• Title/Summary/Keyword: Water Plan

Search Result 1,687, Processing Time 0.026 seconds

Vibration Reduction of Vertical Pumps Used in the Power Plant Circulating Water System (발전소 순환수계통 수직펌프의 진동저감에 관한 연구)

  • Park, Hyeok;Yoo, Ho-Seon
    • Plant Journal
    • /
    • v.9 no.1
    • /
    • pp.43-49
    • /
    • 2013
  • In this study, the natural frequency of the actual operating vertical pump in the P combined cycle power plant is measured and the cause of high vibration is determined by using fluid-structure coupled vibration theory. Choosing the vibration reduction plan suited for field conditions and using the numerical analysis verify effectiveness of the plan. The plan is applied to the actual pump and the empirical experiments are conducted.

  • PDF

KO AC/DC Converter System Installation Status and Commissioning Plan at ITER Site (이터 초전도자석 전원공급장치 현장 설치현황 및 시운전 계획)

  • Song, Inho;Oh, Jong-Seok
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.27 no.5
    • /
    • pp.397-401
    • /
    • 2022
  • The construction of the ITER tokamak machine is ongoing at a 77% process rate to achieve the first plasma in 2025. The 18 sets of power supply systems comprising 400 MVA thyristor AC/DC converters for the superconducting magnets supplied by Korea (KO) are being installed with other systems, such as PF converters (China), DC busbars (Russia), and cooling water systems (India), in two buildings (Europe). The system interfaces have been defined during the design stage, and the systems have been manufactured. However, during the on-site installation work, several installation and integration issues emerged due to the manufacturing tolerance and design mistakes. To continue the installation and testing, the engineers of each system resolved the interface issues, planned the commissioning, and integrated the test plan. This paper describes the on-site installation status and issues and the commissioning plan of KO AC/DC converters.

A Study on Impact Assessment for Application of Strengthened Compliance Concentration of Effluent Limit from PSTWs in the Jinwee-stream Watershed (유역하수도에서 강화된 방류수 수질 준수농도 적용을 위한 진위천수계 수질영향 평가)

  • Jeong, Dong-Hwan;Cho, Yangseok;Ahn, Ki-Hong;Ryu, Jichul;Ahn, Kyunghee;Chung, Hyen-Mi;Kwon, Ohsang
    • Journal of Environmental Impact Assessment
    • /
    • v.24 no.5
    • /
    • pp.397-406
    • /
    • 2015
  • The different compliance concentration of effluent limit is applied to effluent discharged from public sewage treatment works(PSTWs) in each watershed on the basis of water quality thereof in accordance with the enforced Watershed Sewer System Maintenance Plan in 2013. It is necessary to set the compliance concentration of effluent limit for PSTWs in watershed sewer system, in order to achieve water quality criteria for regional watersheds or target water quality under TMDL program. Watershed Environmental Agencies establish the Watershed Sewer System Maintenance Plan and set the compliance concentration of effluent limit for PSTWs under the plan. The agencies have a plan to apply strengthened effluent BOD concentration limits for PSTWs in I to IV area grade, respectively. Effluent BOD concentration limits will be strengthened from 5~10 mg/L to 3 mg/L in II~III area grade, from 10 mg/L to 5 mg/L in IV area grade. Uniform application of effluent BOD concentration limits to PSTWs in the watershed sewer system need to be complemented considering type of sewage treatment technology employed and watershed characteristics. Therefore, this study presents assessment methodology which analyze for the compliance concentration of effluent limit to affect water quality of discharge watershed using simulation model for the Jinwee-stream watershed.

Sub-Components Evaluation Method of Potential Flood Damage Considering Yearly Change and Improved Method (연도별 변화와 개선된 방법을 고려한 홍수피해잠재능의 세부 항목 평가 방안)

  • Hong, Seungjin;Joo, Hongjun;Kim, Kyoungtak;Kim, Hung Soo
    • Journal of Wetlands Research
    • /
    • v.20 no.4
    • /
    • pp.370-382
    • /
    • 2018
  • The purpose of this study is to quantitatively and effectively evaluate the factors affecting flood damage by watershed. National Water Resource Plan(MOCT, 2001) has been developed Potential Flood Damage(PFD) which indicates flood vulnerability. But, it is only a simple grouping and it does not provide guidelines for flood control planning based on detailed evaluation of sub-components. In this study, we used PFD in the Han River basin according to the method applied in the National Water Resource Plan (existing method) and improvement based on actual flood hazard area and data. As an application method, after analyzing by yearly change(2009~2014), we compared and analyzed the tendency of the sub - components that constitute the potential and risk rather than the current grouping. As the result, it was possible to accurately evaluate the existing and improved methods, and it was possible to derive the vulnerability rankings, but the existing methods have different results from the actual watershed tendency. Therefore, the PFD of the improvement method that correctly reflects past history and watershed characteristics is more appropriate for the evaluation of flood vulnerability in the watershed. In addition, it is reasonable to establish a flood control plan referring to this and prevent flood damage in advance.

