풍동과 예인 수조를 이용한 터빈 성능 비교 시험 (A Comparative Performance Test for Turbine in Wind Tunnel and Towing Tank)

  • 강정민;이영호;이규찬
    • 신재생에너지
    • /
    • 제7권4호
    • /
    • pp.42-49
    • /
    • 2011
  • The objective of this paper is to suggest a new method of a wind turbine performance test. The performance test of a wind turbine is generally carried out in a wind tunnel. The test needs not only a high-accuracy measuring system but also durable structure to withstand high speed turbine rotation and wind flow. Therefore, we tried turbine performance test using a towing tank to improve stability and reliability. Because a turbine rotates more slowly and generates more torque in the water than in the wind tunnel under similarity conditions. In this study, we developed turbine performance test systems and verified the turbine test method using a towing tank through comparing results of the wind tunnel and the towing tank test.

Validation of a 750 kW semi-submersible floating offshore wind turbine numerical model with model test data, part I: Model-I

  • Pham, Thanh Dam;Shin, Hyunkyoung
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제11권2호
    • /
    • pp.980-992
    • /
    • 2019
  • This paper describes a model test and numerical simulation of a 750-kW-semi-submersible platform wind turbine under several wind and wave conditions for validation of the numerical simulation model. The semi-submersible platform was designed to support the 750-kW-wind turbine class and operate at a water depth of 50 m. The model tests were performed to estimate the performance characteristics of the wind turbine system in the wide tank of the University of Ulsan. Motions and loads of the wind turbine system under the wind and wave conditions were measured and analyzed. The NREL-FAST code was used to simulate the wind turbine system, and the results were compared with those of the test model. The results demonstrate that the numerical simulation captures noticeably the fully coupled floating wind turbine dynamic responses. Also, the model shows a good stability and small responses during waves, wind, and operation of the 750-kW-floating offshore wind turbine.

미국과 유럽의 풍력터빈 풍동실험 (Wind tunnel test of wind turbine in United States and Europe)

  • 장병희
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2005년도 춘계학술대회
    • /
    • pp.42-46
    • /
    • 2005
  • In spite of fast growing of prediction codes, there is still not negligible uncertainty in their results. This uncertainty affects on the turbine structural design and power production prediction. With the growing size of wind turbine, reducing this uncertainty is becoming one of critical issues for high performance and efficient wind turbine design. In this respect, there are international efforts to evaluate and tune prediction codes of wind turbine. As the reference data for this purpose, field test data is not appropriate because of its uncontrollable wind characteristics and its inherent uncertainty. Wind tunnel can provide controllable wind. For this reason, NREL has done the full scale test of the 10m turbine at NASA-Ames. With this reference data, a blind comparison has been done with participation of 18 organizations with 19 modeling tools. The results were not favorable. In Europe, a similar project is going on. Nine organizations from five countries are participating in the MEXICO project to do full scale wind tunnel tests and calculation with prediction codes. In this study. these two projects were reviewed in respect of wind tunnel test and its contribution. As a conclusion, it is suggested that scale model wind tunnel tests can be a complementary tool to calculation codes which were evaluated worse than expected.

  • PDF

대관령 풍력실증단지 및 실증연구 소개 (Introduction to Daegwallyeong Wind Turbine Test Site and Field Test Study)

  • 유능수;남윤수;이정완
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2005년도 춘계학술대회
    • /
    • pp.5-8
    • /
    • 2005
  • This paper aims to introduce the Daegwallyeong wind turbine test site which is the first official wind turbine test site in Korea. The current status of test site, the characteristics, the projects performed and future plan of this test site are described. The results of wind condition measurements and monitoring system established by the Kangwon National University are presented. The importance of field test is also commented.

  • PDF

증속기 현장시험 국내 적용 사례 및 절차 분석 (Domestic Application and Procedure Analysis of Gearbox Field Test)

  • 이광세;강민상;김석우;이진재
    • 신재생에너지
    • /
    • 제16권4호
    • /
    • pp.23-32
    • /
    • 2020
  • The wind turbine gearbox has the longest downtime among other major turbine components such as blades, generators, and main bearings. Therefore, gearbox manufacturers conduct rig tests to evaluate conformity in terms of design and function. Rig tests, however, have limited similarity compared with atmospheric wind turbine operating conditions. Rig test conditions are thoroughly controlled and maintained by testers and the component certificates of gearboxes issued through the test cannot fulfill wind farm operator's requirements. Hence, certification bodies such as DNV-GL and UL require a mandatory gearbox field test report for type certification. The Korea Energy Agency (KEA) also introduced gearbox field test as a part of the KS type certificate in 2016, although it is optional . In this paper, gearbox field test procedures and requirements are introduced, and the first domestic application case of the test is reported. The field test was conducted with a 1.5 MW wind turbine gearbox located in Jeju as the test object.

