The Journal of the Korea institute of electronic communication sciences
/
v.6
no.1
/
pp.129-134
/
2011
The construction method in electrical room with hydro power generation is well informed in drawings and according to this method, to master the actual working conditions. It's necessary to consult location of KEPCO liability threshold with the KEPCO side, therefore make a decision to install the underground cable in hydro power station in each state, including outdoor pipes and manholes. Undulating rigid polyethylene conduit (125C) and CNCV-W extra high cable are laid and installed, to make a closely analysis to the construction by reviewing its process. In this work, the key part of the KEPCO power system for House of Commons is actually based on liability threshold, even including outdoors pipeline construction, high voltage underground electrical wiring and switchgear installation. It directly reveals the contents of the proposed construction methods about Housing Corporation and the High Voltage Switchgear Installation Inlet.
The major causes of electrical fire are classified to short circuit fault, overload fault, electric leakage and electric contact failure. The occurrence factor of the fire is electric arc or spark accompanied with electrical faults. Residual Current Protective Device(RCD) of high sensitivity type used at low voltage wiring cuts off earth leakage and overload, but the RCD can't cut off electric arc or spark to be a major factor of electrical fire. As the RCDs which are applied low voltage distribution panel are prescribed to rated breaking time about 30[ms](KS C 4613), the RCDs can't perceive to the periodic electric arc or spark of more short wavelength level. To be improved on such problem, this paper is proposed to a auxiliary control apparatus for RCD trip on electric arc or spark due to electrical fire. Some experimental results of the proposed apparatus is confirmed to the validity of the analytical results.
Recently, the spark and the overheat due to in the failure of pressure contacts on connecting points and the momentary short circuit have been the major causes of electrical fire because these may cause the deposition and the graphite of insulating materials in electrical wiring system. Also, because in these cases the current is a surge one, the losses and faults of a communication, a home appliances, a computer and a measuring instrument may occur. Especially, in such cases, we are very difficult to detect the failure of pressure contacts on connecting points and the momentary short circuit. In this paper, we have developed an auxiliary control device, the electrical fire prevention control device(EFPCD), of an earth leakage breaker(ELB). And we can pre-vent the electrical fire caused by the spark and the overheat occurring in the failure of pressure contacts in connecting points and the momentary short circuit with the EFPCD.
The Journal of Korea Assosiation for Disability and Oral Health
/
v.7
no.1
/
pp.38-43
/
2011
Treatment of the mandibular fracture consists of reduction and fixation. Primary wire & Arch bar are perhaps the ideal method for intermaxillary fixation. But, daily feeding, swallowing, speech, and in some instances, respiration is difficult to maintain during the period of intermaxillary fixation, owing to muscle weakness, emotional disorder and poor oral hygiene in a position of the long-term bed disabled patient with multiple injuries. Therefore, Intermaxillary fixation is not applied in the disabled bed patient, the alternative methods must be obtained. In the case of the mandibular fracture, because of the absence of weight bearing, osseous union may eventually occur even without immobilization if the patient is maintained without wound infection on a controlled soft diet. For the purpose of the prevention of the wound infection, the establishment of an drainage on the oral lacerated wound is necessary for the removal of the hematoma & seroma in the fracture site. This is the report of a case that was managed conservatively without the intermaxillary fixation in the long-term disabled bed patient with a mandibular compound fracture.
Ko, Jae-Woo;Lim, Jong-Log;Kim, David K.;Cha, Hae-Lim;Kim, Si-Han;Lee, Chang-Koo;Ahn, Hyung-Keun
Journal of the Korean Institute of Electrical and Electronic Material Engineers
/
v.29
no.5
/
pp.303-306
/
2016
Floating PV system is installed on the water such as artificial lake, reservoir, river for the purposes of zero energy town and/or large scale of PV station. There are electrical gains from cooling effect by water and reflection of water surface. Particularly, floating PV power station with high efficiency solar cell modules receives a lot of attention recently. Floating PV system is installed on the water, which means grounding method to the frame of solar cell and electrical box such as connector band and distribution panelboard should be applied in different way from grounding method of PV system on land. The grounding resistance should be 10[${\Omega}$] in case the voltage is over 400[V] in accordance with Korean Standard. The applicable parameters are the resistivity of water in various circumstances, depth of water, and length of electrode in order to meet 10[${\Omega}$] of grounding resistance. We calculated appropriate length of the electrode on the basis of theoretical equation of grounding resistance and analyzed the relation between each parameters through MATLAB simulation. This paper explains grounding system of floating PV power station and presents considerations on grounding design according to the resistivity of water.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.19
no.1
/
pp.101-108
/
2005
When a heavy rain occurs, many electrical shock victims are produced every year because lamp poles are under water. In order to prevent electrical shock accidents at a street lamp, the investigation was carried out at real field conditions. The investigation was performed about the circuit configuration of a panel board, a wiring method, a grounding conductor, a lamp pole and so on. The related regulation was analyzed and the problems were presented. Also, the domestic and foreign things were compared and analyzed by the investigation of the field conditions, and the related standard was already revised. Through investigating the field conditions and analyzing the related regulation, it is intended to present the real data to establish more effective preventive measures against electrical shock accidents at a street lamp to be installed on the road. In the future, the analytical data can be applied to stabilize other electrical facilities on the road as well as a street lamp, and to reduce the electrical disasters.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.18
no.3
/
pp.142-148
/
2004
Recently, with the growth of software for electromagnetic-thermal analysis, it has been studied that the precise analysis and investigation for cause of the electrical fire using computer simulation is on the basis of theroy for electromagnetic-thermal analysis. But it is very lacking for the precise analysis and investigation of cause for the electrical fire. In this paper, we have simulated the temperature distribution of wire to current and the force between the two conductors according to the current and the distance of the vinyl flat-type electrical wire(600 V, VFF, $2C{\times}$1.25mm^2) using the finite element method(Flux2D) in a overcurrent. And we will present the cause analysis method of electrical fire by experiment for distance between the two conductors according to current and time using large current supply device(Model: EHT_EFAD, Korea) in a overcurrent.
