• Title/Summary/Keyword: Water Supply Facilities

Search Result 417, Processing Time 0.038 seconds

Volume Estimation Method for Greenhouse Rainwater Tank (온실 빗물 저수조의 용량산정 방법)

  • Seo, Chan Joo;Koo, Ja-Kong
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.24 no.2
    • /
    • pp.31-39
    • /
    • 2016
  • Due to the temporal variation of inflow/outflow, the water tank is needed. For the calculation of water tank capacity, the absolute difference between cumulative amounts of supply(e.g., rainfall) and demand(e.g.,watering) is used. No matter the (-) and (+) the absolute maximum capacity of the subtraction is calculated as the capacity. In this paper, using rainfall and watering of greenhouse facilities, it is proved that the non-linear supply or demand can be applied, and it is proved also that the greater non-linear variation case. And as the time interval for monitoring is decreased, the basin or tank volume are increased, with approximately 10 days as the critical monitoring interval for the annual natural rainfall event.

Toward a better environment impact assessment on dam construction (댐건설의 환경영향평가 현황과 바람직한 발전방향)

  • 이수재
    • Proceedings of the Korean Society of Environment and Ecology Conference
    • /
    • 2003.10a
    • /
    • pp.55-72
    • /
    • 2003
  • Dam is a barrier constructed to divert, hold water and raise its level for purpose of water supply, irrigation, power generation, flood control, and recreational facilities, etc. Therefore, there are many inevitable environmental impacts on dam construction. We need some better tools to predict the impacts and mitigate measures before and after dam construction. For this purpose I discussed several feasible suggestions and provisions mainly related to environmental impact assessment.

  • PDF

A Study on the operating of building equipment in apartment building - With reference to heating equipment and water-supply facilities - (고층 아파트의 건축설비 운용실태에 관한 연구 - 난방설비 및 급수설비를 중심으로 -)

  • 안창환
    • Journal of the Korean housing association
    • /
    • v.2 no.2
    • /
    • pp.35-40
    • /
    • 1991
  • In this study, the operation(heating) period of heat source(boiler) machineries in apartment building for periodic heat load analysis has been established by investigating their heat source machineries actural operation period, energy consumption, the capacity of heat source machineries, and their building element. Thus, the purpose of this paper is at bring up the various pre-estimate expression for energy conservatiove, efficient operation and amount of water supplied.

  • PDF

Performance Characteristics and Improvement Suggestion of Individual Sewage Treatment in Kyangan Watershed (경안천 유역 소규모 오수처리시설의 처리특성 및 효율개선방안)

  • Jang, Young-ho;Kim, Keug Tae;Jahng, Deok-Jin
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.5
    • /
    • pp.816-821
    • /
    • 2010
  • It has been achieved 109.1 kg/d of BOD reduction that is equivalent to the amount of BOD loading discharged from 21,880 persons and dramatic decrease of the fallout ratio against water quality of effluent, from 42% to 9%, through technical support on ISTPs to be applied by the ISMSGA at the upper area of Geongan river in Yong-In city. It was clearly revealed that the most efficient configuration for ISTP was a series of anaerobic tank, equalization basin, aerobic tank, sedimentation tank, and then effluent tank. Also, the major causes on the fallout ratio of ISTP resulted in the lack of management (67.5%) and imperfect facilities (32.5%). Then, when compared the quantity of water supply with the design capacity of ISTP, the design capacity was estimated as 1.8 or 2.4 folds larger than the real quantity of water supply so that it is essential to punctually consider the key factors such as an estimation methods, the specificity of commission operator and construction by high systematic technologies to improve the water quality for the future.

