• 제목/요약/키워드: Wave-wind hybrid power generation system

검색결과 12건 처리시간 0.032초

파력-해상풍력 복합발전시스템의 IEC61850기반 통합 SCADA시스템 개발 (Development of Unified SCADA System Based on IEC61850 in Wave-Offshore Wind Hybrid Power Generation System)

  • 이재규;이상엽;김태형;함경선
    • 전기학회논문지
    • /
    • 제65권5호
    • /
    • pp.811-818
    • /
    • 2016
  • This paper suggests a structure of power control system in floating wave-offshore wind hybrid power generation system. We have developed an unified SCADA(Supervisory Control and Data Acquisition) system which can be used to monitor and control PCS(Power Conversion System) based on IEC61850. The SCADA system is essential to perform the algorithm like proportional distribution and data acquisition, monitoring, active power, reactive power control in hybrid power generation system. IEC61850 is an international standard for electrical substation automation systems. It was made to compensate the limitations of the legacy industrial protocols such as Modbus. In order to test the proposed SCADA system and algorithm, we have developed the wind-wave simulator based Modbus. We have designed a protocol conversion device based on real-time Linux for the communication between Modbus and IEC61850. In this study, SCADA system consists of four 3MW class wind turbines and twenty-four 100kW class wave force generator.

파력-해상풍력 복합발전을 위한 대형 반잠수식 플랫폼의 개념설계 (Conceptual Design of Large Semi-submersible Platform for Wave-Offshore Wind Hybrid Power Generation)

  • 김경환;이강수;손정민;박세완;최종수;홍기용
    • 한국해양환경ㆍ에너지학회지
    • /
    • 제18권3호
    • /
    • pp.223-232
    • /
    • 2015
  • 본 연구에서는 부유식 파력-해상풍력 연계형 발전시스템의 기반구조물 개념설계에 대한 내용을 다루고 있다. 세계적으로 해양 신재생에너지에 대한 관심이 커져가고 있다. 파력과 해상풍력은 다른 해양에너지원과 더불어 주요 관심이 되는 에너지원으로서 발전적지가 대체로 일치한다는 특징이 있다. 따라서 파력과 해상풍력을 복합하여 발전하는 시스템은 경제적으로 많은 이점이 있고 이미 여러 나라에서 파력-해상풍력 복합발전 시스템을 개발하고 있다. 이에 따라 우리나라에서도 10MW급의 파력-해상풍력 복합발전 시스템을 개발하기 위한 연구가 수행되었다. 본 연구에서는 다수 풍력발전기와 파력발전기의 배치를 고려하여 반잠수식 구조물이 설계되었다. 또한 설치해역의 환경을 고려하여 계류시스템과 파워케이블이 설계되었다. 본 논문에서는 이러한 복합발전 플랫폼의 개념설계 결과를 제시하고 다양한 발전시스템의 배치를 고려한 설계상의 어려움을 토의하고 설계 방법을 제시한다.

부유식 파력-해상풍력 복합 발전시스템의 등가설계파 기법 적용에 관한 연구 (A Study on Equivalent Design Wave Approach for a Wave-Offshore Wind Hybrid Power Generation System)

  • 손정민;신승호;홍기용
    • 한국해양환경ㆍ에너지학회지
    • /
    • 제18권3호
    • /
    • pp.135-142
    • /
    • 2015
  • 부유식 해양구조물은 설계수명 동안 조우할 수 있는 가장 극심한 환경하중을 고려하여 설계되어야 한다. 본 연구의 해석 대상인 부유식 파력-해상풍력 복합 발전시스템에 가장 큰 영향을 미치는 환경하중은 파랑하중이다. 파랑하중의 주요 매개변수는 파장, 파고, 파향이며, 이들의 조합에 따라 구조물의 거동특성에 미치는 영향은 판이하다. 이에 따라, 대상 해역이 가지는 파랑의 특성과 구조물이 가지는 응답 특성을 기반으로 극한 응답을 주는 파랑인자를 탐색하는 과정이 필요하다. 즉, 환경조건 범위에서 발생할 수 있는 모든 파랑조건을 탐색하여 최대 응답을 발생시키는 등가설계파를 추출해야 한다. 이는 특정 하중의 최대 설계 응답과 동일한 응답 수준을 주는 규칙파를 탐색하는 일련의 과정을 통해 계산 가능하다. 본 연구에서는 부유식 파력-해상풍력 복합 발전시스템에 작용하는 특정 하중 인자에 대해 등가설계파를 산정하였으며, 전체구조해석에 활용하였다.

