• Title/Summary/Keyword: W project

Search Result 411, Processing Time 0.025 seconds

S/W 개발 프로젝트 관리를 위한 상황 모형 연구 (A Study on the Contingency Model for S/W Development Project Management)

  • 홍명헌;김정곤;김신곤
    • Journal of Information Technology Applications and Management
    • /
    • 제13권2호
    • /
    • pp.145-162
    • /
    • 2006
  • Despite the careful attention paid by managers and researchers to the effective administration of the S/W Development Project, there are cases where the project goes over-budget or misses deadlines. Existing research blames these problems on task complexity or mismanagement. In order to verify the results that varied according to the fitness between the Task Characteristics and the Project Management Types, a contingency model was employed. The verification of the contingency model demonstrated that the greater the task complexity, the greater the effectiveness of the project coordination, and the lesser the task complexity, the greater the effectiveness of project control. This research is theoretically important in that it develops a composite model to verify the relation between the three factors of Task Characteristics, Project Management Types, and Project Performance that compose the S/W Development Project.

  • PDF

Challenges in Structural Design of W-Project

  • Kim, Jong Soo
    • 국제초고층학회논문집
    • /
    • 제3권3호
    • /
    • pp.199-204
    • /
    • 2014
  • W-Project is 70-story mixed-use residential building complex project in Busan, the second biggest city in South Korea. As it is a high rise building complex located at the coast, the residents have great ocean view from the height. Though, there were many difficult challenges to be solved to secure structural safety and meet the serviceability requirements. As it is located on the reclaimed land, securing the foundation bearing capacity on soft soil is the first issue to be solved for the stable structure. W-Project. Busan on the way usual track of typhoon, wind load on structure is also critical for structural safety and serviceability for occupants due to wind vibration. This paper will address process of lateral load resisting structural system of W-Project.

S/W개발자의 IT 프로젝트 참여 의도 연구: 조절초점에 따른 프로젝트 기술 최신성의 효과를 중심으로 (S/W Developer's IT Project Participation: Focusing on the Moderating Role of Regulatory Focus on the Effect of Technology Recency on Participation Intention)

  • 박요한;박도형
    • 지식경영연구
    • /
    • 제18권2호
    • /
    • pp.45-63
    • /
    • 2017
  • In the success of an IT project, the role of S/W developer in carrying out the project is critical and crucial. However, compared to its importance, there is only a few studies on the role of human resources in software engineering field, mainly focusing on technology. Based on regulatory focus theory, this study examines how the effect of technology recency on developer's intention to participate in the IT project changes depending on the regulatory focus of the software developer. As a result of the experiment, it was confirmed that there is a difference in the effect of technology recency on project participation intention according to the condition of developer's regulatory focus. This study is meaningful because it extends regulatory focus theory to software engineering field and made theoretical contribution to the research field of behavioral software engineering. In practical, it was possible to suggest a way to improve the intention of the developer to participate in the project, by understanding the software developer in the IT project, considering the software developer propensity and project characteristics.

EPC시스템에서 UI기반의 소프트웨어에 대한 고찰 (The study of EPC System S/W based on the UI)

  • 황성하;유선일;정진수
    • 시스템엔지니어링학술지
    • /
    • 제6권1호
    • /
    • pp.61-68
    • /
    • 2010
  • Generally EPC management system was simply management concept through the normal S/W. Our LNG Plant R&D Center wanted to the excellent management system from the S/W. So We developed the R&D management S/W and EPC management S/W Built in the Microsoft Project Server. Our system made to the customer Requirements. It was just User Interface protocol. But User Interface has more Weak position, because it makes from the MS Project Servers. Ms Projector server make easy to treat the project on the WBS. EPC parts mixed WBS and normally Ms SQL Database. It has very complicated Structures. Now We planed to make the general Database and Ms Project Server, It' means to the S/W Developer and Schedule Manager ability. We will successfully integrate R&D management system and EPC system and other softwares.

  • PDF

공공 S/W 분야에서 프로젝트 관리자의 역량이 성과에 미치는 영향 (The Effect of Project Managers' Competences on Performance in Public S/W)

  • 오민정;주형준;이민호
    • 산업경영시스템학회지
    • /
    • 제44권3호
    • /
    • pp.230-239
    • /
    • 2021
  • There is a growing interest in project management knowledge, project management information systems, and process improvement to systematically project execution in public sectors, achieve high performance and value, and increase the effectiveness of the overall industry. In particular, the software industry is a knowledge-intensive industry centered on professional manpower. This study examines the effect of the project managers' competences of regional SW promotion agencies on and project performance and the moderating effect of the level of project management maturity. We collected data using a questionnaire to the project managers of regional SW promotion agencies. In this study, a structural equation model was used to analyze the relationship between project managers' competences and performance. In addition, a multi-group structural equation model was used to analyze the moderating effect according to the high and low project maturity. As a result of the analysis, it was found that only contextual competence among the competences of the project manager had a positive effect on project performance. It was found that technical and behavioral competence did not have a positive effect on management and completion performance. It was found that the moderating effect according to the maturity of business management of local institutions was not significant.

