• 제목/요약/키워드: Warranty Period

Search Result 117, Processing Time 0.025 seconds

Warranty Servicing Cost Analysis Using Phase-Type Lifetime Distributions (Phase-Type 분포를 이용한 보증서비스 비용 분석)

  • 김호균;백천현;조형수
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.25 no.3
    • /
    • pp.41-48
    • /
    • 2000
  • We consider the question of warranties for repairable items. During the warranty period, each time an item fails the manufacturer has the obligation to restore the item to operational condition either by repairing the item or by replacing it by a new item. In this paper, we consider a warranty policy for making this decision based on the condition of the failed item. For products with phase-type lifetime distributions where the phases represent the condition of the item, we develop algorithms to determine the expected cost of servicing a warranty and use it in making the repair/replacement decision. illustrative numerical examples are presented.

  • PDF

A study on the Application Scheme of the Warranty contract in constructions (건설공사의 성능계약 도입방안에 관한 연구)

  • Kim, Dae-Gil;Jeong, Ho-Geun;Seo, Young-Chil;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.89-92
    • /
    • 2007
  • Since 1960s, advanced constructions have introduced warranty contract which is warranted to quality and performance for need of owner in determined term to ensure the quality of construction. However, the interior of a country encounter another problem result from Defects Liability what indefiniteness of defects standard, excess responsibility period, social recognition of be identical fraudulent work and defects, and contract with ascendancy of owners. etc, so builders concerned more excess defects liability than the quality of construction. The purpose of this study is to analysis of warranty contract in order to solve the problem such as stated above.

  • PDF

Periodic PM Policy for Repairable System with RCW or NCW

  • Jung, Gi-Mum;Kim, Dae-Kyung;Park, Dong-Ho
    • International Journal of Reliability and Applications
    • /
    • v.3 no.3
    • /
    • pp.113-124
    • /
    • 2002
  • This paper suggests the optimal periodic preventive maintenance policies after the combination warranty is expired. After the combination warranty is expired, a repairable system undergoes PM periodically and is minimally repaired at each failure. And also the system is replaced by a new system at the N th PM. In this case, we derive the mathematical formula for the expected cost rate per unit time. The optimal number and period for the periodic PM that minimize the expected cost rate per unit time are obtained. Some numerical examples are presented for illustrate purpose.

  • PDF

Estimation of Product Reliability with Incomplete Field Warranty Data (불완전한 사용현장 보증 데이터를 이용한 제품 신뢰도 추정)

  • Lim, Tae-Jin
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.28 no.4
    • /
    • pp.368-378
    • /
    • 2002
  • As more companies are equipped with data aquisition systems for their products, huge amount of field warranty data has been accumulated. We focus on the case when the field data for a given product comprise with the number of sales and the number of the first failures for each period. The number of censored items and their ages are assumed to be given. This type of data are incomplete in the sense that the age of a failed item is unknown. We construct a model for this type of data and propose an algorithm for nonparametric maximum likelihood estimation of the product reliability. Unlike the nonhomogeneous Poisson process(NHPP) model, our method can handle the data with censored items as well as those with small population. A few examples are investigated to characterize our model, and a real field warranty data set is analyzed by the method.

A Study on Performance Warranty Criteria for Expressway Jointed Concrete Pavements (고속국도 줄눈 콘크리트 포장 성능보증 기준 연구)

  • Yeo, Hyun-Dong;Ahn, Deok-Soon;Suh, Young-Chan;Jeong, Jin-Hoon
    • International Journal of Highway Engineering
    • /
    • v.13 no.3
    • /
    • pp.65-73
    • /
    • 2011
  • Recently, researches to introduce the performance warranty contract are in progress for quality improvement of road pavements. The performance warranty contract is a type of contract in which contractors guarantee to maintain certain level of performance during a period from completion of construction. The contract use in Europe and the U.S is being increased because it has been known to contribute to improvement of structure quality, reduction of life cycle cost, development of construction techniques, and etc. The research on performance indicators, threshold values, and warranty durations is essential to effectively introduce the contract in Korea. In this study, literatures on the performance warranty contract for concrete pavements of the Minnesota, Indiana, and Florida of the U.S. were reviewed. Major distresses influencing the pavement performance were investigated and analyzed in the jointed concrete pavement sections of 21 Korean expressway routes to be compared to the performance indicators, threshold values, and warranty durations of the states. More accurate comparison is expected by investigation in planned sections for a long time.

