Study on Guideline of Water Supply System for Forest Fire (산불방지 급수시설 설치 기준 마련에 관한 연구)

  • Kim, Dong-Hyun;Nam, Song-Hee;Keum, Si-Hoon
    • Fire Science and Engineering
    • /
    • v.27 no.3
    • /
    • pp.38-46
    • /
    • 2013
  • Permanent water supply and water sprinkling systems are essential to protect major forests and facilities from forest fire. Back in 2005, Naksan Temple, a valuable cultural asset of Korea, was burned down in a forest fire that took place in Yangyang. This started a series of movements including installing water supply facilities and managing forests near important cultural assets. As for the existing facilities, however, they were installed without any standard guidelines for management and installation according to each constructor's specifications, which were based on the National Fire Safety Code 109. Unfortunately, this is not effective in protecting facilities from forest fires such as they have a small protection area, limited simultaneous sprinkling, and a difficult the movement of fire hose. Against this background, the study examines the condition of water supply facilities currently in use, identifies their deficiencies, and suggests how to improve the criteria for water supply service to effectively prevent forest fire. Specifically, three systems were proposed: Water Sprinkler Tower System for preventing spread of crown fires, and Forest Fire Hydrant System and Portable Water Spray System to be effective for suppressing surface fires. In addition, the standards on the performance and components of water pumps are also suggested.

Research on Managing Underground Facilities for an Intelligent City

  • Kim, Jung-Hoon;Lee, Jae-Yong
    • Spatial Information Research
    • /
    • v.16 no.4
    • /
    • pp.421-439
    • /
    • 2008
  • The objective of this project is to construct the intelligent underground facility management system based on UFSN (Underground Facility Sensor Network). Total project duration is 6-year. And first two years' project has been finished. First two years' project focused on water supply and sewage facilities among 7 underground facilities and investigated the fundamental construction technology for the underground facilities management system. To contribute the development of systematic and scientific management of underground facilities, KRIHS implemented 3 researches for 'Underground facilities management system for an intelligent city' like followings: (1) to investigate an integration plan for current water supply and sewage management systems, (2) to derivate of water supply and sewage monitoring items for the monitoring technology development, and (3) to implement a basic research for sensor installation plans on different types of current and new underground facility systems. This research paper contains the first two years' outcome of researches from KRIHS (Korea Research Institute for Human Settlements).

  • PDF

Evaluation on Water Supply Capability by Linkage Water Balance of Irrigation Facilities (연계 물수지 분석에 의한 농업용수 공급량 평가)

  • Jang, Jung-Seok;Chung, Jin-Ho;Lee, Tae-Ho
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.318-323
    • /
    • 2005
  • This research evaluates agricultural water supply capabilities for water computing demand and supply for water of the whole water system of Ansung stream by carrying out basin water balance classified by irrigation facility of water system of Ansung stream.

  • PDF

Study on Seismic Fragility Analysis of Water Supply Facilities (상수도 시설물의 지진 취약도)

  • Lee, Changsoo;Shin, Deasub;Lee, Hodam
    • Journal of the Society of Disaster Information
    • /
    • v.11 no.1
    • /
    • pp.35-43
    • /
    • 2015
  • In this study, The failure of water supply facilities is categorized into two phases: functional failure and complete collapse. The fragility curve of water supply facilities under PGA has been developed for two loading cases: actual overseas earthquake and Korean artificial earthquake. The seismic fragility of water supply facilities has been analyzed and compared about failure phases and PGA. From the analysis results, the probability of failure of the wrapped steel pipe and ductile case iron pipe under Korean artificial earthquake has been shown as lower than that under actual overseas earthquake in the range from 0.1 to 0.4. The suggested seismic fragility curve by using Korean artificial earthquake can be exploited in a reasonable seismic design reflecting Korean local ground condition.

Development of Pump/Motor Selection Program for Optimized Pump Decision of the Regional Water Supply Facilities (광역상수도용 펌프의 최적결정을 위한 펌프/모터 선정 프로그램 개발)

  • Roh, Hyung-Woon;Kim, Jae-Soo;Park, Gil-Moon;Suh, Sang-Ho;Lee, Young-Ho
    • The KSFM Journal of Fluid Machinery
    • /
    • v.4 no.4 s.13
    • /
    • pp.22-27
    • /
    • 2001
  • The pump/motor selection program for optimized selection of regional water supply facilities was developed based on a flowchart compiled from basic operational data, total head requirement, initial pump/motor specification selection etc. This program was developed in Visual Basic. The program accepts, as in the flowchart, operational requirements of pumps and other system requirements, and calculates specific speed based on flow rate, total head and rotational speed. Then the calculated specific speed is used to select pump types and speed prior to determining likelihood of cavitation occurring at the calculated NPSH. Power requirement is then calculated for safe operation of pump to assist final pump selection. Test results of the program match very closely to the design values of Paldang intake pump station(3rd stage) proving that the program can be used as an effective and practical aid for designing new regional water supply systems.

