• 제목/요약/키워드: WASP Model

검색결과 97건 처리시간 0.025초

동물플랑크톤 군집자료를 이용한 낙동강 물금지점의 수질모의 (Water Quality Simulation at Mulgeum of the Nakdong River using Zooplankton Community Data)

  • 이상호;최정민;정광석
    • 한국물환경학회지
    • /
    • 제25권6호
    • /
    • pp.832-839
    • /
    • 2009
  • Since construction of the estuarine barrage at the mouth of the Nakdong River, eutrophication and increased abundance of phytoplankton have occurred mainly due to the increased retention time in the reach. However, during the spring, there is a decrease in chlorophyll-a, as a result of an increase in zooplankton number, which preys upon phytoplankton and affects the value of chlorophyll-a. In order to emphasize the importance of zooplankton data in water quality simulation, zooplankton community data were used to simulate water quality and eutrophication at Mulgeum located in 27 km upstream from the barrage. WASP 7.2 was used as the water quality model for the river, using a monthly data set from 2003 to 2005 for model calibration and verification. The results showed that chlorophyll-a, DO, and total nitrogen in the river were simulated well during the verification period. The results of water quality simulation using zooplankton community data in the model were better than those with phytoplankton death rate, in terms of the absolute value of percent bias, root mean square error, and Nash-Sutcliffe efficiency. Those results indicate the use of zooplankton data provides more accurate simulation results for chlorophyll-a and eutrophication.

합류식 하수관거 월류수 유입 기간 동안에 나타나는 청계천 수질 변화 모델 연구 (A Water Quality Modeling Study of Chunggye Stream during Combined Sewer OverFlow Period)

  • 이혜숙;박석순
    • 대한환경공학회지
    • /
    • 제27권12호
    • /
    • pp.1340-1346
    • /
    • 2005
  • 소수계 물관리 진단시스템, CREEK-1을 이용하여 합류식 하수관거 월류수 발생시 청계천에서 나타나는 수질변화에 관한 모델 연구를 수행하였다. CREEK-1은 지리정보시스템, 데이터베이스, 경관생태모델(FRAGSTATS), 유역모델(SWMM), 수질모델(WASP5), 그리고 컴퓨터 그래픽으로 구성되어있다. 본 연구에서는 강우시 청계천의 수질변화를 시뮬레이션하기 위해 유역모델과 수질모델이 주로 사용되었다. 유역모델에서 청계천 전체 유역이 18개의 소유역으로, 수질모델에서 대상 하천 구간은 11개의 구획으로 나누어져 모델이 구성되었다. 유역모델은 강우시 현장에서 관측된 BOD, 총질소, 총인 그리고 유량 자료로 타당성이 검토되었으며, 그 결과 모든 항목에서 모델 예측같은 관측값과 비교적 적절한 일치를 보였다. 연구 결과는 하천의 수질이 강우량과 강우 시작 후 경과 시간에 따라 변화가 일어나고 있음을 보여주었다. 강우 초기에는 유역의 초기 세척수와 CSO에서 차지하는 하수 비율이 높기 때문에 수질이 크게 악화되었으나 유출 수량이 증가함에 따라 희석효과에 의해 수질이 개선되는 것으로 나타났다.

배출권 거래제를 고려한 전원개발계획에 관한 연구 (A Study on the Power Expansion Planning Model Considering the Emission Trading)

  • 안중환;김발호
    • 전기학회논문지
    • /
    • 제61권7호
    • /
    • pp.957-965
    • /
    • 2012
  • Korean government has been preparing the introduction of Emission Trading as part of the framework convention on Climate Change as a relief of negative downstream effect over electricity industry. This paper develops a mathematical model amenable to analyzing the economic impact of introduced emission trading system on the national generation expansion planning. The developed model was also employed with a case study to verify its applicability.

금강호물의 새만금호 도입에 따른 금강호 수질변화 분석 (Estimation of Water Quality of Geumgang Lake by Diversion of Geumgang Lake Flow into Saemangeum Lake)

  • 엄명철;이재면
    • 한국물환경학회지
    • /
    • 제22권6호
    • /
    • pp.1045-1051
    • /
    • 2006
  • Geumgang canal is planned to connect Geumgang lake with Saemangeum lake to accelerate desalinization and dilute polluted water to improve water quality in Saemangeum lake. The purpose of this study is to evaluate the impact of water quality on Geumgang lake by diversion of its lake flow to Saemangeum lake. WASP5 model was used to estimate water quality of Geumgang lake. Model calibration and verification were done for water quality data for 2001 and 2002. Water quality concentrations in Geumgang lake were simulated for 4 scenarios, which were considered whether the Geumgang canal is built or not. As a result of simulations, there was little impact on water quality in Geumgang lake, though a little of the Geumgang lake flow diverted to Saemangeum lake. As the Geumgang canal is planned to divert the Geumgang water flow which were discharged into the sea through sluice gates when canal is not built, it is thought that there will be little change by diversion of water flow.

