• 제목/요약/키워드: Water supply plan

검색결과 220건 처리시간 0.03초

Impact assessment for water pressure and turbidity occurrence by changes in water flow rate of large consumer at water distribution networks (상수도관망에서 대수용가의 유량변화에 따른 수압 및 탁도발생 영향평가)

  • Choi, Doo Yong;Kim, Ju-Hwan;Choi, Min-Ah;Kim, Do-Hwan
    • Journal of Korean Society of Water and Wastewater
    • /
    • 제28권3호
    • /
    • pp.277-286
    • /
    • 2014
  • Water discolouration and increased turbidity in the local water service distribution network occurred from hydraulic incidents such as drastic changes of flow and pressure at large consumer. Hydraulic incidents impose extra shear stresses on sediment layers in the network, leading to particle resuspension. Therefore, real time measuring instruments were installed for monitoring the variation of water flow, pressure, turbidity and particulates on a hydrant in front of the inlet point of large apartment complex. In this study, it is attempted to establish a more stable water supply plan and to reduce complaints from customers about water quality in a district metering area. To reduce red or black water, the water flow monitoring and control systems are desperately needed in the point of the larger consumers.

A Study on Standardization Method Establishment of Multi Water-Loop System using Multi Water Resources (다중수원을 활용한 멀티워터 루프시스템의 표준화방안 구축에 관한 연구)

  • Lee, Hyundong;Lee, Joonhyung;Kwak, Pilljae
    • KCID journal
    • /
    • 제21권1호
    • /
    • pp.109-117
    • /
    • 2014
  • Multi water-loop system is the efficient customer centered facilities of water supply by utilizing the multi water resources. Multi water-loop system is divided into various types. The system is classified potable and non-potable type. Mostly, the potable type utilizes surface water and ground water. However, the non-potable type utilize the multi water resources, such as rain water, sea water, reclaimed water, etc. Selective intake is possible when characteristics of region, physiographic condition and purpose of use are considered. For instance, downtown type, new-city type, agriculture type, island type are available. For development and application of these multi water-loop system, standardization is needed. For standardization, several methods are given; design principles, selection and composition method of multi water-loop system structure, BIM/GIS application method, safety inspection method. Consequently, a road map of design standardization method can be established. In this road map, there are three parts for the standardization of multi water-loop system. Three parts are the considerations, base material and ways of standardization. Design standardization become close when this road map followed by someone who plan the multi water-loop system. In this way, loop system's development is more efficient and economic. In hereafter research, each type's characteristic will be analysed and standardization methods can be established.

  • PDF

Optimization of Water Reuse System under Uncertainty (불확실성을 고려한 하수처리수 재이용 관로의 최적화)

  • Chung, Gun-Hui;Kim, Tae-Woong;Lee, Jeong-Ho;Kim, Joong-Hoon
    • Journal of Korea Water Resources Association
    • /
    • 제43권2호
    • /
    • pp.131-138
    • /
    • 2010
  • Due to the increased water demand and severe drought as an effect of the global warming, the effluent from wastewater treatment plants becomes considered as an alternative water source to supply agricultural, industrial, and public (gardening) water demand. The effluent from the wastewater treatment plant is a sustainable water source because of its good quality and stable amount of water discharge. In this study, the water reuse system was developed to minimize total construction cost to cope with the uncertain water demand in future using two-stage stochastic linear programming with binary variables. The pipes in the water reuse network were constructed in two stages of which in the first stage, the water demands of users are assumed to be known, while the water demands in the second stage have uncertainty in the predicted value. However, the water reuse system has to be designed now when the future water demands are not known precisely. Therefore, the construction of a pipe parallel with the existing one was allowed to meet the increased water demands in the second stage. As a result, the trade-off of construction costs between a pipe with large diameter and two pipes having small diameters was evaluated and the optimal solution was found. Three scenarios for the future water demand were selected and a hypothetical water reuse network considering the uncertainties was optimized. The results provide the information about the economies of scale in the water reuse network and the long range water supply plan.

Water Balance Analysis of Pumped-Storage Reservoir during Non-Irrigation Period for Recurrent Irrigation Water Management (순환형 농업용수관리를 위한 농업용 저수지의 비관개기 양수저류 추정)

