• Title/Summary/Keyword: Water wall

Search Result 1,660, Processing Time 0.028 seconds

Design of Remote Field Eddy Current Sensor for Water-Wall Tube Inspection using Simulation (시뮬레이션을 활용한 유동층보일러 수냉벽튜브 검사용 원격장 와전류 탐상 센서 설계)

  • Gil, Doo Song;Kwon, Chan Wool;Cho, Yong-Sang;Kim, Hak-Joon
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.5 no.1
    • /
    • pp.33-38
    • /
    • 2019
  • Thermal power generation accounts for the highest percentage of domestic power generation, among which coal-fired boiler generation accounts for the highest percentage. Coal boilers generate harmful substances and fine dust during coal combustion and have a serious effect on air pollution. So, fluidized-bed boilers have been introduced as eco-friendly coal boilers. It uses a fluid medium which affect the combustion temperature of coal. Because of it fluidized-bed boilers emit less pollutants than original one. Water-wall tubes play an important role in this fluidized bed boiler. Due to the fluid medium, the wall damage is more severe than the existing boiler. However, there is no quantitative maintenance technique in Korea yet. Remote field eddy current testing is a non-destructive evaluation technique that is often used for inspection of inner and outer wall of tube. it can inspect with non-contact and high speed. However, it is an inspection that proceeds from inside the pipe, and the water-wall tube is not able to enter the interior. In this study, we designed and simulated an external remote field eddy current sensor suitable for water-wall tube of a fluidized - bed boiler using simulations. By obtaining a signal similar to the existing remote field eddy current test, the criteria for the external remote field eddy current sensor design can be presented.

Numerical Analysis of Block Type Quay Wall with Piles for Restraining Horizontal Deformation (말뚝 결합 블록식 안벽의 수평변위 억제에 대한 수치해석 연구)

  • Soon-Goo Kwon;Won-Hyo Lee;Tae-Hyung Kim
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.35 no.6
    • /
    • pp.155-163
    • /
    • 2023
  • A two-dimensional numerical analysis was performed on the depth of pile embedment, the magnitude of the residual water level, and the condition of the presence or absence of cap concrete to understand the behavior of the block-type quay wall with piles. The results showed the control effect of the lateral displacement of the quay wall depending on the embedment of the pile. When the piles were not embedded, the lateral displacement of the quay wall increased proportionally as the residual water level difference increased. In contrast, when the piles were embedded into the ground, the control of the lateral displacement of the quay wall was greatly exerted even if the residual water level difference increased. There was little difference in the lateral displacement of the block-type quay wall regardless of the presence or absence of cap concrete. Under the condition where the piles were embedded down to the rubble mound layer, the piles exhibited the rotational behavior seen in the short piles. As the embedment depth of the piles increased, the piles showed the same bending behavior as the intermediate piles. Thus, the piles significantly contribute to the control of lateral displacement in the block-type quay wall with piles.

Case Studies on Ground Improvement by High Pressure Jet Grouting(II) Effect on the Ground Reinforcement and Cut off of Ground Water Behind Temporary Retaining Walls (고압분사주입공법에 의한 지반개량사례연구(II) -흙막이벽 배면지반보강 및 차수효과)

  • Yun, Jung-Man;Hong, Won-Pyo;Jeong, Hyeong-Yong
    • Geotechnical Engineering
    • /
    • v.12 no.5
    • /
    • pp.5-16
    • /
    • 1996
  • When braced excavation with temporary retaining wall installation, is performed in loose sand with high ground water level boiling may be induced and considerable damage on the excavation works and structures in the vicinity can take place. Recently, for the purpose of reinforcement of ground and cut-off of ground water behind the temporary retaining wall, high pressure jet grouting is widely used. The purpose of this paper is to investigate the effects of jet grouting on ground reinforcement and cut -off of the ground water behind temporary retaining walls for braced excavation. A series of both laboratory and field tests has been performed. The test results show that high pressure jet grouting has sufficient effects on reinforcement of stiffness of ground and retaining wall. The permeability of the improved ground was 10-f_ 10-3cm l s smaller than those of the original ground. Therefore, the effect on cut off of ground water behind temporary retaining walls could be improved by high pressure jet grouting method.

