• Title/Summary/Keyword: Water Plan

Search Result 1,682, Processing Time 0.033 seconds

A Study on the Characteristics of Spatial Structure of Jiangnan Watertown(水鄕鎭) in China - Focusing on Wuzhen and Nanxun in Zhejiang Province - (중국 강남 수향진의 수변공간 특성 연구 - 절강성 오진과 남심을 사례로 -)

  • Choi, Jung-Kwon;Choi, Jung-Mean
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.34 no.4
    • /
    • pp.98-109
    • /
    • 2016
  • The purpose of this study is to identify characteristics of spatial structure of Jiangnan water town in China which has been developed along the water channel. Spatial structural characteristics of the water town, Wuzhen and Nanxun in Zhejiang Province are as follows. First, location of town, spatial framework, lot division, and architectural style get determined by the water channel. The water channel is constructed in cross shape, T-shape, or in combination. Secondly, public space of water town is established along main water channel. Visually and functionally alternating private buildings are established on the water channel side and they are creating unique landscape of Jiangnan water town in overall harmony. Thirdly, residential area is established on the east-west water channel side with southward sunny-faced arrangement and waterside residence is in introvert spatial structure with courtyard but the exterior space is connected with water channel intimately. Fourthly, various spatial components along the water channel enrich the sense of place in water town. The components are corridor with roof, tea house, waterside steps, waterside theater and watergate etc. Uniqueness of place is becoming the core competence in modern townscape. In this aspect, Jiangnan water town with historical and cultural accumulation is suggesting a significant implication. Major implications are as follows. First, promotion of proximity to the water is the basic value that the spatial plan of waterfront needs to pursue. Secondly, mixed use is essential for effective land use and revitalization of waterfront. Thirdly, waterfront plan based on the local uniqueness as the place asset is being required.

Forecasting the Long-term Water Demand Using System Dynamics in Seoul (시스템 다이내믹스법을 이용한 서울특별시의 장기 물수요예측)

  • Kim, Shin-Geol;Pyon, Sin-Suk;Kim, Young-Sang;Koo, Ja-Yong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.20 no.2
    • /
    • pp.187-196
    • /
    • 2006
  • Forecasting the long-term water demand is important in the plan of water supply system because the location and capacity of water facilities are decided according to it. To forecast the long-term water demand, the existing method based on lpcd and population has been usually used. But, these days the trend among the variation of water demand has been disappeared, so expressing other variation of it is needed to forecast correct water demand. To accomplish it, we introduced the System Dynamics method to consider total connections of water demand factor. Firstly, the factors connected with water demand were divided into three sectors(water demand, industry, and population sectors), and the connections of factors were set with multiple regression model. And it was compared to existing method. The results are as followings. The correlation efficients are 0.330 in existing model and 0.960 in SD model and MAE are 3.96% in existing model and 1.68% in SD model. So, it is proved that SD model is superior to the existing model. To forecast the long-term water demand, scenarios were made with variations of employment condition, economic condition and consumer price indexes and forecasted water demands in 2012. After all scenarios were performed, the results showed that it was not needed to increase the water supply ability in Seoul.

Tidal behavior changes in Mangyeong reservoir area with permitting sea-water intrusion through the sluice gate (만경수역 해수 유통시 조석환경변화 고찰)

  • Kwun, Soon-Kuk;Park, Yeong-Wook
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2001.10a
    • /
    • pp.21-24
    • /
    • 2001
  • As one of the phil-environmental alternative plan of Saemankeum project, gradual development is recommended. The procedure of the Saemankeum project start with the completion of 32 km long sea-dikes which contains two discharge gates until the year 2004. Second step is pre-development of Mangyoung area permitting temporary intrusion of sea water, i.e. tides, by the opening of discharge gate until the environmental evaluation on the water quality of this area secures permanent meet to government's water quality standard. Therefore this study is to predict the future condition of this tidal flat with the point of view tidal environments, salt, water quality, soil mechanics, etc. of Mangyoung area when the sea water still passed in the inland reservoir through the discharge gate.

  • PDF

Study on Constructibility considering Changes of Groundwater Level in Kwang Yang port (광양지역 지하수위 변화를 고려한 시공성에 관한 연구)

  • Kim, Byeong-Ho;Yang, Tae-Seon;Lee, Song
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.1120-1125
    • /
    • 2006
  • Larger area will be constructed in a harbor land and container terminal which are constructed in reclaimed land using the dredged materials. Soil improvement work is to be carried out including constructibility, in which is monitoring devices, measuring frequency, installations etc. The ground water tables in the reclaimed area are affected by the several factors which are design reclamation level, consolidation settlement, remaining surcharge pressure and remaining excess pore water pressure. The plan wii be drawn up in which monitoring results for the ground water tables are capable to provide the reliable ground water table when designers and civil engineers construct the harbor structures considering constructibility.

  • PDF

Anhui Water Resource Situation and General Plan

  • Yiqun, Hou
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.67-73
    • /
    • 2007
  • Anhui Province, with a total north-south length of 570km and an east-west width of 450km and a total area of 139.6 thousand km2, accounts for 1.45% of China's total area. The landform and land feature of Anhui Province is diverse, and generally it can be divided into 5 natural regions: (1) Huaibei Plain; (2) Jianghuai Hillocks; (3) Dabie Mountains in the West of Anhui Province; (4) Yanjiang Plain, (5) Mountain Area of southern Anhui Province. Anhui Province is located in the transitional zone of warm and humid zone and subtropical zone, and its mean annual precipitation is 800-1800mm. The province, which has diverse climate, multiple land forms and many rivers and lakes, passes three basins (Huaihe River, Yangtze River and Xin'an River) and has large differences in the time distribution and regional distribution of water resource. Therefore, the development and usage conditions of the water resource in different regions are different.