  • Bang, Na-Kyoung;Nam, Won-Ho;Shin, Ji-Hyeon;Kim, Han-Joong;Kang, Ku;Baek, Seung-Chool;Lee, Kwang-Ya
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • 제62권4호
    • /
    • pp.1-12
    • /
    • 2020
  • The extreme 2017 spring drought affected a large portion of South Korea in the Southern Gyeonggi-do and Chungcheongnam-do districts. This drought event was one of the climatologically driest spring seasons over the 1961-2016 period of record. It was characterized by exceptionally low reservoir water levels, with the average water level being 36% lower over most of western South Korea. In this study, we consider drought response methods to alleviate the shortage of agricultural water in times of drought. It could be to store water from a stream into a reservoir. There is a cyclical method for reusing water supplied from a reservoir into streams through drainage. We intended to present a decision-making plan for water supply based on the calculation of the quantity of water supply and leakage. We compared the rainfall-runoff equation with the TANK model, which is a long-term run-off model. Estimations of reservoir inflow during non-irrigation seasons applied to the Madun, Daesa, and Pungjeon reservoirs. We applied the run-off flow to the last 30 years of rainfall data to estimate reservoir storage. We calculated the available water in the river during the non-irrigation season. The daily average inflow from 2003 to 2018 was calculated from October to April. Simulation results show that an average of 67,000 tons of water is obtained during the non-irrigation season. The report shows that about 53,000 tons of water are available except during the winter season from December to February. The Madun Reservoir began in early October with a 10 percent storage rate. In the starting ratio, a simulated rate of 4 K, 6 K, and 8 K tons is predicted to be 44%, 50%, and 60%. We can estimate the amount of water needed and the timing of water pump operations during the non-irrigation season that focuses on fresh water reservoirs and improve decision making for efficient water supplies.

The Influence on the Runoff Charateristics by the Land Use in Small Watersheds (II) (소유역의 토지이용이 유출특성에 미치는 영향 (II))

  • Choi, Ye-Hwan;Choi, Joong-Dae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 한국수자원학회 2005년도 학술발표회 논문집
    • /
    • pp.178-182
    • /
    • 2005
  • In the forthcoming 21C, the development of cultural lives depends on that the water demand will increase or not. On the opposite site of that circumstance, many factors of the small watersheds will influence directly on how to cover the surface of watersheds with land use, no planning developing watersheds, and the rearrangement of small rivers. Especially as the extraordinary climatic Phenomena, exhaust of $CO_2$ and destruction of 03 layer, water resource and water foresting content of the small watersheds will be decreased by confusing on the malting a plan of water resources. For example, those are Typhoon Rusa in 2002, Typhoon Maemi in 2003 and heavy storms in 2004. This study area has three group and one of them having three small watersheds, total five small watersheds. That is, Sabukmyeon small watersheds in Chuncheon, Three small watersheds in Wonju(Jeoncheon, Jupocheon and Hasunamcheon), and Suipcheon in Yanggu-Gun which are located far away each other three group and different precipitation data. According to the land use such as dry field(or farm), rice field, forest land. building site and others in small watersheds, the amount of runoff will be impacted by monthly precipitation. The comparison between the runoff was getting from Kajiyama Formula and calculated runoff from multi-linear regressed equations by land use Percentage was performed with different precipitation data and different small watersheds. Its correlations which are estimated by coefficient of correlation will be accepted or not, as approached 1.0000 values. As the monthly water resources amount is estimated by multi-linear regressed equations with different precipitation data and different small watersheds having no gauging station, we make a plan in order to demand and supply the water quantity from small river watersheds during return periods.

  • PDF

Velocity-based decision of water quality measurement locations for the identification of water quality problems in water supply systems (상수도시스템 수질사고 인지를 위한 유속기반 수질계측기 위치 결정)

  • Hong, Sungjin;Lee, Chanwook;Park, Jiseung;Yoo, Do Guen
    • Journal of Korea Water Resources Association
    • /
    • 제53권11호
    • /
    • pp.1015-1024
    • /
    • 2020
  • Recently, water pollution accidents have continued to occur in pipelines such as red water Incheon and Seoul. In order to recognize this water quality problem, it is necessary to install a water quality sensor in an appropriate location and measure it in advance to detect or block the water supply to the water faucet of the shelter. However, there are limitations, such as maintenance costs, to installing multiple water meters in all pipelines. Therefore, this study proposed a methodology for determining and prioritizing the installation location of flow-based water quality sensor for the recognition of water quality problems in pipelines. We applied the proposed procedure to the pipe break scenario. The results of the determination of the location of the water quality sensor were presented by applying it to the pipe network that actually operates the emergency pipe in Korea. The result of the decision showed that in the event of abnormal situation caused by the destruction of individual pipes, the flow rate of the pipes around the aqueduct and the tank may change rapidly, resulting in water quality accidents caused by turbidity. In the future, it is expected that the water quality monitoring point selection method, such as establishing an external pipe operation plan for pipe cleaning, will utilize the procedure for determining the location of the water quality sensor according to the velocity.