  • PDF

Development of Pump/Motor Selection Program for Optimized Pump Decision of the Regional Water Supply Facilities (광역상수도용 펌프의 최적결정을 위한 펌프/모터 선정 프로그램 개발)

  • Roh, Hyung-Woon;Kim, Jae-Soo;Park, Gil-Moon;Suh, Sang-Ho;Lee, Young-Ho
    • 유체기계공업학회:학술대회논문집
    • /
    • 2001.11a
    • /
    • pp.171-176
    • /
    • 2001
  • The Pump/Motor Selection Program for optimized selection of regional water supply facilities was developed based on a flowchart compiled from basic operational data, total head requirement, initial pump/motor specification selection etc.. This program was developed in Visual Basic. The program accepts, as in the flowchart, operational requirements of pumps and other system requirements and calculates specific speed based on flow rate, total head and na Then the calculated specific speed is used to select pump types and rpm Prior to determining likelihood of cavitation occurring at the calculated NPSH. Power requirement is then calculated for safe operation of pump to assist final pump selection. Test results of the program matches very closely to the design values of Paldang intake pump station(3rd stage) proving that the program can be used as an effective and practical aid for designing new regional water supply systems.

  • PDF

A Study on the Establishment of Water Supply and Demand Monitoring System and Drought Response Plan of Small-scale Water Facilities (소규모수도시설의 공급량-수요량 모니터링 체계 구축 및 가뭄 대응 방안 연구)

  • Choi, Jung-Ryel;Chung, Il-Moon;Jo, Hyun-Jae
    • The Journal of Engineering Geology
    • /
    • v.29 no.4
    • /
    • pp.469-481
    • /
    • 2019
  • In addition to structural stabilization measures such as the construction of Sand Dam, non-structural management measures such as reasonable water demand and supply volume management are needed to prevent limited water supply damage due to drought. In this study, water supply-demand monitoring system was established for drought response in Seosang-ri basin in Chuncheon, the main source of domestic water for small water facilities. The flow rate of the stream was measured for monitoring the supply volume, and the daily flow rate was calculated by using it to calibrate the parameters of the SWAT (Soil and Water Assessment Tool). To monitor demand, the daily usage was calculated by measuring the change in the water level of the water tank. The relationship between the finally calculated daily supply and demand amount was analyzed to identify the shortage of water.

Network Modeling of Paddy Irrigation System using ArcHydro GIS (ArcHydro를 이용한 GIS기반의 관개시스템 네트워크 모델링)

  • Park, Geun-Ae;Park, Min-Ji;Jang, Jung-Seok;Kim, Seong-Joon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.323-327
    • /
    • 2006
  • During the past decades in South Korea, there have been several projects to reduce water demand and save water for paddy irrigation system by automation. This is called as intensive water management system by telemetering of paddy ponding depth and canal water level and telecontrol of water supply facilities. This study suggests a method of constructing topology-based irrigation network system using GIS tools. For the network modeling, a typical agricultural watershed included reservoirs, irrigation and drainage canals, pumping stations was selected. ArcHydro tools composed of edge, junction, waterbody and watershed were used to construct hydro-network. ArcHydro Model was then designed and the network was successfully built using the HydroID. Visualization using ArcHydro tools could display table property of each object. ArcHydro Model was linked to Agricultural Water Demamd and Supply Estimation System (AWDS) which developed by Korea Rural Community and Agriculture Corporation (KRC) to extract information of the study area. And menu of supply facilities information, demand analysis and supply analysis constructed for information acquisition and visualization of acquired informations.

  • PDF

A Spread Sheet Model for a Long Range Water Supply Planning (장기 용수 공급계획 수립을 위한 스프레드 쉬트 모델)

  • 김승권
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 1992.07a
    • /
    • pp.479-489
    • /
    • 1992
  • A mathematical model for a long range water supply planning is develoted as a dynamic capacitated facility location problem, in which operation costs and two types of fixed costs are considered. The fixed costs are for water supply systems such as dams and reservoirs and for water conveyance systems of waterways or conduits from each water supply points. A Spreadsheet model is developed to support the efficiency of user interface and to implement a heuristic solution procedure. The proposed solution procedure utilizes SOLVER tool and it has been applied to a system with fictitious data but with reality and applicability in mind. As a result of the mathematical analysis, not only the most economic construction timings of surface water supply facilities and distribution systems but also the most economical water supply operating patterns are identified.

  • PDF

Development of a Concentration Prediction Model for Disinfection By-product according to Introduce the Advanced Water Treatment Process in Water Supply Network (고도정수처리에 따른 상수도 공급과정에서의 소독부산물 농도 예측모델 개발)

  • Seo, Jeewon;Kim, Kibum;Kim, Kibum;Koo, Jayong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.31 no.5
    • /
    • pp.421-430
    • /
    • 2017
  • In this study, a model was developed to predict for Disinfection By-Products (DBPs) generated in water supply networks and consumer premises, before and after the introduction of advanced water purification facilities. Based on two-way ANOVA, which was carried out to statistically verify the water quality difference in the water supply network according to introduce the advanced water treatment process. The water quality before and after advanced water purification was shown to have a statistically significant difference. A multiple regression model was developed to predict the concentration of DBPs in consumer premises before and after the introduction of advanced water purification facilities. The prediction model developed for the concentration of DBPs accurately simulated the actual measurements, as its coefficients of correlation with the actual measurements were all 0.88 or higher. In addition, the prediction for the period not used in the model development to verify the developed model also showed coefficients of correlation with the actual measurements of 0.96 or higher. As the prediction model developed in this study has an advantage in that the variables that compose the model are relatively simple when compared with those of models developed in previous studies, it is considered highly usable for further study and field application. The methodology proposed in this study and the study findings can be used to meet the level of consumer requirement related to DBPs and to analyze and set the service level when establishing a master plan for development of water supply, and a water supply facility asset management plan.