• Title/Summary/Keyword: Water-filling method

Search Result 152, Processing Time 0.029 seconds

A Study on the Development of Rapidly Hardening Grouting Method for the Effective Filling in the Underground Cavity (지하공동의 효율적 충전을 위한 급결 충전 그라우트공법개발에 관한 연구)

  • Kim, Soo-Lo;Kim, Tae-Heok;Shin, Dong-Chun;Kwon, Hyun-Ho
    • Tunnel and Underground Space
    • /
    • v.19 no.6
    • /
    • pp.534-544
    • /
    • 2009
  • The collapse of the underground cavity can cause the abrupt local subsidence of the ground surface. It can be hazardous to the stability of road and building for human activity. Therefore it is necessary to develop reinforcement methods for the filling of the underground cavity. This study was executed to improve the material quality and systems to fill the calcium-aluminate mineral $(C_{12}A_7)$ environmentally, and minimize the loss of filling materials for the steep underground cavity. Filling material which was developed in this study is composed of rapid hardening material and additives. The developed material had rapid hardening and non-separation ability in the water cavity condition, so it made the effective underground dam in the cavity with prevention of material loss when it was poured in the water cavity. Results of heavy metal leaching test for environmental assessment showed that it was environmentally suiTable material for the filling in the mine cavity.

Estimation on Filling Performance of Thixotropic Grout for Increasing Front-Water Depth of Gravity-Type Quay Wall (중력식 안벽 구조물의 증심 시공을 위한 가소성 그라우트의 충진성능 평가)

  • Jang, Kyong-Pil;Ryu, Yong-Sun;Kwon, Seung-Hee;Han, Woon-Woo;Oh, Myong-Hak
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.6
    • /
    • pp.169-177
    • /
    • 2017
  • Recently, as the size of transportation vessels has increased, there is a growing need for securing the front-water depths of existing port facilities. The method of deepening front-water depth is securing the depth of the port facility, and it is reinforced by grouting after excavating the rubble-mound to the required depth. The purpose of this study is to investigate the reinforcing performance and filling performance of thixotropic grout as a grouting material for reinforcing rubble-mound. Compressive strength tests were carried out for two types of thixotropic grout, and 5 specimens with a diameter of 400 mm and a height of 530 mm were manufactured and evaluated for filling performance. The required strength of reinforced rubble-mound required to ensure the safety of the structure is 6 MPa. All the thixotropic grouts used in this study were found to satisfy the required strength over 9 MPa at 7 days of age. As a result of visual observation of filling state of the filling performance test specimens, it was confirmed that the thixotropic grout was well filled up to the desired fillet height.

A Study in the Water Leakage Prevention around the Windows with the Stone Materials in the Apartment House (공동주택 외부 석재마감에 따른 창호주위 누수방지에 관한 연구)

  • Yun, Hong-Jung;Cho, Tae-Jea
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.117-121
    • /
    • 2006
  • This study intends to suggest the effective methods for water leakage prevention around the windows in stone works to up-grade the outdoor public space that has been taken much portion of apartment housing trends. The subjects of the study was selected among the domestic subcontractors of stone works. There are four methods for water leakage prevention around the windows; Firstly, the painting water-proof method after the masonry. Secondly, the urethane water-proof method after galvanizing panels on the gap. Thirdly, the separation method between stone and substructure and the last one is water-proof method that they put some water-proof screen between stone and substructure with the EPDM sheets. According to the analysis of the water-proof effects, constructability and planning, we could approach to conclusion that the most influent items to the water-leakage are the filling material's deformation, the state of oxygenation and deterioration of work skill. Among the water-proof methods in construction the EPDM sheet is most excellent water-proof method to meet the technical conditions. However, we have to apply it to stone works as a water-proof method for the decrease of the leakage defects after standardizing the materials, test and construction skill because there are many work skills according the subcontractors.

