• Title/Summary/Keyword: Web project management

Search Result 262, Processing Time 0.029 seconds

A Case Study on EAI Implementation for Enterprise Process Integration: Focusing on EAI Project in Deakyo Co (기업 프로세스 통합을 위한 EAI 구축사례: 대교(주)의 EAI 프로젝트를 중심으로)

  • Yoon, Cheol-Ho;Choi, Hea-Seong
    • Journal of Information Technology Services
    • /
    • v.5 no.3
    • /
    • pp.109-119
    • /
    • 2006
  • The company cannot optimize its computing environment just with individual solutions such as ERP(enterprise resource planning), SCM(supply chain management), CRM(customer relationship management), and KM(knowledge management). EAI(enterprise application integration) has emerged as an alternative that can optimize computing environment of the company through integrating such solutions and systems of distributed computing and mainframe environment. This paper reports the case study of Deakyo Co. in successfully implementing EAI. It describes project goal, project organization, project plan, the implemented EAI configuration and its features, the EAI effectiveness to the firm, and the critical success factors of the EAI project. This case study is thought to be useful as a practical guideline in carrying out EAI project of the company and to provide significant basis for constructing the theoretical framework of EAI project methodology.

A Development of a Web Based Supporting System for Writing Construction Project Specification (Web기반 공사시방서 작성 시스템 개발 방안)

  • Kim Kyoon-Tai;Kim Tae-Song;Koo Jai-Dong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.501-506
    • /
    • 2001
  • The Korean government established a domestic specification system, and regulated that owner should produced construction project specifications, instead of special provisions, in design phase, January 1998. But in Korea the ability of construction engineers for construction project specification are insufficient. So the government had built up a database of standard specifications and developed a supporting system for writing construction project specification(SPECMAKE) in 1999. However, it is a PC base stand-alone system, so it is not convenient to update the database. In order to overcome these limitations, the purpose of this paper builds up a database of construction criteria and develops a automatic writing system for construction project specification on web base. The database contains standard specifications, design and construction guidelines related with construction business. And this paper describes the frameworks, the components, and the functions of the specifications writing system for the construction projects.

  • PDF

Web-based Daily Report for Data Repository of Standard Cost Data for Modernized Korean Housing (Hanok)

  • Kim, SuJi;Jung, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.595-596
    • /
    • 2015
  • Growing demand for traditional Korean housing, modernized Korean traditional housing (Hanok) was developed as a way of providing Hanok for the public. However, the standard cost data for Hanok has limitations, as it was developed based on single mock-up project actually constructed and verified by another mock-up Hanok. In order to meet these research objectives, daily report composition which is easy-to-use for on-site workers and managers and also easy-to-accumulate standard cost data was developed first. Secondly, access to the system was made easy through a web server. Finally, an automated calculation formula was inserted to allow the last inputted data to be automatically included for adjustment of standard costs. This system was designed from an industry perspective so that any unspecified and nonprofessional users can easily use. For the users, it has an advantage that on-site workers are provided with a daily report system through web server and also they are able to complete such reports through simple input and output without any additional forms.

  • PDF

Stochastic Project Scheduling Simulation System (SPSS III)

  • Lee Dong-Eun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.73-79
    • /
    • 2005
  • This paper, introduces a Stochastic Project Scheduling Simulation system (SPSS III) developed by the author to predict a project completion probability in a certain time. The system integrates deterministic CPM, probabilistic PERT, and stochastic Discrete Event Simulation (DES) scheduling methods into one system. It implements automated statistical analysis methods for computing the minimum number of simulation runs, the significance of the difference between independent simulations, and the confidence interval for the mean project duration as well as sensitivity analysis method in What-if analyzer component. The SPSS 111 gives the several benefits to researchers in that it (1) complements PERT and Monte Carlo simulation by using stochastic activity durations via a web based JAVA simulation over the Internet, (2) provides a way to model a project network having different probability distribution functions, (3) implements statistical analyses method which enable to produce a reliable prediction of the probability of completing a project in a specified time, and (4) allows researchers to compare the outcome of CPM, PERT and DES under different variability or skewness in the activity duration data.

Assessment of ASP-PMIS Quality in Korea

  • Lee, Seul-Ki;Yu, Jung-Ho
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.3
    • /
    • pp.9-17
    • /
    • 2011
  • Web-based PMIS (Project Management Information System) has played significant role in construction management processes in Korea. As the use of web-based PMIS increases, regular quality assessment to identify user's requirements is necessary. However, there have been rare research efforts for quality assessment of web-based PMIS. This study aims to assess the quality of web-based PMIS, especially ASP-PMIS (Application Service Provider based PMIS) that is widely used in Korean construction industry. The assessment factors of ASP-PMIS quality were adopted from previous research and empirically confirmed using exploratory factor analysis. ISA (Importance-Satisfaction Analysis), which is a variation of original IPA (Importance-Performance Analysis), were selected for the assessment and analysis method in this research. A total of 253 completed questionnaires, composed of 23 assessment items, were collected from the ASP-PMIS users in Korea (construction managers and constructors), and they were used to analyse the quality of the systems. Some possible contributions of this research are: it introduces a simple and easy-to-use tool for assessing the quality of ASP-PMIS with a set of quality assessment factors that are selected from previous researches and empirically tested; it provides the quality assessment results of ASP-PMIS in Korea so that ASP-PMIS providers in Korea can understand the users' opinion on their systems; it also identified that the urgent factors that require immediate attention to improvement. However, further researches are to be required on the following areas: enhancing the quality assessment factors in terms of their relation to the success of ASP-PMIS and to the users' performance; assessing and analyzing the quality of individual ASP-PMIS; establishing continuous improvement systems institutionally and instrumentally.