목장지대 주변에 위치한 도암호의 수질관리 (Water quality management of Doam lake around the pasture area)

  • 조재현
    • 상하수도학회지
    • /
    • 제12권3호
    • /
    • pp.41-47
    • /
    • 1998
  • Doam Lake is located around the pasture area and Yongpyung Resort. Because of the waste load of domestic animals, nutrient concentration of the stream is high. In this study, waste load of Doam Lake watershed is calculated, and QUAL2E model is applied to the upper part of the Songcheon to calculate the input boundary concentration of Doam Lake. And WASP5 model is applied for the water quality modeling of Doam lake. The results indicate that advanced treatment of domestic animal wastes is necessary for the lake water quality management.

  • PDF

여천천 하구에 설치된 침사지내 퇴적토의 수질영향분석 (Impact of Grit Chamber Deposits on Water Quality at the Mouth of Yeocheoncheon, Ulsan)

  • 이상현;조홍제
    • 한국환경과학회지
    • /
    • 제25권8호
    • /
    • pp.1191-1206
    • /
    • 2016
  • Transported deposit was accumulated in a grit chamber built at the mouth of Yeocheoncheon in 1987 with the intention of blocking the influx of sediment into the Ulsan-harbor. This study attempted to analyze the effects of the transported deposit on the water quality at Yeocheoncheon. Only one episode of dredging has been performed in the approximately 25 years since the grit chamber were built, leading to the formation of stagnant water in the grit chamber due to a large amount of transported deposit. The deposit has a relatively high organic content, in the range of 11.7-25.9% (mean 18.3%). It appears that the main reason for the upstream transport of water pollution from the mouth of the Yeocheoncheon is the tides. The effects of organic content and stagnant water on water quality were analyzed using WASP. Moreover, the changes in water quality arising due to the removal of the grit chamber were analyzed. Results indicated that BOD improved by 18.8-100%, while T-P improved by 90.0-617.4%, between the grit chamber and Hanbi-Gyo, which is located 1.3 km away from the grit chamber.

유역-호소 통합수질예측 기법을 이용한 물왕저수지 수질개선효과 분석 (A Study on Mulwang Reservoir Water Quality Improvement Effect Using Watershed-Reservoir Integrated Prediction)

  • 오희상;이한필
    • 한국농공학회논문집
    • /
    • 제59권3호
    • /
    • pp.51-62
    • /
    • 2017
  • Since living environment has improved, waterfront space using and clear water demand have increased. Ministry of Environment (ME) designated polluted reservoir (worse than 4th grade) as a priority management reservoir to improve water quality (better than 3rd grade) accordingly. Minstry of Agriculture, Food and Rural Affairs (MAFRA) aims reservoir water quality 4th not 3rd grade. And water quality of agricultural reservoirs was not a great interest. For this reason, there are very few water quality monitoring data. However after designating as a priority management reservoir, reservoir manager should start water quality and flow monitoring of reservoirs and inflow streams. This process makes it possible setting complex model to accurate prediction of reservoir water quality and volume. Mulwang reservoir designated as a priority management reservoir in September 2014. In this study, BASINS/WinHSPF and EFDC-WASP were used to predict effect of water quality improvement countermeasures in Mulwang reservoir. To improve water quality of Mulwang reservoir, Siheung-si and Korea Rural Community Corporation (KRCC) established water quality improvement countermeasures. However result of simulation adapting these countermeasures cannot achieve 3rd grade. So 4 additional scenarios were adapted and the result satisfied 3rd grade. This study could help to establish water quality improvement countermeasure by using complex modeling.

