• Title/Summary/Keyword: Web project management

Search Result 261, Processing Time 0.034 seconds

Web 2.0 Cluster based Process and Performance Management System Modeling (Web 2.0 Cluster 기반의 공정 및 성과관리 시스템 모델 구축)

  • AHn, Jae-Gyu;Ong, Ho-Kyoung;Kim, Dae-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.892-898
    • /
    • 2007
  • This study aims to implement an efficient process management system for small and medium sized(local) construction companies and a performance management system for the Korean construction industry. The process management system by Lean Construction is Web 2.0 platform-based and creates clusters with numerous general contractors and sub-contractors, which will enable mutually organic process management. Plus, this system will enable them to compare project performance management by analyzing it during or after a project by collecting and accumulating lots of data occurring in pursuit of a project. These performance management cases will be of help in process planning during similar upcoming projects. This study is expected to somewhat reduce the burden of implementing a complicated process management protocol and system that Korean small and medium sized (local) construction companies experience with their web-based process management, and is supposed to realize accurate performance management with highly reliable data which are significantly accumulated within the database.

  • PDF

IMPLEMENTING WEB-BASED COLLABORATION PLATFORMS IN CONSTRUCTION: EVALUATING THE LANE COVE TUNNEL (LCT) EXPERIENCE

  • Rodney A. Stewart ;Debbie Smit ;Martin Betts
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.544-549
    • /
    • 2005
  • Web-based collaboration platforms present construction project teams with an opportunity to improve the efficiency of document exchange, better control project communications and enhance team collaboration. However, many construction professionals are still not convinced that these platforms, in their current form, are fit-for-purpose and yield sufficient efficiencies for the construction procurement process. In an attempt to improve the current ICT diffusion process, this paper evaluates the implementation of a web-based collaboration tool on the Lane Cove Tunnel (LCT) project in Sydney, Australia. Moreover, the paper provides strategies for achieving more effective implementation of web-based collaboration platforms in the construction sector.

  • PDF

Web-based Three-step Project Management Model and Its Software Development

  • Hwang Heung-Suk;Cho Gyu-Sung
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.373-378
    • /
    • 2006
  • Recently the technical advances and complexities have generated much of the difficulties in managing the project resources, for both scheduling and costing to accomplish the project in the most efficient manner. The project manager is frequently required to render judgments concerning the schedule and resource adjustments. This research develops an analytical model for a schedule-cost and risk analysis based on visual PERT/CPM. We used a three-step approach: 1) in the first step, a deterministic PERT/CPM model for the critical path and estimating the project time schedule and related resource planning and we developed a heuristic model for crash and stretch out analysis based upon a time-cost trade-off associated with the crash and stretch out of the project. 2) In second step, we developed web-based risk evaluation model for project analysis. Major technologies used for this step are AHP (analytic hierarchy process, fuzzy-AHP, multi-attribute analysis, stochastic network simulation, and web based decision support system. Also we have developed computer programs and have shown the results of sample runs for an R&D project risk analysis. 3) We developed an optimization model for project resource allocation. We used AHP weighted values and optimization methods. Computer implementation for this model is provided based on GUI-Type objective-oriented programming for the users and provided displays of all the inputs and outputs in the form of GUI-Type. The results of this research will provide the project managers with efficient management tools.

  • PDF

Development of AUTS-PDM by Web Version for Advanced EMU System (차세대전동차시스템 Web 버전 AUTS-PDM 구축)

  • Kim, Gil-Dong;Lee, Han-Min;Oh, Seh-Chan;Lee, Chang-Mu
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.1061-1062
    • /
    • 2008
  • The project of advanced urban transit system (AUTS)development is developing the advanced vehicle and the core technologies for the cost down by system change, the transport safety and the environmental friendliness and the improvement of passenger service. The product data management(PDM) system is installed for management of each project. Various data and informations producted from each project are made for database. We developed the product data management system for advanced urban transit system. In past, it was AUTS-PDM of C/S version. Now, we develop AUTS-PDM of Web version.

  • PDF

Current Practices of the Customer-Oriented Web Site Development Methodologies and their Evaluation (고객지향적 웹 사이트 개발 방법론의 현황과 평가)

  • 이선로;김기영
    • Journal of Information Technology Applications and Management
    • /
    • v.11 no.1
    • /
    • pp.15-37
    • /
    • 2004
  • This study attempts to investigate the industrial practices of the web site development methodologies and their impacts on the web site development project performance. Most of Korean web site development firms currently use customized component-based development(CBD) methodologies that have been internally developed. The methodologies generally being accepted by web site developers, however, did not emerge yet. In addition, this study shows that indiscreet applications of various methodologies and techniques might cause negative impacts on the project performance since the web site development projects are also exposed to most of the risk factors identified in the traditional systems development.

  • PDF

Web Based Comprehensive Environmental Control Engine (Web 기반의 종합적 환경제어시스템의 개발 및 적용)

  • Kim, Joon Hyun
    • Journal of Industrial Technology
    • /
    • v.19
    • /
    • pp.293-300
    • /
    • 1999
  • This paper is aimed at the development of comprehensive environmental management system, which can be operated on the basis of world wide web. This study has been initiated as a topic of G7 project in 1988, and will be accomplished in 2001. Even thought there should be lots of works remaining to achieve this goal, preliminary products can be summarized as follows : 1) integrated environments information management system, 2) web based control engine, 3) surface water environment management system, 4) subsurface water environment management system, 5) sewer and waterworks management system. The core methodology of the engine is the generalized multidimensional finite element matrices to depict the terms in the analysis of various partial differential equations. Spatial information management system (ArcView) and Visual Basic were extensively employed to construct GUI oriented web based engine. Developed systems were consist with very intense computer codes due to the necessity of combinatory management of environmental problems. The web based engine could be served as a decision tool for the integrated management of environmental projects in Korea.

