• Title/Summary/Keyword: Water Pipeline

Search Result 382, Processing Time 0.018 seconds

Constrution and Application of Underground Facilities Survey System using the 3D Integration Map of Underground Geospatial Information (3차원 지하공간통합지도를 활용한 지하시설물 현장 측량 시스템 구축 및 적용)

  • SONG, Seok-Jin;CHO, Hae-Yong;HEO, Hyun-Min;KIM, Sung-Gil
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.24 no.4
    • /
    • pp.164-173
    • /
    • 2021
  • Recently, as underground space safety issues such as sink hole, ground subsidence and damage to old underground facilities have been increasing in urban areas, the precise management of underground facilities ins more required. Thus, this study developed a function to that, visualize on Integration Map of Underground Geospatial Information a real-time survey data of underground facilities acquired on site or underground facility survey data acquired through on-site survey after underground facility exploration and developed a function convert to surveying-results. In addition, using the on-site survey performance utilization function in connection with the Integration Map of Underground Geospatial Information developed through this study, the surveying -results obtained with the Total-station at the water pipeline burial construction site in Eunpyeong-gu, Seoul are visualized on the Integration Map of Underground Geospatial Information and On-site verification was performed by converting spatial-information performance files and transmitting the Integration Map of Underground Geospatial Information to the mobile center. Based on this, it was possible to verify the work procedure using the surveying-results in the area where the Integration Map of Underground Geospatial Information was built, and to review the direction of future improvement directions.

Estimation of the Optimum Number of Machines and Equipments for Professional Dairy Farm (낙농 전업농의 기계장치 최적 규모 추정)

  • 유병기;이용범;장진택;이동현;권두중;기광석;성시흥;이대원
    • Journal of Animal Environmental Science
    • /
    • v.2 no.1
    • /
    • pp.27-39
    • /
    • 1996
  • A survey was conducted for dairy farmer to estimate the optimum number of machine and equipment in 1994. Labor hours, operation costs and operation methods for each dairy processing were investigated and analyzed for the farmers to find the expected numbers of machine and equipment on the basis of the desired farm scale. And also, the estimated models were compared and analyzed with the conventional models which more than half dairy farmers used bucket milker in tie stall barn. Some of the results are as follows : 1. Analysis results of conventional model showed that a dairy farm could raise to 15 heads of dairy cow with family labor of 1.5 men, labor hours of 2, 700 in you and total operation costs of 734 thousand won per head. 2. The result, used in conjunction with minimum operation costs in tie stall barn, showed that 28 dairy cows could be raised by using concentrates feeding by hoppers, water supply by water cups, milking by pipeline milker, and manure cleaning by barn cleaner with total operation costs of 520 thousands won per head. 3. The total operation costs of a loose barn system is higher than those of tie stall barn system to raise about 30 heads. For the loose barn system, the herringbone parlour was used for milking, concentrate feeding by automatic concentrate feeder, water supply by thermal insulation feeder, and manure cleaning by scraper with total operation costs of 582 thousands won per head every year.

  • PDF