• Title/Summary/Keyword: Work improvement

Search Result 3,703, Processing Time 0.034 seconds

A Study on Measuring Efficiency Improvement of Improvement Project at Black Spot by DEA (DEA를 이용한 교통사고 잦은 곳 개선사업 효율성 측정방안 연구)

  • Kim, Hyung Kyu;Lee, Soo Beom;Eom, Dae Lyoung;Won, Dong Uk;Shin, So Myoung
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.5
    • /
    • pp.141-148
    • /
    • 2017
  • Over the past 30 years, the business effects of the improvement project at black spot have been decreasing since 2010, with a reduction in the amount of government spending, coupled with proposing a uniform improvement plan. In order to promote more efficient improvement projects, it is necessary to evaluate the efficiency of local governments and improve the business methods of local governments with low efficiency. However, more sophisticated efficiency analysis methods are needed. Because in previous studies have been limited to the analysis of effects before and after the project through the simple before-after analysis. For this purpose, this study analyzed the efficiency of improvement project at black spot by local governments in Gyeonggi-do using DEA to compare and analyze efficiency in various fields. As a result, Goyang, Seongnam, Paju, Hanam and Yangju showed high efficiency local governments. For local governmetns with low efficiency, the improvement projets to improve efficiency were divided into civil engineering work, structure work, pavement work, additional work and transportation work, and the appropriate construction ratios of each local government were analyzed and presented.

SUGGESTING IMPROVEMENT METHODS OF FORM WORK FOR COST REDUCTION IN THE MID-RISE APARTMENT HOUSING

  • Jeongseok Lee;Seunghee Kang;Gunhee Cho;Jeongrak Sohn;Jongdae Bang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1608-1614
    • /
    • 2009
  • In recent days, the study of urban regeneration has been conducting with purposeful and sincere intent starting out with the residential environment improvement works. Within the range of urban regeneration, the low-cost housing technology means development of totally-integrated housing technology that may be applied to the regeneration project, especially for the rundown areas where infrastructure facilities in the urban zone have been degraded and obsoleted. In line with this, among many and varied methods in order for realization of the low-cost housing as a part of urban regeneration project, this study should like to propose an improvement methods of the key technologies in relation to the construction works by type of work with which construction costs (directing cost) would be reduced. And, in order to elicit the method for element technology that has been developed and improved in the most optimal manner centering on the selected construction work by the type of work, the researcher conducted comparative review of summary of element technologies related to the construction works concerned, characteristics, and construction method thereof. In particular, the researcher investigated the expenses (construction cost and labor cost), constructions (contractibility and productivity), safety, quality of works, and the technical status in environmental aspects, and the researcher also conducted analyses and evaluations thereof.

  • PDF

Measuring productivity improvement by Machine Guidance through work sampling in earthwork

  • Eom, Julee;Kang, Youngcheol;Lee, Yongsei;Choi, Pyungho
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.409-416
    • /
    • 2020
  • This paper proposes a study measuring productivity improvement by using a type of technology called "Machine Guidance" through work sampling in earthwork. Earthwork is the activity typically on the critical path, indicating that productivity for the activity is critical for managing schedule on time. Thanks to the development of sensing and information system technologies, productivity for earthwork has been improved. While there have been many studies investigating the application of a certain type of technology to earthwork, few studies have measured the productivity improvement and presented how the technology leads to productivity improvement. Based on the thorough literature review, it is hypothesized that Machine Guidance contributes to improving productivity of earthwork by reducing indirect workhours spent for information waiting and inspection. In addition to the literature review, this paper presents a research model to test the hypothesis by using the work sampling technique. By proving and quantifying the productivity improvement from the technology use, this study can help practitioners justify the investment for technology use, which will contribute to the deployment of technology and more effective execution of earthwork.

  • PDF

Improvement of Work Environment Measurement in Construction Industry by Survey (설문조사를 통한 건설업 작업환경측정제도 개선방안에 관한 연구)

  • Woo Je, Lee;Won, Choi;Ki Youn, Kim
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.32 no.4
    • /
    • pp.456-464
    • /
    • 2022
  • Objectives: The Purpose of this study is to improve work environment measurement in construction industry by survey. Especially, this study focused on the defferences between construction staffs(safety manger, health manager) and work environment measurement institution workers. Methods: Survey targets are construction staffs(safety manger, health manager) and work environment measurement institution workers. Respondent was selected by respective councils and conferences. A questionnaire consisting of items on general characteristics and the improvement of work environment measurement in construction industry. Results: Total of 134 people(39 safety managers, 27 health managers, 68 work environment measurement institution workers) responded to survey. Overall, current work environment measurement was deemed unsuitable for construction industry. There was a significant difference between construction staff and work environment institution workers in some question. On the other hand, there was no noticeable significant difference in general characteristics. Conclusions: As a result of survey, current work environment measurement was deemed unsuitable for construction industry in terms of measurement method, measurement timing, and actual site improvement. In addition, there is a statistically significant differences in response between construction staff and work environment measurement institution workers, so it is necessary to reflect both opinions in order to improve work environment measurement in construction industry.