Development of Flapping Type Wind Turbine System for 5 kW Class Hybrid Power Generation System

  • Lee, Haseung;Kong, Changduk;Park, Hyunbum
    • International Journal of Aeronautical and Space Sciences
    • /
    • 제17권2호
    • /
    • pp.167-174
    • /
    • 2016
  • Even though the differential drag type machines of the vertical wind turbines are a bit less efficient than the lift type machines such as Darrieus type machines, they have an advantage of low starting torque. The flapping blade type wind turbine is a specific type of the differential drag machines, and it has no need for orientation as well as quite low starting torque. This work is to develop an innovative 5kW class flapping type vertical wind turbine system which will be applicable to a hybrid power generation system driven by the diesel engine and the wind turbine. The parametric study was carried out to decide an optimum aerodynamic configuration of the wind turbine blade. In order to evaluate the designed blade, the subscale wind tunnel test and the performance test were carried out, and their test results were compared with the analysis results.

100 kW급 풍력발전기의 하중 측정 (Load Measurements of 100 kW Wind Turbine)

  • 배재성;김성완;경남호
    • 한국태양에너지학회 논문집
    • /
    • 제24권4호
    • /
    • pp.27-33
    • /
    • 2004
  • Mechanical load measurements on blade and tower of Vestas 100 kW wind turbine has been reformed in Wollyong test site, Jeju island. The experimental procedure for the measurement of wind turbine loads, such as edgewise(lead-lag) bending moment, flapwise bending moment, and tower base bending moment, has been established. The test facilities consisting of strain-gauges, telemetry and T-Mon system are installed in the wind turbine. Strain gauges are on-site calibrated against load cell prior to monitoring the wind turbine loads. Using the test setup, the loads on the components are being measured and analysed for various external conditions of the wind turbine. A set of results for near rated wind speed has been presented in this paper.

3MW 풍력발전시스템 개발품의 육상풍력실증단지 조성 타당성 평가를 위한 풍황 및 지형평가 연구 (Wind Analysis and Site Assessment for Test Site of 3MW Wind Power System)

  • 우상우;이기학;이상일;박종포
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2011년도 추계학술대회 초록집
    • /
    • pp.35.2-35.2
    • /
    • 2011
  • A wind turbine power performance test is very important to wind turbine manufacturers because a wind farm developer or planner must want to define power performance characteristics and reliability of new wind turbines. Based on the IEC 61400-12-1, A wind turbine test site has to be nicely installed at flat terrain for testing. We are developing the wind power system which is IEC wind class IIa model with rated power of 3MW. KEPCO's Gochang power testing center was considered as candidates to build the test site without site calibration. This paper aims to verify the validity of the test site by using implement site assessment result that was based on IEC 61400-12-1.

  • PDF

전산유체역학을 이용한 풍력터빈 축소효과 수치해석 (Numerical Analysis of Wind Turbine Scale Effect by Using Computational Fluid Dynamics)

  • 박영민;장병희
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2006년도 춘계학술대회
    • /
    • pp.269-272
    • /
    • 2006
  • Numerical analysis of wind turbine scale effect was performed by using computational fluid dynamics. For the numerical analysis of wind turbine. Three dimensional Navier-Stokes solver with various turbulence models was tested and realizable k-e turbulence model was selected for the simulation of wind turbines. To validate the present method, performance of NREL (National Renewable Energy Laboratory) Phase VI wind turbine model was analyzed and compared with experiment and blind test data. Using the present method, numerical simulations for various size of wind tunnel model were carried out and characteristics were observed in detail. The power loss due to the interference between wind turbine and nacelle was also computed for relatively larger nacelle installation in wind tunnel test. The present results showed good correlations with experimental data and reasonable trends of scale effect of wind turbine.

  • PDF

풍력발전기의 성능 모니터링 및 하중분석 (Performance Monitoring and Load Analysis of Wind Turbine)

  • 배재성;김성완;윤정은;경남호
    • 유체기계공업학회:학술대회논문집
    • /
    • 유체기계공업학회 2004년도 유체기계 연구개발 발표회 논문집
    • /
    • pp.385-389
    • /
    • 2004
  • Test facilities for the wind turbine performance monitoring and mechanical load measurements are installed in Vestas 100 kW wind turbine in Wollyong test site, Jeju island. The monitoring system consists of Garrad-Hassan T-MON system, telemetry system for blade load measurement, various sensors such as anemometer, wind vane, strain gauge, power meter, and etc. The experimental procedure for the measurement of wind turbine loads, such as edgewise(lead-lag) bending moment, flapwise bending moment, and tower base bending moment, has been established. Strain gauges are on-site calibrated against load cell prior to monitoring the wind turbine loads. Using the established monitoring system, the wind turbine is remotely monitored. From the measured load data, the load analysis has been performed to obtain the load power spectral density and the fatigue load spectra of the wind turbine.

  • PDF