  • PDF

Effect and Control of the Sediment in the Combined Sewer on CSOs (합류식 하수관거내 퇴적물이 CSOs에 미치는 영향 및 제어방안)

  • Lim, Bongsu;Kim, Doyoung;Lee, Kuangchun
    • Journal of Korean Society on Water Environment
    • /
    • v.27 no.1
    • /
    • pp.36-43
    • /
    • 2011
  • This study is selected two points of combined sewer that occurred Fish Kill after first flush, that analyzed generation of pollutants and stream runoff generation of combined sewer overflows (CSOs) as fine weather and rainfall. In addition, this study was to analyze the relationship between CSOs and sediments, to propose measures to reduce the sediment relevant with CSOs and rainfall runoff from entering sewage treatment plants and measures for discharged directly into streams when indicate relatively good water quality after overflow. Sediments in combined sewer system was discharged about 50~80% as overflows during rainfall and we can reduce the amount of the CSOs at least 50% or more if the sewer does not exist in the sediments because of the amount of discharge about the amount of intercept has been investigated by 3~5 times. Because of velocity at sediment interval in sewer is very low, sewage velocity of about 3~5 times as much as it can increase the amount of sediment can be reduced if the separation wall is installed. Effective control of BOD overflow load is respectively 77.5%, 75.8% at first point, second point by the separation wall is installed. Drainage area greater than area in this study or many combined sewer overflows region is increased the more effective control of separation wall. Turbidity to measure changes in water quality of overflows can be used as an factor to control the intercept flows because the intercept flows(3Q) after the first flush has lowered removal efficiency and increases the operational load of sewage treatment plants. Sewage water quality after a overflow when the reasonable turbidity was measured at this point flows to excluded intercept flow(1Q) can be discharged to stream.

Effect of separation walls on reduction of suspended solids loading in a combined sewer system (합류식 하수관거내 우오수분리벽 설치에 따른 부유물질 제어효과)

  • Kwon, Chungjin;Lim, Bongsu
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.26 no.6
    • /
    • pp.787-796
    • /
    • 2012
  • The purpose of this study is to investigate CSOs(combined sewer overflows) control in the combined sewer with/without separation wall. There is the high correlation between sewage velocity and suspended solid(SS) loading in the sewer without it. The SS/BOD ratio was about 3 times in the area with it, while it was about 5 times in the area without it. Therefore, the accumulated deposit within the sewer has influenced high SS loading in the sewer without it. This study showed that the separation wall installed acquired an acceptable efficiency in controlling the accumulated deposit in the combined sewer. According to this study, the BOD control effect was about 38 % in the sewer with the separation wall, whereas it showed about 24 % in the sewer without it. In this case, it was anticipated that the high pollutant control effect would be expected if the separation wall was installed in the combined sewer.

Field Application of Up-Up Construction Using Buried Wale Continuous Walt System Method (CWS공법(Buried Wale Continuous Wall System)을 적용한 Up-Up 시공사례)

  • Lee Jeong-Bae;Lim In-Sig;Kim Dong-Hyun;Oh Bo-Hwan;Ha In-Ho;Rhim Hong-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.1-4
    • /
    • 2006
  • A down construction method is frequently used in these days to reduce popular discontent and to assure sufficient working space at early stage in downtown area. There are two main problems in the existing down construction method. One is a confliction between frame works and excavation works, and the other is a cold joint in retaining wall which is unavoidable due to a sequence of concrete placement and induces a water leakage. Therefore, a new method is needed to overcome these problems. The CWS (buried wale Continuous Wall System) method was developed by authors. By replacing RC perimeter beam with embedded steel wale, the steel frame works of substructure can be simplified and the water leakage can be prevented using continuous retaining wall. Consequently, the improved duality and reduction of construction period can be obtained from CWS method.

  • PDF

Studies on the Softening of Strawberry during Circulation and Storage (1) Changes of Cell Wall Components, Protein and Enzymes during Ripening (딸기의 유통.저장시 연화현상에 관한 연구 (1) 세포벽 성분, 단백질 및 효소의 변화)

  • 이광희;김광수;김미현;신승렬;윤경영
    • Journal of the Korean Society of Food Science and Nutrition
    • /
    • v.27 no.1
    • /
    • pp.29-34
    • /
    • 1998
  • This study was investigated to know changes of the cell wall components, cell wall degrading enzyme activities and contents of soluble protein of strawberry during ripening and softening. The contents of water soluble substances were slightly increased during ripening, but the contents of alcohol-insoluble substances were not changed. The contents of pectin were not changed at green mature and turning stage, while decreased after mature stage. The contents of alkali-soluble hemicellulose and cellulose were increased during ripening and softening. The contents of water-soluble and saltsoluble protein were not changed, but the content of cell wall protein was slightly decreased during ripening. The content of total protein was increased at turning stage, it is not changed after turning stage. $\beta$-Galactosidase activity was increased during ripening, and pectinmethylesterase activity was decreased at turning. Phenylalanine ammonia-lyase activity was changed up to mature stage, but decreased at overripening stage. Polygalacturonase and cellulase activities were not detected at all of ripening stages.