Development of Methodology for Measuring Water Level in Agricultural Water Reservoir through Deep Learning anlaysis of CCTV Images (딥러닝 기법을 이용한 농업용저수지 CCTV 영상 기반의 수위계측 방법 개발)

  • Joo, Donghyuk;Lee, Sang-Hyun;Choi, Gyu-Hoon;Yoo, Seung-Hwan;Na, Ra;Kim, Hayoung;Oh, Chang-Jo;Yoon, Kwang-Sik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • 제65권1호
    • /
    • pp.15-26
    • /
    • 2023
  • This study aimed to evaluate the performance of water level classification from CCTV images in agricultural facilities such as reservoirs. Recently, the CCTV system, widely used for facility monitor or disaster detection, can automatically detect and identify people and objects from the images by developing new technologies such as a deep learning system. Accordingly, we applied the ResNet-50 deep learning system based on Convolutional Neural Network and analyzed the water level of the agricultural reservoir from CCTV images obtained from TOMS (Total Operation Management System) of the Korea Rural Community Corporation. As a result, the accuracy of water level detection was improved by excluding night and rainfall CCTV images and applying measures. For example, the error rate significantly decreased from 24.39 % to 1.43 % in the Bakseok reservoir. We believe that the utilization of CCTVs should be further improved when calculating the amount of water supply and establishing a supply plan according to the integrated water management policy.

A Study on the Validity and Utility of Urban Plan Facilities for Prevention of Disaster (재해예방을 위한 도시계획시설의 타당성과 효용성에 관한 연구)

  • Choi, Woong;Park, Jeong Yong;Kim, Young Gyun
    • Journal of Korean Society of societal Security
    • /
    • 제4권1호
    • /
    • pp.57-65
    • /
    • 2011
  • Studying the operation of urban control plan and control program of urban plan facilities to present development direction of urban plan in the future by performing multi-variate analysis, the research acquired the following conclusion. It is required to institutionally activate the inhabitants' participation by reflecting spontaneous participation and opinion of inhabitants to adminstration so that the effect of business can be maximized in the stage of establishing urban control plan. Furthermore, the participation of role dividing type is necessary to adjust and connect the interest of expert that has experience in practical business of overall urban plan, inhabitant and self-governing body. It is required to reduce the service supplied by government so as to enhance policy of plan-first and development last for facilities with high importance and utility such as road, park and water supply/sewage, etc as well as to seek control program that expands the participation of private sector for administration for which private service is possible.

  • PDF

Recharge Potential Assessment of Artificial Recharge System for Agricultural Drought Adaptation (농업가뭄대응을 위한 인공함양 시스템의 함양능력 평가)

  • Lee, Jae Young;Kim, Gyoo Bum
    • Journal of Korean Society of Disaster and Security
    • /
    • 제14권1호
    • /
    • pp.61-72
    • /
    • 2021
  • There is an increasing need for water supply plan using sustainable groundwater to resolve water shortage problem caused by drought due to climate change and artificial aquifer recharge has recently emerged as an alternative. This study deals with recharge potential assessment for artificial recharge system and quantitative assessment for securing stable water and efficient agricultural water supply adapt to drought finding optimal operating condition by numerical modeling to reflect recharge scenarios considering climate condition, target water intake, injection rate, and injection duration. In order to assess recharge potential of injection well, numerical simulation was performed to predict groundwater level changes in injection and observation well respect to injection scenarios (Case 1~4) for a given total injection rate (10,000 m3). The results indicate that groundwater levels for each case are maintained for 25~42 days and optimal injection rate is 50 m3/day for Case 3 resulted in groundwater level rise less than 1 m below surface. The results also show that influential area of groundwater level rise due to injection was estimated at 113.5 m and groundwater storage and elapsed time were respectively increased by 6 times and 4 times after installation of low permeable barrier. The proposed assessment method can be contributed to sustainable agricultural water supply and stable water security for drought adaptation.

A study on the device introduction of wastewater reclamation system a treated sewage (하수처리수를 활용한 중수도의 도입방안 연구)

  • Park, Rho-Sam;Park, Sang-Hyun
    • Journal of the Korean Society of Industry Convergence
    • /
    • 제2권2호
    • /
    • pp.23-33
    • /
    • 1999
  • After studying several methods of the application a device of a treated sewage in anticipation of the future shortage of the duty of water, we could have some conclusion as the following : Advanced treatment systems arc essential prerequisites in reusing a treated sewage. And in a short term, the application of reusing a treated sewage should go first to new building areas near the sewage but for the long run, it should cover the whole area of Taegu, it is desirable that the pipe line networks which include dual water systems as well as water supply should be spread throughout the whole city. The city authorities have to make every effort to step up publicity activities on this plan to all the citizens and building owners to steadily carry out this project and encourage private constructors to participate with the help of SOC. And for the long run, it is desirable that the application of reusing a treated sewage should be obligatory.

  • PDF