Proceedings of the Korean Society for Bioinformatics Conference
/
2000.11a
/
pp.56-58
/
2000
Post-genomics may be defined in different ways depending on how one views the challenges after the genome. A popular view is to follow the concept of the central dogma in molecular biology, namely from genome to transcriptome to proteome. Projects are going on to analyze gene expression profiles both at the mRNA and protein levels and to catalog protein 3D structure families, which will no doubt help the understanding of information in the genome. However complete, such catalogs of genes, RNAs, and proteins only tell us about the building blocks of life. They do not tell us much about the wiring (interaction) of building blocks, which is essential for uncovering systemic functional behaviors of the cell or the organism. Thus, an alternative view of post-genomics is to go up from the molecular level to the cellular level, and to understand, what I call, the "interactome"or a complete picture of molecular interactions in the cell. KEGG (http://www.genome.ad.jp/kegg/) is our attempt to computerize current knowledge on various cellular processes as a collection of "generalized"protein-protein interaction networks, to develop new graph-based algorithms for predicting such networks from the genome information, and to actually reconstruct the interactomes for all the completely sequenced genomes and some partial genomes. During the reconstruction process, it becomes readily apparent that certain pathways and molecular complexes are present or absent in each organism, indicating modular structures of the interactome. In addition, the reconstruction uncovers missing components in an otherwise complete pathway or complex, which may result from misannotation of the genome or misrepresentation of the KEGG pathway. When combined with additional experimental data on protein-protein interactions, such as by yeast two-hybrid systems, the reconstruction possibly uncovers unknown partners for a particular pathway or complex. Thus, the reconstruction is tightly coupled with the annotation of individual genes, which is maintained in the GENES database in KEGG. We are also trying to expand our literature surrey to include in the GENES database most up-to-date information about gene functions.
Cu-free multi-component sol, of which final oxide composition becomes $Bi_{1.9}Pb{0.35}SrCaO,\;Bi_{1.8}Pb_{0.2}SrCaO\;and\;Bi_{1.5}SrCaO$, respectively, was prepared through sol-gel route and coated on a bare Cu substrate. Starting materials were metal-alkoxides as follows.; [$Bi(OC_{2}H_{5})_{3}\;Pb(O^{1}C_{3}H_{7})_{2},\;Sr(O^{i}C_{3}H_{7})_{2},\;Ca(OC_{2}H_{5})_{2}$] as a reagent grade. Transparent light yellowish sol was obtained in the case of $Bi_{1.9}Pb_{0.35}SrCaO\;and\;Bi_{1.8}Pb_{0.2}SrCaO$ composition and $Bi_{1.5}SrCaO$ composition's sol was light greenish. Each sol was repeatedly dip-coated on Cu substrate four times and pre-heated at $400^{\circ}C$ and finally heat-treated in the range of $740{\sim}900^{\circ}C$. In the results, crystalline phases confirmed by XRD were (2201) orthorhombic and monoclinic phases. However, only $Bi_{1.9}Pb_{0.35}SrCaO_{x}$ composition showed pseudo-superconductive behavior after heat-treatment at $900^{\circ}C$ for 12 seconds and then onset temperature was 77 K, even though it did not exhibit zero resistance below Tc.
The connectorless power supply system on that multi-contact causes confidence when the wiring reconstructed in the rear. As you see above, contact points between sets and indoor space cause inferior function of audio frequency so it needs to be eliminated. This paper explains the structure of connectorless power supply to supply the system with power crossing the air gap in the part of inductively in the connectorless power supply of both magnetic and electrical model. To get maximum output of electrical load, compensating capacitor compensates to show inter-inductance, lequeage-inductance reducing the track-inductance and access the conditions for resonance. At that time it accesses the maximum electric power. The small change of the value of compensating capacitor causes the changes of maximum electric power. Here the power electronics technology is used not only in the industrial machinery but also in the home appliances so the switching power supply is used to actualize the miniaturization, lightweight, and high efficiency. Generally the condenser input methods are widely used in the rectification circuit of switching power supply, but condenser input method generate great quantity of high frequency components because with this method the current flows in the power input filtering condenser only around value of peak of ac input voltage. To solve these problems, installation of power factor improve circuit on the front of filtering capacitence was considered. Several methods were suggested regarding, but the active filter method which makes smalliging and highly power factor possible are the produce main stream. IC for power factor improvement can be utilized by CMOS process proposing low power consumption. When the high power factor is considered seriously in the power factor improvement circuit, active filter method is selected. In the active filter method, the boost converter is used. Regarding this ·the boost converter is needed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.