Research into The Future Development of the Hybrid System for Buoy

  • Lee, Ji-Young;Kim, Jong-Do;Lee, Jong-Ho;Lee, Jin-Yeol;Oh, Jin-Seok
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제31권5호
    • /
    • pp.583-591
    • /
    • 2007
  • This paper reports the performance of a 150W PV-wave hybrid system with battery storage in buoy. This system was originally designed to meet a new hybrid ower system for buoy in Korea. In the case or lighted buoys and lighthouses, a light failure alarm system of wireless radio is attached so that light failures are immediately notified to the office. At lighthouse offshore fixed lights and light buoys where commercial electricity is not available, the power source depends on solar system and batteries. This power system has a various problems. Therefore energy derived from the sunshine, wind and waves has been used as the energy source lot aids to navigation. Recently a hybrid system of combining the solar, wind and the wave generator is a favorable system lot the ocean facilities like lighthouse and buoy. The hybrid system in this paper is intended for variable DC load like light, communication system in the buoy and includes a PV-wane generation system and battery. This is composed a high efficiency charging algorithm, switching converter and controller. This paper includes discussion on system reliability, power quality, and effects of hybrid system in the buoy. Simulation and experimental results show excellent performance.

10MW급 부유식 파력-해상풍력 연계형 발전 시스템의 다수 풍력터빈 배치 설계 및 성능 평가 (Arrangement Design and Performance Evaluation for Multiple Wind Turbines of 10MW Class Floating Wave-Offshore Wind Hybrid Power Generation System)

  • 박세완;김경환;이강수;박연석;오현석;신형기;홍기용
    • 한국해양환경ㆍ에너지학회지
    • /
    • 제18권2호
    • /
    • pp.123-132
    • /
    • 2015
  • 본 연구에서는 10 MW급 부유식 파력-해상풍력 연계형 발전시스템에 설치되는 다수 풍력발전기의 배치 설계를 수행하고, 전산유체역학 해석기법을 통해 다수 풍력발전기의 성능을 평가하였다. 날개요소운동량이론을 기반으로 한 풍력발전 단지 설계용 프로그램 WindPRO를 이용하여, 발전시스템의 적지 환경 풍황조건에 대해 최대에너지를 생산할 수 있는 배치 설계를 도출하였고, ANSYS CFX를 이용하여 다수 풍력발전기간의 후류 간섭영향을 발전기 성능 측면에서 검토하여, 근거리 다수 풍력발전기간의 후류 간섭이 시스템에 미치는 영향을 평가하였다.

복합발전의 공급전력 안정성 극대화를 위한 파력발전 PCS의 BESS 연동방안 연구 (A Study on the ESS Integration Plan with Inner PCS of Wave-Offshore Hybrid Generation System for Maximizing Power Profile Stability)

  • 정승민;김현욱;유연태;장길수
    • 조명전기설비학회논문지
    • /
    • 제28권5호
    • /
    • pp.82-91
    • /
    • 2014
  • The combined generator system by integrating several renewable energy sources can share the electrical infrastructure and therefore have the advantage of constructing not only the transmission system but also the power conversion system. Among the various combined renewable system, the wind power and wave power has a high possibility of future growth due to the economic feasibility in offshore environment. This kind of large-scale combined systems might be follow the determination by the transmission system operator's directions and control the output profile by focusing at PCC. However, both renewable energies are depend on the unpredictable environmental variation; it is needed to do the compensation devices. In this paper, the ESS compensation plan is proposed to do output determination of the combined generator system by paying attention to active power of utility grid with the analysis of the controllable elements of the wind and wave power generator. The improvement of the new application technique of the combined system is confirmed through using the PSCAD/EMTDC. The entire simulation process was designed by adopting the active power control according to the reference signal of TSO.

부유식 복합발전 플랫폼내의 다수 파력발전기 배치를 위한 상호작용 해석 (Interaction Analysis on Deployment of Multiple Wave Energy Converters in a Floating Hybrid Power Generation Platform)

  • 이혜빈;조일형;김경환;홍기용
    • 한국해양환경ㆍ에너지학회지
    • /
    • 제19권3호
    • /
    • pp.185-193
    • /
    • 2016
  • 본 연구에서는 부유식 풍력-파력 복합발전 플랫폼 안에 설치된 다수 파력발전기의 현 배치안을 부체 간의 상호 간섭효과를 고려하여 평가하였다. 다수 부체가 수면 위에 떠 있는 경우, 순수한 입사파와 함께 인접한 부체에 의해 발생하는 산란파와 방사파의 영향으로 인해 다수 부체 간의 상호작용 과정은 매우 복잡하다. 다수 파력발전기 배열에 따른 회절 및 방사 문제의 상호작용 해석을 위하여 고유함수전개법을 적용하였다. 해석해의 타당성을 검증하기 위하여 상용 프로그램인 WAMIT으로부터 계산된 수치계산 결과와 비교하였다. 다수 부체 간의 상호 간섭효과를 나타내는 q-factor를 이용하여 복합발전 플랫폼내의 24기 파력발전기의 현 배치안에 대한 전체 성능을 평가하였다.

