• Title/Summary/Keyword: Work management system

Search Result 3,501, Processing Time 0.032 seconds

Study on Developing Program for Efficient Landscape Woody Plants Management - Mainly Focused on the Development of a Tree Inventory System - (조경수목의 효율적 관리를 위한 프로그램 개발에 관한 연구 - 관리대장(Tree Inventory) 개발을 중심으로 -)

  • 조영환;곽행구
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.24 no.4
    • /
    • pp.1-22
    • /
    • 1997
  • This paper was focused on the efficient management of landscape woody plants, and concerned itself with their important role in the urban environment. Based on the philosophy that there is nothing that can be done without an inventory, the purpose of this study was to develop an inventory system and iris proper application to a site for establishing a management plan Two different approaches were used, The first was to make a newly structured inventory system through collecting, analyzing, and evaluating various types of inventories used in Korea, the U. S. A., and Japan. The second approach was to apply a newly designed inventory system to the case study area. using GIS 'as a tool of spacial analysis and statistics for making decisions. The results could be summarized as follows; 1. In Korea, most of the Landscape Woozy Plants Inventories had datas which represented possession of trees, and only the work which they had done according to their traditional ways, There was no data related to the conditions, management needs, and site conditions of individual trees, This is essential information for organizing an inventory system . 2. There needs to be data which is balanced, containing tree characteristics and site characteristics. Through such information the management needs could be adjusted properly. The inventory list described in this paper was determined by botanical identity, placement condition, condition of tree, and types of work for maintaining as well as improving the condition of each tree One of the most important things was to determine the location data of each tree so as to compare data with other trees. The data gained from the field survey still had some problems because of lack of scientific method for supporting objective views, and because of actual situations, especially in the field of evaluating site conditions and management needs. All data should be revised to fit a computer data management system , if possible 3. The GIS(Geographic Information System) application showed good performance in handling inventory data for decision making. All the data used for the GIS application was divided into location and non-spatial data. Using the location data, it was easy to find the exact location of each tree on the monitor and on the maps generated by the computer even in the actual managed trite, along with various attribute data. Therefore it could be said that the entire management plan should start from data of individual trees with their exact locations, for making concrete management goals through actual budget planning.

  • PDF

A Study on A Computerized Input Data Model for A General -Purpose Project Management (교량공사를 중심으로 한 범용 프로젝트 관리를 위한 전산 입력 자료 모형 구축)

  • Park, Hongtae
    • Journal of the Society of Disaster Information
    • /
    • v.12 no.1
    • /
    • pp.19-31
    • /
    • 2016
  • The purpose of this study was to establish the initial computerized management database which can be applied to a universal project management computer system for managing universal project management and operation. Database construction model presented in this paper suggested the model of organization, activity and operation of bridge construction(two abutment-three-span) based on the organization information classification system of the facility classification, functional component classification, work classification, resource classification. Database model established in this study are considered to be able to take advantage of a very systematic and scientific management for future universal project management and operations.

A Study on the Construction of Pollution Management System with Influx the Urban Stream (도심하천 유입 오염원 관리시스템 구축에 관한 연구)

  • Min, Kwan Sik
    • Spatial Information Research
    • /
    • v.22 no.2
    • /
    • pp.45-52
    • /
    • 2014
  • In recent years, The importance of the river pollution management has increased and central and local governments are making constant effort to work out river pollution problems. Accordingly, this paper is to take a closer look at applications of spatial data and river pollution information(aerial photograph, parcel information, pollution source, GPS data et al.). More exactly, the purpose of the present paper is to offer an applications of spatial information for development of the river pollution management system. In order to provide a framework for more detailed consideration of the quantitative analysis of river pollution source and management plan by apply GPS and GIS. For that reason, this paper was to build pollution management system of river by spatial analysis. It is to be hoped that this paper will contribute to establish the management policy for urban stream pollution source preservation.

Development of a Bridge Disaster Management System Using GIS (GIS를 이용한 교량재해관리시스템 개발)

  • Ahn, Ki-Won;Yoo, Hwan-Hee;Choi, Yun-Soo;Shin, Sok-Hyo
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.7 no.2 s.14
    • /
    • pp.69-80
    • /
    • 1999
  • The purpose of this study is to develop a Bridge Disaster Management System for bridge safety control using Geographic Information Systems(GIS). The constructed database includes several graphic layers such as basemap, road, bridge location, etc. and has related text attributes for 32 bridges and its facilities in Chinju City. Using the language of Visual Basic 5.0, personal computer based Bridge Disaster Management System which has several functions for bridge safety analysis was developed. The developed GIS based Bridge Disaster Management System has the functions of fast and efficient data searching, file management, searching and management of bridge characteristics, bridge related map viewing, searching and management of traffic survey, bridge inspection and repair work results, and evaluating the bridge safety grades, etc..

