This study aims at the development of a mathematical approach for the optimal water allocation in the river basin where available water is not in sufficient. Its optimal allocation model is determined from the comparison and analysis of mathematical programming techniques such as transportation programming and dynamic programming models at its optimal allocation models. The water allocation system used in this study is designed to be the optimal water allocation which can satisfy the water deficit in each district through inter-basin water transfer between Kumho river basin which is a tributary catchment of Nakdong river basin, and the adjacent Hyungsan river basin, Milyang river basin and Nakdong upstream river basin. A general rule of water allocation is obtained for each district in the basins as the result of analysis of the optimal water allocation in the water allocation system. Also a comparison of the developed models proves that there is no big difference between the models Therefore transportation programming model indicates most adequate to the complex water allocation system in terms of its characteristics It can be seen, however, that dynamic programming model shows water allocation effect which produces greater net benefit more or less.
Based on water resources availability and development condition of the Lancang River, as well as considering the international river water resources characters, the paper put forwarded an integrated allocation way of the water resources of Lancang River Basin. According to the basic rules of equitable and suitable utilization of water resources of international rivers, water resources demand for domestic, industrial, irrigation and ecosystem system, and principles of society stabilities and the food safety etc, an index system of Lancang River water resources allocation was set up. Two levels scheme of Lancang River water allocation are proposed. First level is for an international water, which primarily to analysis the water quantity at the national boundary. Second level is for provincial water allocation among Qinghai, Yunnan provinces and Tibetan Autonomous Region. In the allocation schemes, the water resources development of Lancang River Basin at different scenarios and the related water allocation in different years and seasons were analyzed. A discharge to some cross sections of the river and a total amount water quantity for each district has been given as well.
In this study, an optimization technique was developed from the application of Allocation Rule. Average Allocation coefficients of the Andong and Imha dam compare constant water supply condition with vary water supply condition that are above the contribute ratio $67\%\~50\%$ the Andong dam in Rule(A)-Rule(C). In the Refill Season, Andong dam water supply contribution is higher than Imha dam at the Control point water supply. In the Allocation analysis results, Rule(A) is calculated storage ratio because Andong dam contribute to Control point larger than Imha dam which Andong dam storage is larger than Imha dam storage. Rule(B) calculated sum of the storage and inflow ratio for Andong dam and Imha dam, as Andong dam contribution is higher than Imha dam. Rule(C) calculated that sum of storage, inflow and water supply is divided average storage ratio, as the best results of the Allocation coefficients and water supply capacity. The results of storage analysis is larger vary water supply condition than constant water supply condition and the results of water supply analysis is larger vary water supply condition than constant water supply condition. Water supply deficit is decrease $30\%$ for vary water supply condition.
인구가 증가하고 경제가 발전하면서 한정된 수자원에 대한 다양한 수요자의 수자원 확보 경쟁이 발생하고 있다. 이러한 현실로 인해 법과 제도에 의한 물배분에 대한 관심이 커지고 있는 실정이다. 본 논문에서는 한정된 수자원을 확보하기 위한 수요자에게 배분하기 위한 유역 전체를 고려한 최적의 물배분 기법을 개발하였다. 이러한 물배분 기법은 유역 전반에 걸친 분석를 고려할 때 최적화 기법에 의존할 수밖에 없으며 제시된 모형은 경제적 효율성, 형평성, 지속가능성의 목적을 달성하기 위하여 노력하였다. 적절한 사례연구를 통하여 기존의 수리권 시스템과 더불어 제시된 모형을 검토 되었다. 도출된 결과는 복잡한 수문학적 시스템뿐만 아니라 법적, 제도적 제약조건 하에서의 적용성을 보여 주고 있다.
It is necessary to evaluate performances hitherto carried out in the management of Total Maximum Daily Loads (TMDLs) and to set up direction so that this system can be improved continuously in the future. This study was investigated load allocation achievement ratio, water quality goal achievement ratio and interrelation between water quality goal and load allocation for the first period (2004~2010). Load allocation achievement and BOD water quality goal achievement ratio were 50% and 73% in Guem River Basin, respectively. The main reason for excess of load allocation and shortfall of water quality goal were unfulfilled reduction plan and pollution sources increment. Therefore, it is necessary to develop enhanced pollution sources prediction method and make a list realizable reduction plan. 63% of the unit watershed was not interrelation between water quality goal and load allocation. The reason why water quality goal and load allocation had not correlation were water quality of upper unit watershed, increment of inflow quantity, effluent water quality of wastewater treatment plant affected the unit watershed, increment of inner productivity by algae, water quality deterioration during the specific period, river management flow, etc.