일반농산어촌개발사업에 있어 농촌경관계획과 경관사업부문의 위상변화에 관한 연구 (Study on the Status Change in Rural Landscape Planning and Landscape Project in the General Agriculture Fishing Village Development Project)

  • 이수현;조동범
    • 농촌계획
    • /
    • 제25권4호
    • /
    • pp.119-128
    • /
    • 2019
  • Although the General Agricultural Fishing Village Development Project had a significant impact on the landscape formation and management in rural area, the rural landscape planning and project sectors was not stable by fluctuation variables. On the basic understanding the institutional status of rural landscape planning, some conclusions could be discussed as follows through the analysis of quantitative and qualitative changes and the background factors. The rural landscape plan lacked its own legal and institutional foundations, and the landscape project of the General Agricultural Fishing Village Development Project was mainly focused on the environment-improving H/W project for expanding the basic living infrastructures. In order to reflect the characteristics of the region and become independent rural landscape management, it is necessary to change the contents so that the S/W business such as the deepening landscape awareness and empowerment linked with improving the physical landscape. To this end, it is necessary to establish a foundation for the rural landscape planning system to have its own status, and it seems to seek to supplement with what is included S/W contents reflecting the context of higher level landscape planning. The landscape sector of the General Agricultural Fishing Village Development Project proved to be in the process of shrinking in both quantity and quality, despite the temporary expansion in the past. In addition, considering the distortion of the contents of landscape projects in rural sites, it seems that the rural landscape-related public project are now in a position to seek a new phase change beyond quantitative expansion. In particular, along with institutional improvements to secure the independent status of rural landscape planning that contributes to village community regeneration and social sustainability through the role of intermediary support organizations in landscape management activities. Through the integrated landscape plan, which is established in advance and led by the residents in the early stages, there is a need to change the direction to enhance meaning of the landscape planning goes beyond the facility design or space improvement.

2500kW 용해설비 시운전 결과 및 5000kW 용해로용 인버터 설계 (The Result of 2500kW Induction Smelting System Trial Running and Basic Design of 5000kW Induction Smelting System)

  • 유효열;심은용;정대환;김상중;강재봉;강호현;김왕래
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2006년도 전력전자학술대회 논문집
    • /
    • pp.288-291
    • /
    • 2006
  • The authors, R&D member of DAWONSYS and Soongsil University, are developing 5000kW smelting inverter system by 2007 under the sponsor from Korea Energy Management Corporation. As a part of the project, 2500kW inverter system has developed in 2005[6], and installed in real production site, and has been running for 7 months successfully. This report deals with the test result of 2500kW smelting inverter system and design for 5000kW smelting inverter system which is final target of this project.

  • PDF

그린홈 보급확대를 위한 건물용 연료전지 보조기기 국산화 기술개발 (Technology development on localization of BOP components for 1kW stationary fuel cell systems to promote green-home dissemination project)

  • 김민석;이선호;전희권;배준강
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2010년도 춘계학술대회 초록집
    • /
    • pp.128.2-128.2
    • /
    • 2010
  • For stationary 1kW-class fuel cell systems to be used widely, it is essential to achieve dramatic improvements in system durability as well as cost reduction. In order to address this engineering challenge, it is important to develop innovative technologies associated with BOP components. According to this background, in 2009, the Korean Government and "Korea Institute of Energy Technology Evaluation and Planning(KETEP)" launched into the strategic development project of BOP technology for practical applications and commercializations of stationary fuel cell systems, named "Technology Development on Cost Reduction of BOP Components for 1kW Stationary Fuel Cell Systems to Promote Green-Home Dissemination Project". The objectives of this project are to develop fundamental technologies to meet these requirements, and to improve the performance and functionality of BOP components with reasonable price. The project consortium consists of Korea's leading fuel cell system manufacturers, BOP component manufacturers which technologically specialized, and several research institutions. This paper is to provide a summary of the project, as well as the achievements made through the 1st period of the project(2009~2010). Several prototypes of BOPs - Cathode air blowers, burner air blowers, preferential oxidation air blowers, fuel blowers, cooling water pumps, reformer water pumps, heat recovery pumps, mass flow meters, valves and power conditioning systems - had been developed through this project in 2010. As results of this project, it is expected that a technological breakthrough of these BOP components will result in a substantial system cost reduction.

  • PDF

The HPRF system for PEFP 20MeV proton linac

  • Seol, K.T.;Kwon, H.J.;Song, Y.G.;Park, M.Y.;Cho, Y.S.
    • 한국원자력학회:학술대회논문집
    • /
    • 한국원자력학회 2004년도 추계학술발표회 발표논문집
    • /
    • pp.683-684
    • /
    • 2004
  • The RF system for PEFP 20MeV proton linear accelerator is described. The RF system for 3MeV RFQ was already installed and operated to drive the RFQ. The klystron was tested up to 600kW itself and operated up to 350kW routinely. The HPRF dummy load was stabilized with the change of the coolant. Preparation of 20MeV DTL HPRF test has been completed. LCP and PLC system for klystron power supply was already prepared. Voltage fluctuation was measured during klystron test. Voltage control feedback loop seems to be re-adjusted.

  • PDF

Status and test results of the HPRF system for PEFP 20MeV linear accelerator

  • Seol, K.T.;Kwon, H.J.;Kim, H.S.;Song, Y.G.;Cho, Y.S.
    • 한국원자력학회:학술대회논문집
    • /
    • 한국원자력학회 2005년도 추계학술발표회
    • /
    • pp.915-916
    • /
    • 2005
  • The high power RF system for the PEFP 20MeV proton accelerator composed of the 3MeV RFQ and the 20MeV DTL has been installed. The klystron for the RFQ was tested up to 600kW and operated routinely to drive the RFQ in a pulse mode operation. The klystron for the DTL which consists of 4 tanks was tested up to 800kW in pulse mode operation. The pulse width and repetition rate was 50${\mu}s$ and 1Hz respectively. The high power RF system has been operated to drive each accelerating structure and will be used to accelerate 20MeV proton beam.

  • PDF