Performance Indicator and Threshold Value of National Highway Jointed Concrete Pavements (일반국도 줄눈 콘크리트 포장의 성능인자와 임계한도)

  • Yeo, Hyun Dong;Seo, Youngguk;Suh, Young Chan;Jeong, Jin Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.3D
    • /
    • pp.279-288
    • /
    • 2010
  • Recently, researches on the performance warranty contracting has been going on to improve construction quality in road pavement area. The performance warranty contracting gives construction companies opportunity to select materials and methods freely while asks them to maintain a certain level of performance during a given period. To introduce the performance warranty contracting in Korea, lots of research results on performance indicator and threshold value of asphalt pavement have been made to be included in the warranty specification. However, research effort on the performance indicator and threshold value of concrete pavement which is commonly constructed in expressway and national highway has not been enough. In this study, the warranty duration, performance indicator, and threshold value of the concrete pavement were investigated by reviewing literatures on cases of the performance warranty contracting in European countries and states of the US. Major distresses influencing the performance of jointed concrete pavement were investigated and analyzed to be compared to the warranty duration, performance indicator, and threshold value of foreign countries.

Analysis of Defect Risk by Work Types based on Warranty Liability Period in Apartments (공동주택 하자보수보증기간에 기초한 공종별 하자위험 분석)

  • Kim, Sang-Hyeon;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.34-42
    • /
    • 2018
  • Apartment is a typical type of housing preferred by the majority of people. However, and defect disputes occur because various defects such as cracks, subsidence, breakage, water leakage, dew condensation and dropout are confirmed with numerous structures and finishing materials. From this point of view, this paper analyzes defect frequency and costs of each warranty period by work types, and estimates defect risks by using defect dispute cases. It examined about 5,337 defect items for 32 apartment over ten years old. In this paper, there are 10 types of work types and the warranty liability period is divided into 6 categories. Based on these categories, defect frequency and costs are investigated, and finally defect risk of the warranty liability period by work types confirmed. As a result of this analysis, it was found that defect risk in RC and finishing work is very high. Especially the RC work revealed that there is a high risk of trying from the third year onwards and it was found that the defect risk up to the second year is high in the finishing work. Due to aging of RC structure, the defect risk gradually increases, and finishing work initially cause defect disputes because of the housing environment.

A Bayesian approach to maintenance strategy for non-renewing free replacement-repair warranty

  • Jung, K.M.
    • International Journal of Reliability and Applications
    • /
    • v.12 no.1
    • /
    • pp.41-48
    • /
    • 2011
  • This paper considers the maintenance model suggested by Jung and Park (2010) to adopt the Bayesian approach and obtain an optimal replacement policy following the expiration of NFRRW. As the criteria to determine the optimal maintenance period, we use the expected cost during the life cycle of the system. When the failure times are assumed to follow a Weibull distribution with unknown parameters, we propose an optimal maintenance policy based on the Bayesian approach. Also, we describe the revision of uncertainty about parameters in the light of data observed. Some numerical examples are presented for illustrative purpose.

  • PDF

A Study on Performance Criteria of Asphalt Pavements for Development of Performance-based Warranty Specification (성능보증 시방서 개발을 위한 아스팔트 포장 성능기준 연구)

  • Yeo, Hyun Dong;Nam, Jeong Hee;Suh, Young Chan;Jeong, Jin Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6D
    • /
    • pp.793-801
    • /
    • 2011
  • Existing specifications of road pavement require contractors to meet only materials and construction conditions regardless of pavement life. There are limitation of developing road pavement technology and possibility causing dispute between ordering organization and contractor with this type of specification. Research efforts to introduce performance warranty contracting are in progress in the field of road pavement to improve the problems. The performance warranty contracting gives the contractors opportunity to select materials and construction methods as they like. But they should satisfy a certain level of performance during a given period. The performance indicator and threshold value of pavement which are main elements of the warranty specification should be defined first to introduce the performance warranty contracting successfully. In this study, the performance indicator, threshold value, and warranty duration of asphalt pavement were investigated by reviewing literatures on performance warranty contracting of some states of the US. Major distresses influencing the performance of the asphalt pavement were investigated at 24 national expressway lines and national highway lines in 16 regions, and the data were analyzed to be compared to the cases of the US. Development of rational performance warranty specification for domestic asphalt pavement is expected based on the research results.

An Opportunity-based Age Replacement Policy with Warranty Analysed by Using TTT-Transforms

  • Iskandar, Bermawi P.;Klefsjo, Bengt;Sandoh, Hiroaki
    • International Journal of Reliability and Applications
    • /
    • v.1 no.1
    • /
    • pp.27-38
    • /
    • 2000
  • In a recent paper Iskandar & Sandoh (1999) studied an opportunity-based age replacement policy for a system which has a warranty period (0,S]. When the system fails at age x $\leq$ S a minimal repair is performed. If an opportunity occurs to the system at age x, S $\leq$ x $\leq$ T, we take the opportunity with probability p to preventively replace the system, while we conduct a corrective .replacement when its fails in (S,T). Finally, if its age reaches T, we perform a preventive replacement, Under this policy the design variable is T. For the case when opportunities occur according to a homogeneous Poisson process, the long-run average cost of this policy was formulated and studied analytically by Iskandar & Sandoh (1999). The same problem is here analysed by using a graphical technique based on scaled TTT-transforms. This technique gives, among other things, excellent possibilities for different types of sensitivity analysis. We also extend the discussion to the situation when we have to estimate T based on times to failure.

  • PDF