A Study on Work Ability among Aging Workers in Korea

  • Kim, Day Sung;Park, Jae Oh
    • Journal of the Ergonomics Society of Korea
    • /
    • v.33 no.5
    • /
    • pp.423-432
    • /
    • 2014
  • Objective and Background: The objective of this study was to evaluate the association of individual characteristics, work-related factors, lifestyle factors, and health problems with work ability among aging workers in Korea. Method: In this cross-sectional survey, the study population consisted of 1,594 workers who had participated in a voluntary health promotion center and private workplace. Participants completed the work ability index. Results: The mean WAI score was 37.4, while the mean age of the sample was 43.25. In the age group over 50 showed 36.26. The majority of participants rated their work ability as 'good' to 'excellent', one-third moderate and about 7.5% poor. Work ability decreased significantly with age among the men. The younger group had higher scores on the work ability index than the age group over 50, except for mental resources. By work characteristics, work ability was analyzed to be the lowest in the case of work handling heavy stuff. Lastly, as a result of health factors analysis, the good management and retention of current health status can be the measure helpful to the improvement of work ability. Conclusion and Application: According to the results, it can be a basic principle to devise and enforce preventive measures on the factors for which improvement or action is possible, together with workplace-level systematic approach, in order to improve work ability. For such measures to be realized, it is necessary to check trends in change for several years.

Effect of Physical Fitness Improvement Program on Work Intensity of Adults With Down Syndrome (신체능력향상프로그램이 다운증후군 성인의 작업강도에 미치는 영향)

  • Kim, Eun-Joo;Lee, Ki-Eop;Park, Eun-Young
    • The Journal of the Korea Contents Association
    • /
    • v.9 no.2
    • /
    • pp.252-260
    • /
    • 2009
  • The purpose of this study was to examine the effect of physical fitness improvement program on work intensity of persons with Down syndrome. For this, 8 adults with Down syndrome participated in program and were evaluated. The physical fitness improvement program consisted of grasp, lifting, carrying exercise for 12 weeks, 1 day a week for 2 hours per session. Compared with pre-program conditions, participants in program improved significantly in right grasp power, lifting ability but there was not significant improvement in carrying ability. In view of work intensity, work intensity level of two subjects was changed from average to hard in lifting. One subject was changed from very light to average and two subjects was changed from light to average in carrying. This results suggested that physical fitness improvement program was helpful for promotion the intensity of adults with Down syndrome.

A Study on the Standard Time & Loss Time (표준작업시간과 손실시간에 관한 연구 - Radiator 제조공정의 시간연구사례를 중심으로 -)

  • 강경식
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.4 no.5
    • /
    • pp.27-42
    • /
    • 1981
  • The object of this paper is to Study the work measurement which is one of the principal technique in work study for the improvement of Productivity in the foundry industry. Most of domestic mechanical enterprise using the expensive foreign machinerise is inoufficient for the standardization of the operation method and time. Therefore, the improvement of operation and productivity through the introduction of the work measurement is an urgent task. Therefore, this paper is contribute to the improvement of operation and to reduce the loss time through the application of the work measurement based on the case study conducted at W-Foundry Corporation. The summary of this study is follows; 1. The measurement of operation efficiency can be accomplished by the standard time. 2. The detailed causes and counter-proposal of loss time can be established, 3. More than 50% of loss time is attributed to c/p.

  • PDF

Development of Cost Estimate System Based on the Itemized Historical Data for Rural Improvement Projects (농어촌정비사업 공종별 실적공사비 적산시스템개발)

  • 김현영;이정재;김영기;오상원;전효묵
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.40 no.3
    • /
    • pp.35-41
    • /
    • 1998
  • Cost estimate system Will be changed from the prime. cost calculation to the historical cost data because the present system has some problems. In this situation, each owner should prepare his own cost estimate system based on the historical cost data. In this study, the standard work items were classified and the criteria of their work amount computation were established for rural improvement projects. And also the historical cost data were collected in all range of rural improvement projects, and the database system, "HICOMS" (HIstorical COst data Management System) was built. In order to test the applicability of the HICOMS, standard work cost and contractor cost were compared. The results by HICOMS showed high significance and it was concluded that the HICOMS could be applicable for the cost estimate of the rural improvement projects. projects.

  • PDF

The Productivity Improvement for Steel Framing Work Efficiency by Work Sampling and 5-minute Rating Technique

  • Chang, SooWon;Yi, June-Seong;Son, JeongWook
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.40-46
    • /
    • 2015
  • This study presents the results of our analysis and recommendations for process and productivity improvements. The project studied consists of a 5-story research building, with a structure of steel frames supporting concrete slabs. The observations focused on the analysis of the overall erection and framing process. The methods used for the analysis consisted in intensive visits on site, where construction processes were observed in term of resources, activities, durations, materials' handling procedures, and technology used. Back to the office, authors used the information captured to model the different trades' activities, using work sampling and 5-minute rating technique. The work sampling provides insight into the activity, hence allowing for process improvements. The productivity of various trades is strongly dependent on the organization of the work process and work site conditions. Improving the productivity of the entire project or company is not possible until everyone is committed to improvement.

The Improvement Plan of Information Management of Interior Finishing Work at Apartment in Korea (국내 집합 공동주택 내장마감공사 정보관리 개선방안)

  • Kim, Jin-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.3
    • /
    • pp.99-106
    • /
    • 2003
  • The purpose of this study is to suggest the rational plans of Information Management in the interior finishing work. The results of this study are summarized as follows; I) Analytical survey of actual construction progress of interior finishing work 2) Review of computer-based development in construction planning & information management of interior finishing work 3) Structure of interior finishing work Planning and Management Support System And the expectancies of this paper are that it can be used as efficient data for improvement of system to systematize planning and execution of interior finishing work in korea.