  • PDF

Evaluation of The Hygrothermal Performance by Wall Layer Component of Wooden Houses Using WUFI Simulation Program (WUFI 시뮬레이션 프로그램을 이용한 목조주택 벽체 레이어 구성에 따른 hygrothermal 성능 평가)

  • Kang, Yujin;Kim, Sumin
    • Journal of the Korean Wood Science and Technology
    • /
    • v.44 no.1
    • /
    • pp.75-84
    • /
    • 2016
  • Thermal performance of wooden houses used by building materials effectively contributing to building energy saving has been improved. However, the performance was decreased to the condensation and mould growth from exterior wall because the moisture control was difficult to high insulation and airtightness. Therefore, the hygrothermal performance of exterior wall, that selected 5 types of wooden houses, evaluated using the hygrothermal simulation program: heat and moisture behavior, condensation and mould growth risk. Wooden houses were selected Rural houses standard plans '10 and '14, $2^{{\prime}{\prime}}{\times}6^{{\prime}{\prime}}$ type, EIFS and wood-based passive house. And the wall A, B, C, D and E were determined by layer component of each wall. The U-value of exterior wall are 0.171, 0.172, 0.221, 0.150, $0.079W/m^2K$. The OSB absolute water content of the wall A and C was exceeds the reference value of 20%, and it was confirmed that condensation occur at insulation material inner surface through the condensation evaluation in the winter. The wall D and E showed excellent results with condensation and water content evaluation compared to others. However, mould growth risk assessment in all five types of wall had have risk. We were determined that hygrothermal performance difference of exterior wall occur the difference in the layer structure rather than in thermal performance.

Effects of Roughness and Vertical Wall Factors on Wave Overtopping in Rubble Mound Breakwaters in Busan Yacht Harbor

  • Dodaran, Asgar Ahadpour;Park, Sang Kil;Kim, Kook Hyun;Shahmirzadi, Mohammad Ebrahim Meshkati;Park, Hong Bum
    • Journal of Ocean Engineering and Technology
    • /
    • v.29 no.1
    • /
    • pp.62-69
    • /
    • 2015
  • Coastlines are protected by breakwater structures against the erosion of sand or other materials along beaches due to wave action. This research examined the use of physical modeling to determine the effects of the tetrapod size and vertical walls of a rubble mound on the volume of wave overtopping under irregular wave conditions in coastal areas in Busan Yacht Harbor. In this analysis model, the structures were studied using irregular waves and the JONSWAP wave energy spectrum. To understand the effects of the tetrapod size and heights of the vertical wall, the study considered vertical walls of 0, 1.78, 6.83, and 9.33 cm with armor double layered material tetrapods of 8, 12, 16, and 20 tons. An extensive number of experiments covering a relatively large range of variables enabled a comprehensive discussion. First, in the presence of a short vertical wall, the water level played a key role in the overtopping discharge. In such circumstances, the values of the wave overtopping discharge decreased with increasing freeboard size. In the presence of a tall freeboard and middle, the value of the wave overtopping discharge was equally influenced by the vertical wall factor. Moreover, the tetrapod size decreased by an increase in the vertical wall factor, and relationship between them resulted in a short wall height. From an engineering point of view, considering a small water level may allow the choice of a shorter vertical wall, which would ultimately provide a more economical design.

Effect of Cut-off Wall near the Entrance of Spillway Tunnel (비상여수로 입구부의 차수벽 설치 효과 분석)

  • Kim, Gyoo-Bum;Son, Young-Chul;Seo, Kyung-Soo
    • The Journal of Engineering Geology
    • /
    • v.20 no.2
    • /
    • pp.147-153
    • /
    • 2010
  • Cut-off wall with a low permeability can be constructed to prevent groundwater seepage in spillway tunnel areas. Three spillway tunnels are constructed in Im-ha multipurpose dam region and three types of cut-off walls with a variety of directions and scales are designed. As a result of MODFLOW modeling to assess the effect of cut-off wall for three types, groundwater inflows to the tunnels range from 64.26 $m^3/day$ to 65.49 $m^3/day$ and also they through a cut-off wall section from a reservoir do from 44.08 $m^3/day$ to 45.31 $m^3/day$ and it does not show any significant difference among them. Therefore, a construction process and an environmental conservation rather than the effectiveness of cut-off wall need to be considered to select the best cut-off wall in this region.