society of Korea
    • /
    • v.24 no.2
    • /
    • pp.71-77
    • /
    • 2005
  • In spite of the importance of nuclear power as one of major electric energies in Korea, the nuclear safety has become the most serious social issue in the operation of the nuclear power plant. In this paper, a virtual work simulation program was developed to predict exposure dose during radiation work in radwaste storage. The work simulation program was developed. using $Java ^{TM}$applet and VRML-virtual reality modeling language. A numerical algorithm to find the optimal work path which minimize exposure dose during the given work, was developed and exposure dose on the optimal work path was compared with that on the shortest path. Comparing with the shortest path for the given work, the predicted optimal path consumed longer work time by II% but reduced total exposure dose by 46%. The simulation result showed that the exposure dose depended on not only work time, but also the distance between the worker and the radiation source. The developed simulation program could be a useful tool for the planning of radioactive waste work to increase the radiation safety of workers.

The Diffusion Period and Productivity of Smartwork by Business Simulation (비즈니스 시뮬레이션으로 살펴본 스마트워크의 확산 기간과 생산성 연구)

  • Jung, Byoungho
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.17 no.1
    • /
    • pp.57-73
    • /
    • 2021
  • The purpose of this study is to analyze the diffusion period and productivity of smartwork in an organization. Firms are increasingly interested in smartwork for non contact work and working from home because of the corona 19. The smartwork is a new technology that changes face-to-face work in an organization. It helps the work of individuals and organizations regardless of time and place. The theoretical background describes the complexity, system thinking, diffusion theory, smart work, organizational resistance, and productivity. This study analyzes the diffusion period and productivity of smart work through business simulation techniques. A simulation study progresses four stages. There are problem definition, hypothesis establishment and causal loop diagram, model construction and verification, and policy evaluation. The simulation models contain an individual's resistance variables organizational investment and leadership variables related to the operation of smartwork. The organizational investment variables include organizational culture, legal system, implement systems and technology investment. The individual resistance variables include cognitive, attitude, structure and technological resistance. The leadership includes leadership interest variables and performance linkage variables. The simulation executed the changes of a people number adopting smart work and the organizational productivity monthly. As a result of the simulation, many organization members have accepted the smart work innovation after 20 months. The organizational productivity through smart work showed very high value after 16 months. In scenario analysis, the individuals' awareness and attitude resistance showed very important variables to productivity and a personal change of smart work adoption. Meanwhile, The organizational investment showed that the high driving-force increased not productivity and the low driving-force showed decreased low productivity. Also, leadership variables showed a powerful driver for changing smart work productivity. The implication of the study has suggested extending complexity, diffusion theory and organization resistance theory based on simulation methods.

Work Planning Using Genetic Algorithm and 3-D Simulation at a Subassembly Line of Shipyard (유전자 알고리즘을 이용한 조선 소조립 로봇용접 공정 작업 계획 및 3-D 시뮬레이션)

  • 강현진;박주용;박현철
    • Proceedings of the KWS Conference
    • /
    • 2004.05a
    • /
    • pp.18-20
    • /
    • 2004
  • This study is to find the optimal work plan of robot welding in the subassembly process of shipbuilding and to verify the found solution through 3-D simulation. The optimal work plan was established by evenly distributing the work amount to each stage and finding the shortest work sequence. The shortest work sequence was found by using the genetic algorithm. The result was compared with the practically adopted case and verified through the 3-D simulation.

  • PDF

Production Line Planning for Functional Sports Wear using Simulation Model (시뮬레이션을 이용한 특수 고기능 의류업체의 생산라인 설계에 관한 연구)

  • 최정욱
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.26 no.8
    • /
    • pp.1205-1215
    • /
    • 2002
  • The purpose of this study was to develop a production line using simulation method, which could improve work allocation, labor utility and productivity. Using simulation software AIM, a simulation model of functional sports wear assembly line was developed. A functional sports wear production factory were analysed to gather data necessary for this research. Factory layouts, production facilities, work time of each unit jobs were investigated. The data obtained were used as to build a base simulation model. Then, the base simulation model was verified using the obtained data, such as daily productivity. Using simulation method, low alternative production plans were suggested, which were to enhance productivity, and work efficiency and to reduce queue length and throughput time.

Development of a Simulation Model for the Productivity Analysis of Form Work in Multi-Family Housing Construction projects (공동주택 거푸집 공사의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • Kang, Dong-Wan;Moon, Hyun-Seok;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.193-198
    • /
    • 2009
  • It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.