Economical Evaluation Based on Method of Coagulation with GAC Adsorber Operation (활성탄 흡착지의 운영시 응집 방법에 따른 경제성 평가)

  • Hong, Seongho;Sung, Dae-Hyun
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.19 no.4
    • /
    • pp.473-479
    • /
    • 2005
  • Applying enhanced coagulation is not uncommon not only to improve water quality but also to obtain economical advantages in water treatment. In this study, the economical evaluation was investigated with considering dosage of coagulant, produced sludges and usage of activated carbon with two different water sources. To simulate the granular activated carbon(GAC) adsorber mini-column test was adapted. Even if there were some variation according to the source waters, the life time of GAC was extended 60 to 110days with adding 2.5 to 3 times of coagulant in enhanced coagulation. With assumption of changing GAC adsorber at 50% of breakthrough the total treatment cost can be reduced to range from 25% to 44% with adapting the enhanced coagulation. The obtained value can not be generalized because the value can be varied by water quality and cost of the GAC or coagulant. However, the evaluation can be basis starting point to find optimum operation methods for the drinking water treatment which has plan to adapt GAC adsorber.

A Plan on the Flood Control Ability Improvement Project to maintain stability of existing dams (기존댐 치수능력 증대사업의 시행 방안)

  • Lee, Wan-Ho;Ahn, Hee-Bok
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.191-201
    • /
    • 2006
  • The flood control ability improvement project on existing dams is the project for prevention of disasters from excessive flood due to climate changes and thus protects lives and property damages by increasing safety of dams. The collapse of dam brings unimaginable disasters, so the project needs to be swiftly conducted by Government's funding. This paper introduces tile examples of the flood control ability improvement projects of multi-purpose and water supply dams, which is conducted in the way of structural measures among 26 dams operated by Kwater.

  • PDF

Sensitivity Analysis of Water Supply-Wastewater Allocation Model (용수-폐수 분배모형의 민감도분석)

  • 이길성
    • Water for future
    • /
    • v.16 no.1
    • /
    • pp.41-48
    • /
    • 1983
  • The competition for water for municipal, industrial and agricultura and agricultural uses is growing keener as the world fooe and energy crises are intensifying. It is therefore becoming important how systems engineering techniques can be used to plan effectively for the future development of water supply and waste water management systems in a regional area. The feasible direction method and the out-of-kilter algorithm enable us to find the least-cost mix of alternative allocation networks. The interaction between land use patterns and urban water resources, and the environmental impact of alternative policies are discussed.

  • PDF

Climate Change Impacts on Paddy Water Requirement (기후변화가 논 필요수량에 미치는 영향)

  • Yun, Dong-Koun;Chung, Sang-Ok;Kim, Seong-Joon
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.53 no.4
    • /
    • pp.39-47
    • /
    • 2011
  • The aim of the study is to predict potential evapotranspiration and crop water requirement using meteorological data from MIROC3.2 with A1B scenario. Increase of evapotranspiration due to temperature rise can be observed out of the analysis, while effective rainfall decreased. The evapotranspiration elevation results in large amount of crop water requirement in the paddy farming. It can be seen that rainfall intensification at non-irrigation period brings effective rainfall decrease, while contributes to higher demand of crop water at irrigation period. It is necessary to secure additional water resources to adapt the climate change. It is expected that estimation on potentialevapotranspiration in this study can be used for formulation of master plan of water resources.

A Study on the Index of Drought and Drought Management Considering Reservoir Storage (저수용량을 고려한 가뭄지수 산정과 가뭄관리에 관한 연구)

  • Cho, Hong Je;Park, Han Ki;Kim, Su Hyun
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.12 no.4
    • /
    • pp.97-105
    • /
    • 1998
  • The goal of the present research was to develop a mean to determine indices of drought warning and emergency necessary to manage drought and establish water supply contingency plan for the municipal and industrial water supply system in urban areas. To do this, we worked on the Sayun catchment which is the main water source of Ulsan and used measured hydrologic data (storage, inflow, supply, outflow) from 1980 to 1996. The indices of drought calculated by the method of Phillips drought index based only on monthly precipitation do not pertinently represent drought phenomena in case water supply is from dam or reservoir in an urban area. Therefor, we developed the drought index technique including inflow, storage, outflow and supply which are the chief factors of drought management. The result showed that the method of Phillips drought index considering the capacity of water supply was excellent when applied to practical drought phenomena.

  • PDF

A Study on Assessment Indicators for Integrated Management on Korea National Planning and Environmental Planning (국토계획과 환경계획 통합관리 지표 개발 연구)

  • Heo, Han-Kyul;Sung, Hyun-Chan;Lee, Dong-Kun;Heo, Min-Ju;Park, Jin-Han
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.21 no.3
    • /
    • pp.27-45
    • /
    • 2018
  • Both the national land plan and the environmental plan reflect the need for sustainable land use and management. However, the linkage between the plans is reduced due to the lack of integrated management. Therefore, this study developed indicators to achieve integrated management. A total of 59 environmental plans were reviewed for the development of indicators, and a total of 74 integrated management indicators were derived through a three-stage process. In this process, the relevance of the integrated management indicators of this study to the UN 's sustainable development goals (SDGs) is presented in order to derive indicators that meet the level of international consultation. In order to facilitate the utilization of the indicators, the final indicators are divided into seven areas: natural ecology, water resource and quality, urban and green space, atmospheric, energy, landscape, resource circulation and waste. Furthermore, the indicators were classified into national, regional, and city level. Accordingly, the final indicator can be adapted to the field of influence of the planned to be established, and the indicator can be selected and applied to the level of the plan. The final indicators can be used to examine the extent to which the national plan reflects the contents of the environmental plan and can be used as an aid to confirm the contents to be included in the plan when establishing a new national plan.