  • PDF

A Study on the Policy Improvement of Quantitative Management Evaluation Index of Municipal Medical Institutes (지방공사의료원 사업운영분야 경영평가 지표의 문제점과 개선방향)

  • 오동일
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.5 no.4
    • /
    • pp.359-366
    • /
    • 2004
  • The purpose of this study is to propose the policy improvements of management evaluation system of municipal medical institutes. Management evaluation system of municipal medical institutes has been carried out every each year. This makes a great improvement in management practices. But in some respects, management evaluation system of municipal medical institutes has some problems in mechanism and measures. To overcome these, appraisal measures should be composed to improve medical efficiency. If we want to reconcile two objects which require both profit and public service, more appropriate measures should be designed. In addition, we should make measures to promote people work hard. For this purpose, we should make sure a more theoretical and practical ground back to evaluate the effectiveness of management consulting.

  • PDF

A Study on Nature Resource Management System for Ecotourism Practices (생태관광 실천을 위한 자원관리시스템에 관한 연구 -일본 이리오모떼섬을 대상으로-)

  • Kim, Hyun;Kaizu, Yurie
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.5 no.6
    • /
    • pp.64-71
    • /
    • 2002
  • This study aimed to provide data for establishment of resource management system of Iriomote Island in Okinawa Japan. Nature resource management system of Iriomote Island can be categorized into eight stages which are equivalent to regional development stages. 1) Networking among local people, tourists, researchers, tour operators and government authorities enhanced collection of resource data. 2) On the early stage, resource data were available only to researchers and government authorities. From the third stage of this system, however, local people were also involved in resource investigation, so they became to well recognize the values of their local resources. 3) On the sixth stage, data on unfamiliar local resources and attractions became to be known to people by real-time data collection and data provision services. The tourist number gradually increased and their visitation patterns were dispersed into different sites and seasons. In addition, some tourists also participated in resource investigation and they were likely to visit the place again. 4) To achieve successful ecotourism development, it is necessary to establish a management system with a feed-back process to identify, evaluate, use and protect the resources.

Application Instance Satisfaction Analysis of Web Environmental ERP System (웹환경 ERP시스템의 적용사례 만족도 분석)

  • Yang, Hae-Sool;Kang, Sang-Won;Kim, Jong-Ryeol
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.11
    • /
    • pp.3144-3154
    • /
    • 2009
  • Recently, people seek to recognize organizationally and cross sectionally the period work of a company such as manufacturing, retail, distribution, accounting, and personnel management in order to maximize company profit. Also, the ERP system, which is used as a management concept for plan management designed to optimize the utilization of management resources in an enterprise like manner, has been introduced for the same purpose. This study has examined the ERP system, which has been currently set up, for the parent company, S. The study has evidentially analyzed the system efficiency and satisfaction level of customers by examining implementation effects after onsite application and by seeking ways of improvement after recognizing the difficulty linked with use discovered after onsite application of the system and rejection by customers by conducting a questionnaire survey.

Development of Construction Schedule Management System based on BIM (BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.3
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

A Study on the Implementation of the Safety Management Plan in the Construction Technology Promotion Act (건설기술진흥법 안전관리계획서의 실행방안에 관한 연구)

  • Shin, Sung-Su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.104-105
    • /
    • 2018
  • The purpose of the safety management plan under the Construction Technology Promotion Act is to improve the quality and safety of construction engineers during construction work. To prevent a collapse accident of a facility after completion by preventing a collapse accident of gravel, an earthwork, a river structure or the like. In order to prevent collapses, the purpose of the project is to study measures to improve the ability of construction technology promotion law to ensure the quality of construction materials at the time of construction work.

  • PDF

Revised PPC Measurement Method considering Interfering Float Weight of Task

  • Jung-Sook Yun;Hyung-il Kim;Jung-Ho Yu;Chang-Duk Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1479-1484
    • /
    • 2009
  • It is commonly recognized to need performance management for successful construction project. PPC measurement of Last Planner System is one of construction project measurement method. PPC measurement is quantitatively assessment to go through construction, and that is not completely to be trusted when compare a project with another or an individual case work with another in same project. According to, purpose of this study is comparison indicator establishment that compare project with another or an individual case work with another it is not use PPC measurement for quantitatively assessment to go through construction. The procedure of this study is derive of the point at issue of existing PPC measurement for a aim PPC measurement in this study expenditure and select weight about that and it is applied to actually construction.

  • PDF