금강 중하류에서의 수질모의에 관한 연구 (A Study on the Water Quality Simulation in the Midstream and Downstream of Geum-River)

  • 신재기;임창수
    • 한국수자원학회논문집
    • /
    • 제33권2호
    • /
    • pp.145-157
    • /
    • 2000
  • 본 연구에서는 금강 대청댐하류의 본류구간에서 갈수시간에 대해서 WASP5모형 중에서 수질모의 부분인 EUTRO5모형과 1차원 정상류 수리모형인 HEC-2모형을 연계한 수질모형을 이용하여 대청조정지댐으로부터 강경수위표 지점까지 수질의 변화를 모의하였다. 수질 및 유량자료의 수집을 위하여 대청댐으로부터 금강하류에 위치한 주요 수위표지점에서 1998년 12월, 1999년 1월과 3월의 3회에 걸쳐 관측하였다. 수질모의모형은 1999년 1월 자료를 이용하여 보정되어지고, 1998년 12월자료와 1999년 3월자료를 이용하여 검증되어졌다. 모형에 의해서 모의된 수질변수들의 거리에 따른 변화는 1999년 3월자료를 이용하여 모의된 chlorophyll-a, BOD5, NH3-N, PO4-P와 같은 수질변수를 제외하고는 관측된 수질변수값과 거의 일치하였다. 또한 NH3-N과 PO4-P가 증가 혹은 감소되어 갑천과 미호천으로부터 금강본류로 유입된다고 가정하는 경우에 금강본류에서의 chlorophyII-a의 농도를 모의하였다. 모의한 바에 의하면 갑천과 미호천에서 NH3-N과 PO4-P가 70% 감소되어져 금강본류로 유입된다고 가정하는 경우를 제외하고는 거의 미미한 chlorophyII-a 농도변화율을 보였다.

  • PDF

환경용량을 고려한 유역 오염부하삭감량 추정 연구 (An Estimation Study of Watershed Pollution Load Reduction Using Environmental Capacity)

  • 정재성;박영기;김종국
    • 대한환경공학회지
    • /
    • 제28권12호
    • /
    • pp.1265-1273
    • /
    • 2006
  • 용담댐 저수지에 대하여 목표수질 설정과 오염물질 부하량 추정 및 유량분석을 실시하여 수질의 변화과정을 모의함으로써 환경용량과 오염부하삭감량을 추정하였다. 목표수질은 상수원수 $1{\sim}2$등급, COD $1.0{\sim}3.0$ mg/L와 TP $0.01{\sim}0.03$ mg/L로 설정하고, 용담댐 저수지의 수질모형을 42개 소구획을 가진 WASP5로 구성하고, 보정하여 측정치와 계산치의 상관계수는 BOD 0.73, $PO_4-P$ 0.98이었다. 목표수질 COD 2.0 mg/L와 TP 0.02 mg/L에 대한 환경용량은 연구조건에 따라 BOD $131,880{\sim}4,694$ kg/일, TP $7,855{\sim}167$ kg/일이고, 각 경우의 오염부하 삭감률은 BOD $51{\sim}62%$, TP $47{\sim}67%$로 나타났다. 환경용량은 기존연구보다 작게 추정되었고 삭감부하율은 기존결과들의 중간에 해당하였다. 상수원수 $1{\sim}2$등급의 수질을 연중 달성할 오염부하 삭감률은 기존 연구조건에서 BOD $72{\sim}16%$, TP $78{\sim}36%$이고, 신규 연구조건에서 BOD $81{\sim}44%$, TP $84{\sim}52%$로 나타났다. 기존연구의 삭감량과 비교하면 BOD는 가장 적고 TP는 4개 중 2번째로 적었다. 목표삭감부하량의 소유역별 배분에서 TP는 취수탑 구획에 대한 근접도의 영향이 크게 나타났으나 COD는 별다른 차이가 없었다.

의사결정지원기법을 이용한 농촌유역 통합 수질관리모형의 개발 (Development of Integrated Water Quality Management Model for Rural Basins using Decision Support System.)

  • 양영민
    • 한국농공학회지
    • /
    • 제42권5호
    • /
    • pp.103-113
    • /
    • 2000
  • A decision support system DSS-WQMRA (Decision Support System-Water Quality Management in Rural Area) was developed to help regional planners for the water quality management in a rural basin. The integrated model DSS-WQMRA, written in JAVA, includes four subsystems such as a GIS, a database, water quality simulation models and a decision model. In the system, the GIS deals with landuse and the location of pollutant sources. The database manages each data and supplies input data for various water quality simulation models. the water quality simulation model is composed of the GWLF( Generalized Watershed Loading Function), PCLM(Pollutant Loading Calculation Module) and the WASP5 model. The decision model based on mixed integer programming is designed to determine optimal costs and thus allow the selection of managemental practices to meet the water quality criteria. The methodology was tested with an example application in the Bokha River Basin, Kyunggi Province in Korea. It was proved that the integrated model DSS-WQMRA could be very useful for water quality management including the non-point source pollution in rural areas.

  • PDF