  • PDF

The Impact of Characteristics of Communication Media and Instruction Behavior on Collaborative Interaction and Project Performance (커뮤니케이션매체 특성과 교수행위 특성이 협력적 상호작용과 프로젝트 성과에 미치는 영향)

  • Ko, Yun-Jung;Chung, Kyung-Soo;Ko, Il-Sang
    • Asia pacific journal of information systems
    • /
    • v.18 no.4
    • /
    • pp.83-103
    • /
    • 2008
  • In the new web based learning environment which has recently emerged, a variety of new learning objectives and teaching methods suited to this learning environment have been adopted. Recently, web based project-based learning methods have received a great deal of attention from those wishing to improve learning performance. The objective of this study is to identify the impact of characteristics of communication media and instruction behavior on collaborative interaction and project performance through web based group projects. The characteristics of communication media were divided into richness, flexibility, and ease of use, and the characteristics of instruction behavior were divided into support and expression, which are independent variables. Collaborative interaction as a mediate variable, was divided into information sharing and negotiation. Project performance was the dependent variable. To verify the proposed research model empirically, an experiment was conducted in which learners participated in on-line and off-line courses with group projects. The group project was conducted virtual product development(VPD), and designed a web-site about the VPD. At the end of the project, a survey was conducted. Of the 270 students, 239 responded. The students were assigned to groups of 3 or 4 members, and represented different genders and levels of computer competence. The reliability, validity, and correlation of research variables were analyzed using SPSS 14.0, and the measurement model and the structural goodness-of-fit of the research model were verified through SEM analysis using Lisrel 8.54. We found important results as follows; First, richness and ease of use has positive impacts on each of sharing information and negotiation. This suggests that richness and ease of use are useful in sharing information which is related to the task and agreeing in opinions among group members. However, flexibility has not positive impacts on sharing information and negotiation. This implies that there is no great difference in performance of PC and information literacy of user. Second, support and expression of instructor have positive impacts on sharing information and negotiation. This indicates that instructors play an important role in encouraging learners to participate in the project and communicating with them, sharing information related to the project, making a resonable decision and finally leading them to improve a project performance. Third, collaborative interaction has a positive impact on project performance. This result shows that if the ability to share information and negotiate among students was improved then a project performance would be improved as well. Recently, in the state of revitalized web based learning, it is opportune that web-based group project is practically conducted, and the impact of characteristics of communication media and characteristics of instruction behavior on sharing information, negotiating among group members and improving a project performance is verified. On the basis of these results, we propose that forms of learning, such as web based project, could be one of solution which is to enforce interaction among learners, and ultimately improve learning performance. Moreover web-based group project is able to make up for a weakness which makes it difficult to make interpersonal relations or friendship among learners in computer mediated communication or web based learning.

A Case Study of the Construction Management Applied to I-Project (I-프로젝트의 건설사업 관리(Construction Management) 적용사례)

  • Kim Jong-Hoon;Seo Bong-Whan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.102-112
    • /
    • 2001
  • It has been passed $5\~6$ years since Construction Management introduced in Korea, but a few government projects have been presented as CM instances. We performed CM service, on behalf of the foreign Client, in the Insa-dong construction, I-Project. Even though there were many limits in cost, time and other aspects, we have attained satisfaction of the Client and successful businesses of all the construction parties as adopting the advanced management methods. Many advanced construction methods have been applied for the purpose of time reduce, cost save and quality assurance as well as to the webbased project management has been imported to overcome the limits of time and place. They have actualized to increase the productivity of the project by managing the floor to floor cycle and quality systemically pursuant to ISO 9002, and by adopting Real-name construction and completion system (or individual activity. While carrying out this project, it is possible to establish mutual reliability and understanding enable to resolve the issues occurring in the early stage due to insufficient understanding of CM, lack of communications and team work, indistinct work scope through continuos training and conferences. Additionally, we became to share business targets among the parties and promoted the project in confidence. We wish that the success of I- project to be rated as a standard model of CM in Korea.

  • PDF

Development of a Project Schedule Simulation System by a Synchronization Methodology of Active nD Object and Real Image of Construction Site

  • Kim, Hyeon Seung;Shin, Jong Myeong;Park, Sang Mi;Kang, Leen Seok
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.344-348
    • /
    • 2015
  • The image data of the web camera is used to identify the construction status of the site in a remote office and it can be used for safety management. This study develops a construction schedule simulation system based on the active nD object linked with real image data of web camera from the construction site. The progress control method by 4D object uses a method that the progress of each activity is represented with different colors by progress status. Since this method is still based on a virtual reality object, it is less realistic description for practical engineers. Therefore, in order to take advantage of BIM more realistic, the real image of actual construction status and 4D object of planned schedule in a data date should be compared in a screen simultaneously. Those methodologies and developed system are verified in a case project where a web camera is installed for the verification of the system.

  • PDF

A study on the project management for the Light-Rail Transit System Development using a web-based Knowledge Information system (웹기반 지식정보시스템을 이용한 경량전철기술개발사업관리)

  • 민재홍;목재균;한석윤;천승훈
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.29-34
    • /
    • 2001
  • In this paper, we'll change a data generated by the project for a database and make the better interface of all laboratory and a participating enterprise, constructing a knowledge-based management system to fit a characteristics within a country. Also, we'll manage the light-rail transit system development efficiently and systematically, constructing the web-based knowledge information system.

  • PDF