Development of Construction Project Performance Management System(PPMS) Considering Project Characteristics (건설 프로젝트 리스크 관리 효율성 향상을 위한 성과측정시스템(PPMS) 개발)

  • Cha, Hee-Sung;Kim, Ki-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.82-90
    • /
    • 2013
  • In the construction industry, there are so many qualitative factors affecting the performance of a project. So it is crucial to measure the factors in an effective way in order to analyze the interrelationship among the various factors. To improve the performance level of a project, it is also important to identify the most appropriate management practices which are inter-linked with the subject project. The purpose of this study is to develop a project performance management system (PPMS) to quantitatively analyze the variety of project performance data and identify the best management practice to increase the potential level of a particular performance area. Using a comparative statistical method, this study developed a quantification method and web-based computerized system to enhance the usage of the system. The system, however, is still under the validation stage because of the shortage of data set. In the future, when more and more completed project data are stored in the system, the system would play a crucial role in predicting the performance level and matching the best management practice for a subject project. In addition, the system can also be modified as a tool for a business- or industry-level system by incorporating the existing enterprise resource programs.

BIM Utilization Plan for Schedule Risk Management (공정리스크 관리를 위한 BIM 적용 방안)

  • Lee, Gye-Hyun;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.143-144
    • /
    • 2012
  • A number of construction projects tied to the concerns and decision-making is also very complicated. In addition, more than any other industry, is inherent in many risk factors. In the course of the construction project on risk factors that exist in the early stages of project risk factors to predict in advance and prepare a project by shortening the construction period and project cost as you can to maximize performance. In this study, I proposed risk management processes and how they are used in web-based schedule risk in the process of change management system, and between 3D CAD, 4D CAD taking into account the linkages, risk management strategy process in the BIM environment.

  • PDF

A STUDY ON DEVELOPING DECISION SUPPORT MODULES OF iPMIS(INTELLIGENT PROGRAM MANAGEMEN INFORMATION SYSTEM) FROM ONTOLOGICAL PERSPECTIVE

  • Jae-Bok Lim;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.717-724
    • /
    • 2009
  • Most recent programs in and out of the country are related to urban renewal projects. Contemporary project management information systems have been developed was to manage single or multiple projects focusing on their construction phase, and those have limitations to apply to large-scale complicated mega projects. So, this study explain the core concept of decision support modules for iPMIS (Intelligent Program Management Information System) and its major functions to support project owner and participants by introducing ontology in the web environment. This study confined the scope of research to the planning phase of urban environment improvement projects. Ontological logic structure and relation about planning works is essential parts and three functions to implement decision support module are developed.

  • PDF

WEB FRONT-END COMPUTING RELATIONAL DATABASE SYSTEM FOR ITEM-LEVEL PRELIMINARY HIGHWAY COST ESTIMATES

  • Jui-Sheng Chou ;James T. O'Connor ;Khali R. Persad ;Wai Kiong Chong
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.509-514
    • /
    • 2005
  • In recent years, use of the web technologies and on-line process has immensely swapped single-user platform practice. This study attempted to develop preliminary cost estimating program by means of Web technologies based on statistical modeling results. A prototype Web-based Preliminary Item-Level Cost Estimating System (WBPILCES) using open source software was developed as an on-line estimating tool in this research. The primary objective is to study the possible flexibility of implementing a centralized information system that will be maintained by the Texas Department of Transportation (TxDOT) IT division. The full-scale deployment of proposed information architecture is expected to seamlessly integrate with legacy database system currently used by TxDOT so as to streamline data storage, cost growth tracking and estimates documentation.

  • PDF

Web Based Environmental Management System using Predictive Spatial Information Models (예측적 공간정보 모형을 이용한 Web 기반의 환경관리시스템의 개발 및 적용)

  • Kim, Joon Hyun;Han, Young Han
    • Journal of Environmental Impact Assessment
    • /
    • v.8 no.4
    • /
    • pp.47-57
    • /
    • 1999
  • This study is aimed at the development of comprehensive environmental management system, which can be operated on the basis of world wide web, as a topic of G7 project. Even though there should be lots of works remaining to achieve this goal, preliminary products can be summarized as follows : 1) integrated environmental information management system, 2) web based control engine, 3) surface water environment management system, 4) subsurface water environment management system, 5) sewer and waterworks management system. The core methodology of the engine is the generalized multidimensional finite element matrices to depict the terms in the analysis of various partial differential equations. Spatial information management system (ArcView) and Visual Basic were extensively employed to construct GUI oriented web based engine. The developed systems were composed of very intense computer codes due to the necessity of combinatory management of environmental problems. The web based engine could be served as a decision tool for the integrated management of environmental projects in Korea.

  • PDF