Impacts on Water Surface Level of the Geum River with the Diversion Tunnel Operation for Low Flow Augmentation of the Boryong Dam (금강-보령댐 도수터널 운영에 따른 금강 본류 내 수위 영향 분석 연구)

  • Jang, Suk-Hwan;Oh, Kyoung-Doo;Oh, Ji-Hwan
    • Journal of Environmental Science International
    • /
    • v.26 no.9
    • /
    • pp.1031-1043
    • /
    • 2017
  • Recently severe drought caused the water shortage around the western parts of Chungcheongnamdo province, South Korea. A Diversion tunnel from the Geum river to the Boryong dam, which is the water supply dam for these areas has been proposed to solve this problem. This study examined hydraulic impacts on the Geum river associated with the diversion plan assuming the severe drought condition of 2015 would persist for the simulation period of 2016. The hydraulic simulation model was verified using hydrologic and hydraulic data including hourly discharges of the Geum river and its 8 tributaries, fluctuation of tidal level at the mouth of the river, withdrawals and return flows and operation records of the Geum river barrage since Feb. 1, 2015 through May 31, 2015. For the upstream boundary condition of the Geum river predicted inflow series using the nonlinear regression equation for 2015 discharge data was used. In order to estimate the effects of uncertainty in inflow prediction to the results total four inflow series consisting of upper limit flow, expected flow, lower limit flow and instream flow were used to examine hydraulic impacts of the diversion plan. The simulation showed that in cases of upper limit and expected flows there would be no problem in taking water from the Geum river mouth with a minimum water surface level of EL(+) 1.44 m. Meanwhile, the simulation also showed that in cases of lower limit flow and instream flow there would be some problems not only in taking water for water supply from the mouth of the Geum river but also operating the diversion facility itself with minimum water surface levels of EL(+) 0.94, 0.72, 0.43, and 0.14 m for the lower limit flow without/with diversion and the instream flow without/with diversion, respectively.

Development of Ozone Generating System Applying Forward Type High Voltage Pulse Power Supply (Forward형 고압펄스 전원장치를 적용한 오존발생 시스템 의 개발)

  • 김동희;원재선;김경식;이광식;정도영;오승훈
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.52 no.7
    • /
    • pp.335-342
    • /
    • 2003
  • This paper presents a forward type high voltage pulse power supply for high voltage small current, which can be designed as a simple circuit configuration and managed easily using Power-MOSFET in the view of commercialization. According to the switching frequency, coupling factor(k) and duty ratio(D), the Principle of basic operation and the characteristics of the proposed pulse power supply are estimated. Simulation results have demonstrated the feasibility of the proposed pulse power supply. Also experimental results are presented to verify theoretical discussion with a lamp type ozonizer as a load. For studying the application at the part of environment of water, When ozonizer gas reacts with a colon bacillus, the sterilization characteristics of a colon bacillus according to the ozone concentration and response time have been investigated. This proposed pulse power supply will be able to be practically used as a pulse power supply in various environment improvement facilities like sterilization of colon bacillus, deodorization, and Nox gas elimination.

Evaluation of hydropower dam water supply capacity (III): development and application of drought operation rule for hydropower dams in Han river (발전용댐 이수능력 평가 연구 (III): 한강수계 발전용댐 가뭄단계별 운영기준 개발 및 효과 분석)

  • Jeong, Gimoon;Kang, Doosun;Kim, Taesoon
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.7
    • /
    • pp.531-543
    • /
    • 2022
  • Integrated water resources management (IWRM) has focused on efficient response to various water related disasters by climate change. In particular, more flexible usage of conventional water resources infrastructures is expected to provide an eco-friendly water management. Multi-purpose dams and water supply dams are well known as water management facilities for securing and supplying water in drought season. Recently, based on the report '2021 multi-purpose use of hydropower dams in Han river', contribution of hydropower dams on water resources management is becoming more significant beyond the traditional role of hydropower generation. In drought conditions, the dams control water supply depending on the pre-defined drought stages. In the case of multi-purpose dams, an operation standard during drought has been already prepared and applied; however, for the hydropower dams, specific standards are not fully prepared yet in South Korea. In this study, a method for calculation of standard water storage and discharge reduction of hydropower dams according to drought stage is newly proposed reflecting the characteristics of hydropower dams. The proposed method was applied to the hydropower dams in Han river, where six hydropower dams are located. A case study of the historical droughts occurred in 2014-2017 demonstrated that the proposed hydropower dam operation rule could improve the water supply stability under severe drought conditions compared to the conventional operations. In the future, the role of hydropower dams for water resources management is expected to become more important, and this study can be widely used for water supply planning such as drought response using hydropower dams.