The Citarum River Basin is the biggest river basin in West Java Province, Indonesia and it plays strategic roles in providing water for irrigation, domestic and industrial uses, and power generation, besides controlling the flood during rainy season. Flowing through seven major cities makes the river flow and water demand are vulnerable to land use change around the river. The present water resources management has involved the regulator, operator, and users in deciding an appropriate water management plan for the entire basin. The plan includes an operation plan for three reservoirs, construction or maintenance of the river channel, and water allocation for all users along the river. Following this plan, a smaller operation group will execute and evaluates the plan based on the actual flow condition. Recently, a deforestation, environment degradation, river sedimentation, a rapid growth of population and industry, also public health become new issues that should be considered in water basin planning. Facing these arising issues, a new development program named ICWRMIP was established to advance the existing management system. This program includes actions to strengthen institutional collaboration, do the restoration and conservation of the river environment, improve water quality and public health, also advance the water allocation system. At present, the water allocation plan is created annually based on a forecasted flow data and water usage prediction report. Sometimes this method causes a difficulty for the operator when the actual flow condition is not the same as the prediction. Improving existing system, a lot of water allocation studies, including a development of the database and water allocation simulation model have been placed to help stakeholders decide the suitable planning schemes. In the future, this study also tries to contribute in advancing water allocation planning by creating an optimization model which ease stakeholders discover a suitable water allocation plan for individual users.
Pollution load allocation can likely be much controversial, which is essential to formulate the total water pollution load management plan. Existing rules(or guidances) in Korea, can provide no specific criteria for load allocation. Therefore, this paper studied(comprehensively) possible standards how or why to choose any particular allocation method, which was applied in the Gwangju City's load allocation for the satisfaction of set water quality goal. This load allocation is basically focused on the load reduction of domestic wastewater rather than industrial wastewater, because the land-use is strictly regulated and larger sources of pollution are few in the Gwangju City. This paper recommends the city to increase the capacity of sewage treatment plants, promote sewerage maintenance, and set higher effluent standards.
최적화된 물 공급 계획은 물을 둘러싼 이해관계와 사회-경제-환경적 요구사항을 충족시킬 수 있는 합리적이고 경제적인 수자원의 배분 및 활용 방안을 의미한다. 하지만, 전 세계적으로 기후변화와 인구증가 등의 다양한 요인에 의해 물 부족 현상이 심화되고 있다. 최근의 수자원 공급 계획은 수원의 다변화와 더불어 수요 관리 및 물이용 효율을 높이는 방향으로 변화하고 있다. 따라서 한정된 수자원의 이용 효율을 높이고, 물 부족에 따른 분쟁을 해소하기 위한 공학적 도구로써 다양한 물 배분 모형이 개발되어 활용되고 있다. 본 연구에서는 수자원의 용도에 따른 경제적 가치와 물공급 안정성을 기반으로 물 배분 계획을 수립하는 수자원-경제 통합 물 배분 모형을 개발하였다. 개발 모형은 기존 물 배분 모형의 최적화 알고리즘을 개선하고, 목적함수를 다양화함으로써 효율적인 물 배분을 위한 의사결정도구로 활용될 수 있을 것으로 기대한다.
The Waikato River is New Zealand's longest River, though relatively small on international scales. It drains the central North Island and has New Zealand's largest lake (Lake Taupo) at its headwaters. The upper reaches have sustained flows fed by large aquifers which are recharged by rainfall events providing relatively constant river flows, whereas the lower reaches respond more directly to rainfall events having more peaky flows after rainfall and extreme low flows during dry periods. Consumptive allocation from the river is relatively low with only about 3% of the mean annual flow being allocated. However, more than seven times the river's flow is allocated for non-consumptive purposes before discharging to the Tasman Sea. The majority of this non-consumptive allocation is for hydro power generation and as cooling water at both thermal and geothermal power stations which produce up to 25% of New Zealand's electricity. The upper half of the river has been heavily modified with the construction of eight dams for power generation. This has resulted in a succession of cascading dams replacing the previously uncontrolled river. The Waikato River also provides drinking water for Auckland City (NZ's largest city) and Hamilton City (NZ's 4th largest city). In recent years there has also been considerable growth in water requirements for pasture irrigation to support the intensification of dairy farming in the catchment. Operators of the power stations are concerned that any further consumptive allocation will further reduce their ability to generate electricity. The Waikato Regional Council, who is charged with managing the river and allocation of water, has recently set new rules for managing the conflicting allocation demands on the Waikato River. This has resulted in an end to further allocation of water where it results in a loss of water for electricity generation from renewable resources (fresh water and geothermal water). The exception to this is the prioritisation of water for municipal supplies ahead of other consumptive uses such as industries and irrigators.
본 연구는 합리적 용수배분의 기본원칙으로 효율성, 형평성과 지속가능성을 설정하고, 용도별 용수의 상대적 중요도를 나타내는 용도가중치와 각 수요처의 지역적 특성을 대표하는 지역가중치를 산정 하였다. 용도가중치는 계층화분석과정(AHP, Analytic Hierarchy Process)기법을 사용하였으며, 지역가중치는 사회ㆍ경제적 통계치를 반영한 지역특성가중치와 지역규모가중치를 조합하여 산정 하였다. 이러한 가중치를 적용하여 댐을 중심으로 한 용수배분 방안을 수립하고 이를 가상 물부족 상황에서 부산, 대구, 고령군 일부를 수요처로 하는 안동댐에 적용하였다. 우선순위 (priority)에 의한 용수배분이 최하순위의 용도나 지역에서 모든 물 부족을 부담하는데 반하여 상대적 가중치에 의한 용수배분은 모든 용도와 지역에 물부족량이 분산되므로 보다 합리적인 것으로 판단된다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.