태양 전지와 압전 재료를 이용한 하이브리드 발전시스템 개발 (Development of a Hybrid Power Generation System Using Photovoltaic Cells and Piezoelectric Materials)

  • 김영민;;;천원기
    • 한국태양에너지학회 논문집
    • /
    • 제39권1호
    • /
    • pp.51-58
    • /
    • 2019
  • This paper deals with the operation of a hybrid power generation system made with photovoltaic cells and piezoelectric materials. The system can produce power from the wind as well as from the sun subject to their availability. Irrespective of the largeness of their power production, the power developed by both generators (i.e., phtovoltaic cells and piezoelectric cells) were combined and stored before it was applied to a load. Especially, the AC power (current) developed from each piezoelectric generator was converted by a full wave bridge rectifier and then combined prior to its storage in a capacitor. It was observed that the system can produce a maximum output power of 6.49 mW at loading resistance of $100{\Omega}$.

10MW급 부유식 파력-풍력 복합발전 시스템 플랫폼 초기설계를 위한 위상최적화 응용 (Topology Optimization Application for Initial Platform Design of 10 MW Grade Floating Type Wave-wind Hybrid Power Generation System)

  • 송창용;이강수;홍기용
    • 한국해양환경ㆍ에너지학회지
    • /
    • 제19권3호
    • /
    • pp.194-202
    • /
    • 2016
  • 본 연구에서는 10 MW급 부유식 파력-풍력 복합발전 시스템의 플랫폼 초기 개념설계를 위해 유한요소해석 기반 위상 최적화를 검토하였다. 실제 파력-풍력 복합발전 시스템 플랫폼의 위상최적화를 수행하기 전에 단순화된 구조설계 문제를 이용하여 효율적인 위상최적화 이론을 확인하고자 밀도법과 균질화설계법의 두 가지 위상최적화 이론을 적용하였다. 단순화된 설계 문제의 결과로부터 균질화설계법 이론을 파력-풍력 복합발전 시스템의 플랫폼 위상최적화에 적용하였다. 파력-풍력 복합발전 시스템의 플랫폼 개념설계를 위해서 유한요소해석 모델을 생성하고 설치해역의 해양환경하중을 고려하여 구조해석을 수행하였다. 설계파 및 조류와 같은 해양환경하중으로부터 기인하는 플랫폼 상의 압력과 계류삭의 인장력을 산출하기 위하여 동수력학 해석을 수행하였다. 구조해석을 위한 하중조건은 부유체 동수력학 해석으로부터의 결과와 파력-풍력 복합발전 시스템 중량을 고려하였고, 경계조건은 관성제거법을 사용하여 구현하였다. 밀도법 기반 파력-풍력 복합발전 시스템 플랫폼의 위상최적화 결과로부터 개념설계 단계에서 주요 구조부재의 배치방안을 제시하였다. 본 연구결과로부터 위상최적화는 부유식 파력-풍력 복합발전 시스템과 같은 새로운 형식의 해양구조물 개발에 있어서 주요 구조부재 배치의 개념설계에 대해 유용한 설계도구임을 확인하였다.

다수 풍력터빈의 후류영향 최소화 및 연간발전량 극대화를 위한 부유식 파력-해상풍력 플랫폼 최적배치 (Optimal arrangement of multiple wind turbines on an offshore wind-wave floating platform for reducing wake effects and maximizing annual energy production)

  • 김종화;정지현;김범석
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제41권3호
    • /
    • pp.209-215
    • /
    • 2017
  • 대형 부유식 파력-해상풍력 복합발전시스템은 정 사각형(폭 150m) 부유식 플랫폼 컬럼 상부에 4기의 3MW 풍력터빈이 설치된다. 전방 풍력터빈으로부터 발생되는 후류는 터빈배치에 따라 후방 풍력터빈의 출력성능과 하중특성에 불리한 영향을 미치므로 후류간섭에 대한 유동해석을 통해 최적배치설계가 실시되어야 한다. 본 논문에서는 플랫폼 배치조건($0^{\circ}$, $22.5^{\circ}$, $45^{\circ}$) 변화에 따른 개별 풍력터빈의 출력특성 및 연간에너지생산량을 확인하기 위해 풍속변화(8m/s, 11.7m/s, 19m/s 25m/s)에 대한 비정상상태 CFD 해석을 실시하였다. 레일리분포를 적용한 연간에너지생산량 계산결과는 각 배치조건에 따라 다르게 나타났으며, 해석결과에 근거하여 후류손실이 최소화 될 수 있는 최적 배치설계를 제안하였다.