  • PDF

A simulation program practical use for an engineering improvement of the work-place (작업장의 공학적 개선을 위한 시뮬레이션 프로그램 활용)

  • Yang Hong Seok;Lee Kang bok;Youn Eui Sik;Kang Kyung Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2005.05a
    • /
    • pp.273-278
    • /
    • 2005
  • Prescribed according to the occupational safety and health low noise measurement method was changed to personal sampling in the method to measure an area noise. Such method had the limit which did not evaluated characteristic of sound of occurrence and the place of origin. This study was performed to establish an engineering remedy of the work-place noise. The subject was a vibration control process of the place of business in Pusan. A simulation program applied for an engineering improvement of the work-place noise. The results were as follows: 1. An noise occurrence level of the work-place before improvement was $88^{\sim}97dB(A)$, We applied an improvement method to be established and were expected to $80^{\sim}119dB(A)$. 2. The level of the noise-distribution to appear in the place of origin of the work-place before improvement was $90^{\sim}93dB(A)$ but, We executed the simulation after applied an engineering remedy and predicted $80^{\sim}85dB(A)$. A result of the simulation blue part was changed mostly into the dark blue color. The results suggest that simulation program establishes an engineering remedy and is useful to the case to apply.

  • PDF

A simulation program practical use to forecast the improvement effectiveness of the work place noise (소음작업장 개선효과 예측을 위한 시뮬레이션 프로그램 활용)

  • Yang Hong Seok;Lee Kang bot;Youn Eui Sik;Kang Kyung Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.2
    • /
    • pp.57-64
    • /
    • 2005
  • Prescribed according to the occupational safety and health low noise measurement method was changed to personal sampling in the method to measure an area noise. Such method had the limit which did not evaluated characteristic of sound of occurrence and the place of origin. This study was peformed to establish an engineering remedy of the work-place noise. The subject was a vibration control process of the place of business in Pusan. A simulation program applied for an engineering improvement of the work-place noise. The results were as follows: 1. An noise occurrence level of the work-place before improvement was $88^{\sim}97dB(A)$, We applied an improvement method to be established and were expected to $80^{\sim}l19dB(A)$, 2. The level of the noise-distribution to appear in the place of origin of the work-place before improvement was $90^{\sim}93dB(A)$ but, We executed the simulation after applied an engineering remedy and predicted $80^{\sim}85dB(A)$. A result of the simulation blue part was changed mostly into the dark blue color. The results suggest that simulation program establishes an engineering remedy and is useful to the case to apply.

Automated Generation of a Construction Schedule Based on the Work Method Template for 4D Simulation (4D 시뮬레이션을 위한 공법 템플릿 기반의 건설공정 자동 생성)

  • Song, Sung-Yol;Yang, Jeong-Sam;Myung, Tae-Sik
    • IE interfaces
    • /
    • v.25 no.2
    • /
    • pp.216-228
    • /
    • 2012
  • BIM-based 4D simulation makes people easily understand complex construction process using 3D graphics model and helps them review and identify the construction schedule in each phase of the construction process. Moreover, 4D simulation can be used as reference data to determine the validity of the process in the design phase and will be utilized as a measure for checking the construction process. Therefore 4D simulation of construction improves efficiency of project management. However, current commercial applications available for 4D simulation do not provide sufficient functions for connection of 3D models and process information. In this paper, we propose an automated generation method through the definition of the process based on a work method template and developed the template based schedule generation system (TSGS).

Analysis of Welding Positions for Reduction of Musculoskeletal Disorders Based on Simulation Technique (시뮬레이션 기법에 기초한 근골격계 질환 감소를 위한 용접자세 분석)

  • Park, Ju-Yong;Kim, Dong-Joon;Chang, Seong-Rok;Song, Chang-Sub
    • Journal of Welding and Joining
    • /
    • v.25 no.4
    • /
    • pp.79-85
    • /
    • 2007
  • The industrial disaster caused by a work-related disease like a Musculoskeletal Disorders(MSDs) becomes a big social problem and increases rapidly. This leads to the degradation of the labor desire and the productivity. Welding work belongs to the work with a high intensity. This paper aims to analyze the welding work in the various positions from a view-point of the burden of the human musculoskeletal system and to propose the desired position with lower burden. For this purpose the real welding work was observed in the shipyard and analyzed using the RULA method, a powerful ergonomics tool. The 3-dimensional simulation model fur this work was also developed. In this model, ergonomics human model and welding work environment were built. This model was verified through the comparison to the real work. This paper showed that the improvement of welding position by changing the location of a stool and using some auxiliary tool can reduce the work intensity remarkably and lead to the decrease of MSDs.