  • PDF

Comparative Evaluation of the Pollutant Load Estimation Method in the Water Quality Data Missing Intervals (수질자료 결측구간의 오염부하 추정기법 비교평가)

  • Cho, Beom-Jun;Cho, Hong-Yeon;Kahng, Sung-Hyun
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.19 no.1
    • /
    • pp.45-56
    • /
    • 2007
  • Direct estimation of the pollutant load(PL) should be carried out by the data filling in the missing intervals using an appropriate method because it is impossible in which the flow discharge(water quantity) or water quality(WQ) time-series data set have the missing intervals. In this study, the several methods estimating the water quality in the missing periods are suggested and the WQ and pollutants load change patterns are compared and evaluated based on the reproducible degree of the available data change patterns. The most appropriate method is finally suggested and the contribution factor deciding the influence degree and the PL characteristics of the river estuary is also suggested. Based on the PL estimation results using the several methods, the interpolation method considering the fluctuation of the available WQ data is shown to be most efficient. The PL patterns of the Han river estuary is classified as the discharge-dominated type. The data filling process is inevitable and the WQ estimation using the efficient and effective method should be carried out in order to estimate reasonable PL.

Reinforcement of underground cavities by Hi-FA(High performance and Multi functional Agent) (Hi-FA(유동성 및 점성 개질제)를 이용한 지하공동 보강사례)

  • Lim, Hai-Sik;Park, Yeung-Ho;Paik, Kyu-Ho;Lee, Yong-Jun;Park, Su-Yong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.676-686
    • /
    • 2010
  • Damage Cases of variously type are reported that the ground subsidence is caused by the underground cavities at structure and construction works in lime stone or abandoned zone. A underground cavities by direct for zone having an effect on structure have been filled with cement agents. But this measure is urgently needed in materials and work methods, because ground water pollution at water down fillings and flow out, ground disturb at high participle, damage of farms and fishery. The research confirm application of filling method and filling materials of environmentally friendly and economical by Hi-FA new materials have both liquidity and viscosity from case reinforcement in APT site, Gunsan.

  • PDF

Power Allocation Algorithms for ZF-THP Sum Rate Optimization in Multi-user Multi-antenna Systems (ZF-THP를 이용한 다중 안테나 다중 사용자 시스템에서 전송률 합 최적화를 위한 전력 할당 알고리즘)

  • Lee, Wookbong;Song, Changick;Lee, Sangrim;Lee, Kilbom;Kwak, Jin Sam;Lee, Inkyu
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.37A no.9
    • /
    • pp.753-761
    • /
    • 2012
  • In this paper, we study a power allocation technique for Tomlinson-Harashima precoding (THP) in multi-user multiple input single output (MISO) downlink systems. In contrast to previous approaches, a mutual information based method is exploited for maximizing the sum rate of zero-forcing THP systems. Then, we propose a simple power allocation algorithm which assigns proper power level for modulo operated users. Simulation results show that the proposed scheme outperforms a conventional water-filling method, and it provides similar performance with near optimal method with much reduced complexity.

Long-gap Filling Method for the Coastal Monitoring Data (해양모니터링 자료의 장기결측 보충 기법)

  • Cho, Hong-Yeon;Lee, Gi-Seop;Lee, Uk-Jae
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.33 no.6
    • /
    • pp.333-344
    • /
    • 2021
  • Technique for the long-gap filling that occur frequently in ocean monitoring data is developed. The method estimates the unknown values of the long-gap by the summation of the estimated trend and selected residual components of the given missing intervals. The method was used to impute the data of the long-term missing interval of about 1 month, such as temperature and water temperature of the Ulleungdo ocean buoy data. The imputed data showed differences depending on the monitoring parameters, but it was found that the variation pattern was appropriately reproduced. Although this method causes bias and variance errors due to trend and residual components estimation, it was found that the bias error of statistical measure estimation due to long-term missing is greatly reduced. The mean, and the 90% confidence intervals of the gap-filling model's RMS errors are 0.93 and 0.35~1.95, respectively.

