Case Study of Precast Concrete Erection Work of the Heavy-Loaded Long Span Structure (초대형 건축물의 PC부재 양중작업 사례연구)

  • Cho, Wonhyun;Na, Youngju;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.58-59
    • /
    • 2016
  • Along with the logistics development, heavy-loaded warehouses and sales facilities tend to be bigger and designed as a PC structures. PC erection work of heavy-loaded structures is influenced by various factors, including the required construction duration, site and surrounding situations, safety, PC member procurement, equipment rental cost, which ultimately impact the construction cost. It requires creative efforts and a lot of time when preparing an erection plan in consideration of these factors, and the plan prepared has a great influence on safety as well as the construction duration and cost. However, many engineers do not have enough experiences on PC erection work of heavy-loaded, long span structures, making it difficult for them to set erection plans and establish simulations. The study's results will provide a knowledge to obtain a solution for engineers to establish PC erection plans of heavy-loaded, long span structures.

  • PDF

Process Optimization Method Based on Emergency Construction Work Scenario (돌관공사 시나리오 기반 공정관리 최적화 방안)

  • Lee, Si-Hyun;Lee, Seung-hak;Woo, Mi-Sun;Son, Jae-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.117-118
    • /
    • 2015
  • These days buildings have more possibilities to occur construction delay as many variables and risks are inherent in them due to the enlargement and complexity. When a project is delayed, it generates extra working expenses and this causes a dispute between the employer and the constructor. Most construction sites conduct emergency construction work to recover the delay of the project duration. When an emergency construction is carried out in the actual construction site, it's necessary to utilize and distribute the proper working groups based on the procedure of successor and predecessor. Many constructions, however, have been going only with more number of work forces and working time. This study suggests a process management optimization plan with an application of emergency construction scenario by using linear programing.

  • PDF

A study on effects of the prevention of rush work of construction sites on human accidents (건설 현장 강행공사 방지가 인적사고에 미치는 영향에 관한 연구)

  • Lee, Sung-Il;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.1
    • /
    • pp.27-37
    • /
    • 2017
  • In the construction sites, rush (speedy construction) work have recently been overused because of budget reductions by reducing the construction duration after the long-term economic recession and construction business stagnation with institutional change including the instruction of the duration shortening bidding system and the introduction of the post-construction sales system by the Korea Research Institute for Human Settlements. Due to this, negligent accidents have frequently occurred by forcing manpower, equipment, finance, and material procurement and pressing ahead with impractical construction wok at night according to the reduction of construction schedules. Therefore, this paper has the necessity of this study to seek for alternatives to prevent negligent accidents by finding factors related to rush work in the reality that the importance for preventing negligent accidents is more emphasized while they have not been reduced in construction sites.

Projection of Activity Duration Utilizing Historical Cost Data (자원투입 비용을 고려한 공정관리 작업기간 산정)

  • Moon, Sung-Woo;Kang, Sang-Rae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.444-447
    • /
    • 2006
  • Construction managers need to pay a close attention to the resource utilization in order to deliver the construction project successfully. Construction scheduling is crucial for resource control in that it provides information when and how much to bring down work force to sites. In scheduling, activity duration is projected based on the productivity of historical data or the intuition of scheduler. This paper studies the opportunity of applying cost-based productivity for estimating activity duration. For cost-based productivity, the cost of resource is used as an input and the work quantities as an output. Out of historical data, regression model has been developed to understand the validity of applying cost-based productivity in projecting activity duration. The result of study will work as a prerequisite for implementing the environment of database-based construction scheduling.

  • PDF

An Analysis of 3D Printing Activities for Vertical Structure of Small Building (소형건축물 수직골조 대상 3D 프린팅 액티비티 분석)

  • Park, Hyeong-Jin;Ju, Gi-Beom;Seo, Myeong-Bae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.308-309
    • /
    • 2018
  • Construction automation is needed to improve construction productivity. 3D printing is a key technology of the 4th industrial revolution, and when applied to the construction field, the ripple effect is very large. In this paper, we propose a 3D printing method that can predict the 3D printing process and estimate the construction duration for each process. Through literature review and expert consultation, eight 3D printing activities for structure work were derived. Construction duration and cost estimation for each activity will be needed in the future research.

  • PDF

A Dynamic Analysis of Poverty Durations in Korea (우리나라 빈곤가구의 빈곤지속기간에 대한 동태적 분석)

  • Kim, Hwanjoon
    • Korean Journal of Social Welfare
    • /
    • v.65 no.3
    • /
    • pp.183-206
    • /
    • 2013
  • Using Korean Labor and Income Panel Study (wave 1~11) database, this study analyzed the poverty duration of the poor as a whole and by households' characteristics. For this purpose, I first estimated poverty exit rates and reentry rates applying discrete-time hazard model to the sample, and then calculated poverty duration combining these two probability rates. The results show that about a half of poor households are transitory (short-term) poor with 1~2 years of poverty duration. A quarter is chronic (long-term) poor lasting for 5 or more years of poverty duration. The remained quarter can be categorized as the recurrent or mid-term poor. The socioeconomic characteristics of households greatly affect poverty duration. Long-term poverty is prevalent among female-head households, elderly households, single households, or households headed by a person with a lower level of education. If households' heads do not work, or work as temporary or daily-employed workers, the poverty duration tends to be longer. The findings suggest that the poor consist of various social classes with different characteristics. Efficient anti-poverty policy should be based on thoroughly identifying the specific characteristics and needs of each class.

