• Title/Summary/Keyword: Visualization of prediction functions

Search Result 5, Processing Time 0.017 seconds

Simple Graphs for Complex Prediction Functions

  • Huh, Myung-Hoe;Lee, Yong-Goo
    • Communications for Statistical Applications and Methods
    • /
    • v.15 no.3
    • /
    • pp.343-351
    • /
    • 2008
  • By supervised learning with p predictors, we frequently obtain a prediction function of the form $y\;=\;f(x_1,...,x_p)$. When $p\;{\geq}\;3$, it is not easy to understand the inner structure of f, except for the case the function is formulated as additive. In this study, we propose to use p simple graphs for visual understanding of complex prediction functions produced by several supervised learning engines such as LOESS, neural networks, support vector machines and random forests.

Visualizing Multi-Variable Prediction Functions by Segmented k-CPG's

  • Huh, Myung-Hoe
    • Communications for Statistical Applications and Methods
    • /
    • v.16 no.1
    • /
    • pp.185-193
    • /
    • 2009
  • Machine learning methods such as support vector machines and random forests yield nonparametric prediction functions of the form y = $f(x_1,{\ldots},x_p)$. As a sequel to the previous article (Huh and Lee, 2008) for visualizing nonparametric functions, I propose more sensible graphs for visualizing y = $f(x_1,{\ldots},x_p)$ herein which has two clear advantages over the previous simple graphs. New graphs will show a small number of prototype curves of $f(x_1,{\ldots},x_{j-1},x_j,x_{j+1}{\ldots},x_p)$, revealing statistically plausible portion over the interval of $x_j$ which changes with ($x_1,{\ldots},x_{j-1},x_{j+1},{\ldots},x_p$). To complement the visual display, matching importance measures for each of p predictor variables are produced. The proposed graphs and importance measures are validated in simulated settings and demonstrated for an environmental study.

Data analysis by Integrating statistics and visualization: Visual verification for the prediction model (통계와 시각화를 결합한 데이터 분석: 예측모형 대한 시각화 검증)

  • Mun, Seong Min;Lee, Kyung Won
    • Design Convergence Study
    • /
    • v.15 no.6
    • /
    • pp.195-214
    • /
    • 2016
  • Predictive analysis is based on a probabilistic learning algorithm called pattern recognition or machine learning. Therefore, if users want to extract more information from the data, they are required high statistical knowledge. In addition, it is difficult to find out data pattern and characteristics of the data. This study conducted statistical data analyses and visual data analyses to supplement prediction analysis's weakness. Through this study, we could find some implications that haven't been found in the previous studies. First, we could find data pattern when adjust data selection according as splitting criteria for the decision tree method. Second, we could find what type of data included in the final prediction model. We found some implications that haven't been found in the previous studies from the results of statistical and visual analyses. In statistical analysis we found relation among the multivariable and deducted prediction model to predict high box office performance. In visualization analysis we proposed visual analysis method with various interactive functions. Finally through this study we verified final prediction model and suggested analysis method extract variety of information from the data.

Development of a Voltage Sag Assessment Program Considering Generator Scheduling and Voltage Tolerance (발전기 스케줄링과 부하 전압민감도를 고려한 순간전압강하 평가 프로그램 개발)

  • Park, Chang-Hyun
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.23 no.4
    • /
    • pp.92-100
    • /
    • 2009
  • This paper presents a voltage sag assessment program. The program provides various functions for stochastic assessment of voltage sags such as short-circuit analysis, the determination of the area of vulnerability and the calculation of expected sag frequency(ESF). Effective data visualization functions based on computer graphics and animation were also implemented in the developed program. In this paper, the concept of voltage sag assessment and the assessment method considering generator scheduling and time-varying fault rates are presented. The influence of generator scheduling and time-varying fault rates on voltage sag prediction is also described by performing case studies using the developed program.

Development of Integrated Management System Based on GIS on Soft Ground (GIS 기법을 이용한 연약 지반 시공 관리 시스템의 개발)

  • Chun, Sung-Ho;Woo, Sang-Inn;Chung, Choong-Ki;Choi, In-Gul
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.7
    • /
    • pp.37-46
    • /
    • 2007
  • In the practice of preloading method for soft ground improvement, field engineers need information of ground properties, construction works and field monitoring on ground behaviors of the site. So, integrating all these informations into one database can provide more efficient way for managing and utilizing the data for construction management. In this study, integrated system for construction management of ground improvement sites under preloading is developed. The developed system consists of database (DB) and application program. The database contains all collected data in a construction site and processed data in the system with their geographic information. All informations in the database are standardized from the result of data characterization. Application program performs various functions on managing and utilizing information in the database; pre- and post- data processing with graphic visualization of output, spatial data interpolation, and prediction of ground behavior using field measuring data. And by providing integrating informations and predictions over entire project area with comprehensible visual displays, the applicability and effectiveness of the developed system for construction management were confirmed.