Laboratory experiments on the improvement of rockfill materials with composite grout

  • Wang, Tao;Liu, Sihong;Lu, Yang
    • Geomechanics and Engineering
    • /
    • v.17 no.3
    • /
    • pp.307-316
    • /
    • 2019
  • Dam deformation should be strictly controlled for the construction of 300 m-high rockfill dams, so the rockfill materials need to have low porosity. A method of using composite grout is proposed to reduce the porosity of rockfill materials for the construction of high rockfill dams. The composite grout is a mixture of fly ash, cement and sand with the properties of easy flow and post-hardening. During the process of rolling compaction, the grout admixture sprinkled on the rockfill surface will gradually infiltrate into the inter-granular voids of rockfill by the exciting force of vibratory roller to reduce the porosity of rockfill. A visible flowing test was firstly designed to explore the flow characteristics of composite grout in porous media. Then, the compressibility, shear strength, permeability and suffusion susceptibility properties of composite grout-modified rockfill are studied by a series of laboratory tests. Experimental results show that the flow characteristics of composite grout are closely related to the fly ash content, the water-to-binder ratio, the maximum sand size and the content of composite grout. The filling of composite grout can effectively reduce the porosity of rockfill materials, as well as increase the compression modulus of rockfill materials, especially for loose and gap-graded rockfill materials. Composite grout-modified rockfill tends to have greater shear strength, larger suffusion erosion resistance, and smaller permeability coefficient. The composite grout mainly plays the roles of filling, lubrication and cementation in rockfill materials.

The Stability Evaluation Methods of Embankment on Soft Clay (연약지반 성토의 안정평가 방법)

  • Kang, Yea Mook;Lee, Dal Won;Kim, Ji Hoon;Kim, Tae Woo;Lim, Seong Hun
    • Korean Journal of Agricultural Science
    • /
    • v.25 no.2
    • /
    • pp.260-270
    • /
    • 1998
  • The field tests were performed to suggest the rational method for stability evaluation of soft clay. The behavior of settlement-displacement obtained by field monitoring system was to compare and analyze the results of the observationed method, and to investigate the complex behavior of soft clay with filling height. The results of this study are summarized as follows. 1. The horizontal displacement was suddenly increased when physical properties of soft clay showed maximum values and the part of the turning point. The values of these properties were available to the fundamental data for stability evaluation. The shear deformation appeared that difference of the horizontal displacement was maximum values. 2. Although the stability of embankment by step filling showed the unstable part over the failure standard line, the embankment was confirmed stable. So the evaluation of the stability of embankment is reasonable to use the inclination of curve than failure standard line. 3. The horizontal displacement and relative settlement were increased as same ratio at improvement ground. Estimation of shear deformation using Terzaghi's modified bearing capacity should consider the relations of embankment load and undrained shear strength at nonimprovement ground, and minimum safety factor is recommended to use larger than 1.2. 4. Excess pore water pressure was increased with increasing of filling height and decreased with maintain the filling height. The embankment was unstable when filling height was exceed the evaluation standard line, and the behavior of excess pore water pressure and horizontal displacement could use as a standard of judgement of the filling velocity control because their behavior were agree with each other.

  • PDF

지하수 폐공 원상복구 개선방안

  • Jeong, Ha-Ik;Lim, Jong-Jin;Yoo, Jun;Kim, Sang-Geun;Oh, In-Gyu;Hong, Seung-Seo
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2003.09a
    • /
    • pp.244-248
    • /
    • 2003
  • Unused well and improperly abandoned wells are a significant threat to groundwater quality. If abandoned wells is not properly filled with material, it can directly channel to flow contaminated and surface water into subsurface and groundwater. The abandonment process is over viewed and the method of filling with impermeable and permeable material is presented for the purpose of proper well abandonment work.

  • PDF