An Investigation and Analysis on Actual Condition of Energy Utilizations in Farmhouse for Environmental-friendly Planning of Rural Villages (친환경 농촌마을계획을 위한 주거 에너지 이용실태 조사 분석)

  • Nam, Sang-Woon;Kim, Dae-Sik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.49 no.6
    • /
    • pp.55-62
    • /
    • 2007
  • Actual states of energy utilizations were investigated and analyzed on three representative rural villages in Chungcheongnam-Do. Rural residents were almost using the ondol boiler as a heating facility and oil(diesel, kerosene) and electricity(night thermal-storage power service) as a heating energy. There were a few households using briquette or firewood in a fuel hole with Korean hypocaust. Most of their cooking facilities were gas ranges using LPG. The most popular hot-water supply system was an oil boiler and the next was an electricity boiler. The amount of energy use in a rural household generally showed 20,000 to 40,000 won/month of the electric power rate, 400 to 800 liter/year of the oil and 60 to 120 kg/year of the LPG. Prompt measures should be taken to promote the spread of new and renewable energy such as solar heat, biomass and wind power, etc.

A Study on Disposal Method of Non-Point Pollutant of the Rolling Stock Depot (철도 차량기지내 비점오염물 처리방안 연구)

  • Jung, Jae-Hyoung;Shin, Min-Ho;Cho, Kook-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2910-2916
    • /
    • 2011
  • Environmental conservation is becoming the major conversation topic in the 21st century, the era of environment. In the Law for the Preservation of Water Quality, article 53 states "A business unit which is doing business causing pollution caused by non-point pollutant or builds waste water discharge facilities, should report the installation of the non-point pollutant and install the required pollution control facilities". Environmental pollution caused by oil leaks during operation or maintenance has been found in the railway sector. Especially, rolling stock depot is most likely to be affected by environmental pollution. Therefore, in this paper We have investigated non-point pollutant in the rolling stock depot area and have studied adequate disposal method to minimize the effect of the non-point pollutant, hoping to supply the preliminary data for building an environment-friendly rolling stock depot.

  • PDF

Development of leakage test facility for leak signal characteristic analysis in water pipeline (상수도관로 누수신호의 특성 분석을 위한 누수 실험시설 개발)

  • Park, Sanghyuk;Kwak, Philljae;Lee, Hyundong;Choi, Changho
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.31 no.5
    • /
    • pp.459-469
    • /
    • 2017
  • A real scale leakage test facility was developed to study the leak signal characteristics of water supply pipelines, and then leak tests were carried out. The facility was designed to overcome the limited experimental circumstances of domestic water supply pipeline experimental facilities. The length of the pipeline, which was installed as a straight line, is 280m. Six pipes were installed on a 70m interval with different pipe material and diameters that are DCIP(D200, D150, D100, D80), PE(D75) and PVC(D75).The intensity of the leakage is adjusted by changing the size of the leak hole and the opening rate of ball valve. Various pressure conditions were simulated using a pressure reducing valve.To minimize external noise sources which, deteriorate the quality of measured leak signal, the facility was built at a quiet area, where traffic and water consumption by customers is relatively rare. In addition, the usage of electric equipment was minimized to block out noise and the facility was operated using manual mode. From the experimental results of measured leakage signal at the facility, it was found that the signal intensity weakened and the signal of high frequency band attenuated as the distance from the water leakage point increased.