  • PDF

Approximate Estimating of Plant Construction Duration Using a Standard Schedule Model (초기 사업단계에서 표준공정모델을 이용한 가스 플랜트 공사의 개략적 공사기간 산정)

  • Moon, Sung-Woo;Park, Sang-Chun;Kwon, Ki-Nam
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.26-33
    • /
    • 2009
  • The required level of detail in scheduling depends on the stages in the construction life-cycle. The objective of this study is to provide a Standardized Schedule Model (SSM) with an aim to facilitate the estimating of construction duration in the planning stage. The SSM modularizes work items; establishes relations between preceding and succeeding activities; and calculates approximate construction duration. The estimated duration of the SSM was compared with the detailed duration from the commercial scheduling tool using actual work activities. The difference showed to be ranged between -3.1% and +15%, which demonstrates that the SSM can be feasibly applied to the approximate estimation of construction duration.

Risk Factors of Work-related Low Back Pain in Manufacturing Workers (제조업 근로자들의 작업과 연관된 요통의 위험요인에 관한 연구)

  • Kim, D.H.;Shin, H.R.;Chun, J.H.;Kim, Y.W.;Kim, J.H.;Lee, C.U.
    • Journal of Preventive Medicine and Public Health
    • /
    • v.26 no.1 s.41
    • /
    • pp.20-36
    • /
    • 1993
  • Work-related low back pain is one of the major factors that cause the loss of working power especially in actively working age, therefore controlling the work-related low back pain is one of the major issues in the field of industrial safety and health. This study was performed for detecting the risk factors and proposing the efficient control program of the work-related low back pain. The subjects were male workers employed at the manufacturing industry in Pusan with longer than 6 months' working duration. The data was collected by self-reported questionnaire and interview from May 1 to October 31,1992. The contents of questionnaire were as follows:. the experience of low back pain within the recent one month, general characteristics(age, marital status, education level, religion, regular exercise), physical characteristics(height, weight), employment status(working duration, daily working hours, rest during work, satis(action fur the job), type of work and working environments(posture, forward bending, lifting and movement, satisfaction for table and chair). The result was analyzed for 608 entire respondents by case-control comparative method. The number of cases was 152 with a history of work-related low back pain, so the relative frequency of self-reported work-related low back pain was 25.0%, and the number of controls was 344 without any history of low back pain. As a result, two characteristics of the employment status(working duration, satisfaction fur the job) and all characteristics of type of work and working environments showed a statistical significance between the case and control groups(p<0.01). The Oddb ratios of these variables for Work-related low back pain were calculated. They were 7.88 for the satisfaction fur chair, 7.86 for lifting and movement,3.31 for satisfaction for table, and 2.22 fur bending forward(p<0.01). And for the multivariate logistic regression analysis confirmed that unsatisfaction for table was independent risk factor for Work-related low back pain. In summary, though this study was based upon the self-reported questionnaire and the subjective complaints, the satisfaction for chair, lifting and movement, satisfaction for table, and bending forward concerned with the type of work and working environments were considered as the main factors causing the work-related low back pain, and the work-related low back pain may be preventable by the ergonomic control of these factors.

  • PDF

OVERALL BENEFIT-DURATION OPTIMIZATION (OBDO) FOR OWNERS IN LARGE-SCALE CONSTRUCTION PROJECTS

  • Seng-Kiong Ting;Heng Pan
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.780-785
    • /
    • 2005
  • This paper aims to consider an overall benefit-duration optimization (OBDO) problem for the sake of maximizing owner's economic benefits, whilst considering influences of schedule compression incurred opportunity income on the profitability of a large-scale construction project. Unlike previous schedule optimization models and techniques that have focused on project duration or cost minimization, with greater weight on contractors' interests, OBDO facilitates owner's economic benefits through overall benefit-duration optimization. In this paper, the objective function of OBDO model is formulated. An example is illustrated to prove the feasibility and practicability of the overall benefit-duration optimization problem. The significance of employing OBDO model and future research work are also described.

  • PDF

Study on weather Probability for Optimum Scheduling of Rice Harvesting Mechanization. (벼 수확기계의 적정소요능력 결정을 위한 작업가능 일수의 확률분포 분석)

  • 이종호;정창주
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.17 no.2
    • /
    • pp.3772-3777
    • /
    • 1975
  • This paper reports on the analysis of the distributions of probable days being good for mechanical rice harvesting and the method of determining the capacity of rice harvesting machinery for the given harvesting duration. In the analysis of the probability distribution of days being good for rice harvesting, the daily rainfalls above which mechanical field work may be impracticable were specified and their frequency of occurances was analyzed by using the weather records during past twenty-one years measured at five different locations. The conclusions being drawn from the analysis are as follows: 1. The distributions of probable workable days in different region and harvesting duration are very distinct and are different to set a uniform trend (refer to Fig. 1-4). 2. The occurance of probable days being good for mechanical field work under 66% confidence level are quite variable by region and by ten-day period. The analysis indicates that the probable workable days may range from 7.5 to 8.5 days of 10-day span within optimum harvesting duration (refer to Table 1). 3. Based on the probability distributions analyzed, the optimun capacities of harvesting machinery required for different harvesting areas and harvesting start-date were estimated as a function of operating duration (refer to Fig. 5 and Table 2)

  • PDF