  • PDF

Development of Water Supply System for Water Demand (물수요중심 용수공급 시스템 개발)

  • Chung, Kwang-Kun;Lee, Kwang-Ya;Kim, Hea-Do;Lee, Jong-Nam
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.85-90
    • /
    • 2005
  • A Water Level gauge which composes a water supply system for water demand, information transmission system and the solar storehouse electromotive floodgate, regarding the structure plan and a production of the nothing power automatic floodgate it described. The important point must solve but urgently will compare the water amount used from system establishment place or not one. and It must give proof the efficient characteristic of system, must solve the technical problem portion against revision of the accuracy of upper downstream canal which is information transmission system of the Self-controlled check gate. The solar floodgate is more economic with the base which will reach and the system construction which is accurate.

  • PDF

Analysis of Sediment Flushing Effect for Reservoir Sedimentation Management of the Patrind Dam in Pakistan (파키스탄 파트린드댐의 저수지 퇴사관리를 위한 배사효과 분석)

  • Noh, Joonwoo;Park, Jinhyeog;Hur, Youngteck;Kim, Sangho
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.6
    • /
    • pp.799-807
    • /
    • 2013
  • Reservoir sedimentation is one of the major concerns for sustainable reservoir operation. Since sediment concentration of the rivers in the Himalayan Mountain is very high, a proper sediment management scheme is necessary. This paper presents long-term reservoir sedimentation and sediment flushing based on the gate operation. Focused on the reservoir to be constructed for the Patrind hydropower project in Pakistan, 4 different flushing scenarios were proposed in this study to prevent successive sedimentation. By extending flushing period and by increasing the flushing discharge for 2 times, the flushing rate increases up to 53.2% and 43.6% in proportion to flushing period and discharge, respectively. Based on the simulation presented in this paper, it is expected to establish efficient sediment management plan to increase hydro power generation and sediment flushing simultaneously.

Establishment of the Service Life of the Education Fcilities - Focused on the Roof water-proof and Floor finishings - (교육시설 내용년한 산정 연구 - 옥상방수와 바닥마감재를 대상으로 -)

  • Lee, Kang-Hee;Chae, Chang-U
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.24 no.6
    • /
    • pp.27-36
    • /
    • 2017
  • Educational facilities have an affect to make a decently learning environment. After constructed, it needs a maintenance plan to keep the performance or function which provide the repair time, repair scope and ratio. But the fundamental data are so insufficient that the field worker can't provide the maintenance plan and has no choice use the other data which concerned with apartment or office building. Above all, the service life is indispensible to make a repair plan because the repair time and scope would be provided within the service life. This study aimed at providing the method to make a service life of component in educational facilities and applying the method into the roof proof and floor finishing. Results are shown that first, it is important to set the $1^{st}$ repair time after constructed. when it proposes the three ways with the probability approach, choice probability model and cumulative cost function. Second, the service life of roof proof is provided with about 35 years. In addition, the service life of the floor finishing is about 40 years. These result would be utilized to conduct the repair plan under the service life.

Basic Research on Mid-to-Long-term Management Plan of Purchased Land by Evaluating Ecological Function of Waterfront Area of Geum River (금강수계 수변구역의 생태 기능 평가를 통한 매수토지 중장기 관리 방안 기초 연구)

  • Seo, Jung-young
    • Journal of Environmental Science International
    • /
    • v.28 no.3
    • /
    • pp.371-384
    • /
    • 2019
  • The purpose of this study was to propose an efficient management plan for purchased land considering the hydrological, watershed characteristics and ecological functions of the target land and surrounding area based on the result of monitoring the water quality improvement effect obtained by purchasing the land in the watershed area in the Geum river system. For this purpose, this study investigated through literature review, and examined ways to apply them to this research by deriving implications from a comprehensive analysis of previous research cases. After that, the components of assessment were derived to evaluate the ecological function of the purchase land, and the ecological function evaluation model for each land and area was proposed. In order to select purchase and restoration priorities of the land, this study analyzed the ecological status of the purchased land in main watersheds and tributaries using Arc GIS ver 10.1. Through this, a process to select restoration priorities was developed. And this study constructed the integrated management process with proposing a mid - to long - term plan by integrating the purchased land valuation and restoration priority selection process. Based on this process, this study suggested an effective management plan for purchased land through the integrated ecological management system of lands purchased. It can be used systematically in appraisal valuation, land purchase system, restoration project, and follow-up management of land purchase.

A Study on the Improvement of Price Structure of Multi-regional Water Supply System in Korea (국내 광역상수도 요금제도의 개선 방향에 관한 연구)

  • Kim, Yeon-Bae;Heo, Eun-Nyeong;Kim, Tae-Yu;Kim, Wan-Gyu
    • Journal of Korea Water Resources Association
    • /
    • v.32 no.5
    • /
    • pp.537-545
    • /
    • 1999
  • This study examines three counterplans for the improvement in price structure of Korean multi-regional water supply system. First, price differentiation between industrial and residential water uses is analyzed using several pricing methods. It has been estimated that the industrial water price by the Ramsey pricing method is needed to be two to two and half times higher than the price of residential water to achieve maximum social welfare. Second, peak-load pricing is then studied to seek for the effectiveness of seasonal differentiation in water price. It has been found that consideration of dam facilities and their functions is the key factor for the effectiveness of the seasonal differentiation in water price. Finally, the discussion about the introduction of contract pricing system to the multi regional water supply system to achieve optimal investment plan for the future water demand is presented. We has found that the introduction of contract pricing system will greatly increase the efficiency in future investment plan of the multi-regional water supply system.

  • PDF