• Title/Summary/Keyword: Vehicle/Track interaction analysis

Search Result 50, Processing Time 0.022 seconds

Development of a Numerical Analysis Method of Train/Track Interaction for Evaluation of Dynamic Track Design Load (궤도 설계 동하중 산정을 위한 차량/궤도 상호작용 해석기법 개발)

  • 양신추
    • Proceedings of the KSR Conference
    • /
    • 2002.10b
    • /
    • pp.1094-1099
    • /
    • 2002
  • In this paper, a numerical method for vehicle-track interaction analysis is developed to evaluate vertical dynamic force subjected to rail surface. A vehicle is modelled by lumped masses system and track by multi layered continuous beam system. The equation of motion of vehicle and track interaction system is derived by considering compatibility condition at the contact points between wheel and rail. The input vibration source is given by the empirical formula of power spectral density of track irregularity, which is suggested by FRA. Using this method, dynamic impact factors with the train speed are evaluated.

  • PDF

A study on the Settlement of Ballasted Track according to Various Rail-Pad Stiffness (레일패드의 강성이 자갈궤도 침하에 미치는 영향 연구)

  • Choi, Jin-Yu;Kim, Eun;Hwang, Man-Ho;Choi, Su-Ik
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.249-255
    • /
    • 2010
  • Ballasted track is under the circumstance of repetition of deterioration and recovery. Track deterioration is presented as track irregularity or settlement, and dynamic force subjected to track is one of major cause of the deterioration. The dynamic force is determined from the dynamic interaction between track and vehicle. Rail-pad stiffness is one of the factor affects track dynamic property. In this study, the relationship between rail-pad stiffness and track settlement was investigated. Dynamic forces according to various rail-pad stiffness was obtained from the dynamic vehicle-track interaction analysis using DARTS-NL. Track settlement was calculated by substitution the dynamic forces into various formulas for track settlement. From the result of analysis, it was known that the track settlement is increased about 6% when the rail-pad stiffness rise about twice. And this result leads that there is only a little relationship between rail-pad stiffness and track settlement.

  • PDF

Vehicle/track dynamic interaction considering developed railway substructure models

  • Mosayebi, Seyed-Ali;Zakeri, Jabbar-Ali;Esmaeili, Morteza
    • Structural Engineering and Mechanics
    • /
    • v.61 no.6
    • /
    • pp.775-784
    • /
    • 2017
  • This study is devoted to developing many new substructure models for ballasted railway track by using the pyramid model philosophy. As the effect of railway embankment has been less considered in the previous studies in the field of vehicle/track interaction, so the present study develops the pyramid models in the presence of railway embankment and implements them in vehicle/track interaction dynamic analyses. Considering a moving car body as multi bodies with 10 degrees of freedom and the ballasted track including rail, sleeper, ballast, subgrade and embankment, two categories of numerical analyses are performed by considering the new substructure systems including type A (initiation of stress overlap areas in adjacent sleepers from the ballast layer) or type B (initiation of stress overlap areas in adjacent sleepers from the subgrade layer). A comprehensive sensitivity analyses are performed on effective parameters such as ballast height, sleepers spacing and sleeper width. The results indicate that the stiffness of subgrade, embankment and foundation increased by increasing the ballast height. Also, by increasing the ballast height, rail and ballast vertical displacement decreased.

Dynamic Interaction Analysis of Tilting Train and Curved Track (틸팅열차 주행시 곡선부 궤도에서의 동적상호작용)

  • Chung, Keun-Young;Koh, Tae-Hoon
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.2
    • /
    • pp.162-171
    • /
    • 2012
  • In this study, a new dynamic interaction analysis method for tilting trains and curved track is presented. Three dimensional lumped parameter vehicle elements are used to model tilting train, and the proposed analysis technique can simulate driving direction change of vehicle, the effect of track cant, wheel-rail contact angle, and tilting angle of tilting trains, etc. The proposed method passed several basic verification tests, and it is expected that the suggested method is applicable for practical problems.

A Study of Dynamic Analysis of a Tracked Vehicle for Mining on Deep-Sea Bed (심해저 무한궤도식 채광차량의 동적 해석에 관한 연구)

  • Han, Hyung-Seok;Hong, Sub
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.20 no.6
    • /
    • pp.178-188
    • /
    • 2003
  • A study on the dynamic analysis of a tracked vehicle for mining on deep-sea bed with very soft soil is presented. An equation for the interaction between track and soft soil is employed to develop a track/soil interaction module called TVAS. The vehicle is modeled as a multi-body dynamic system using a multi-body dynamic analysis program. The developed module is incorporated into the multi-body dynamic analysis program with a user subroutine. The dynamic behavior and design of the mining vehicle on deep-sea bed is investigated.

The Fatigue Life Evaluation of Rail on the Concrete Track of High Speed Railway by Analysis of the Vehicle/Track Interaction (차량/궤도 상호작용해석을 통한 고속철도 콘크리트궤도 레일의 피로수명 예측)

  • Lim, Hyoung-Jun;Sung, Deok-Yong;Park, Yong-Gul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.6D
    • /
    • pp.663-671
    • /
    • 2012
  • The demand of CWR is rapidly increasing because of the adaptation of concrete track, the need for rapid and comfortable ride, and the reduction of maintenance cost. Because of short applying period of the concrete track, there is not a case of CWR fracture in Korea caused by repeated load of the train, which makes it difficult to calculate replacement period of rail based on rail fatigue life using an actual field data. This study thus inspected the bending stress at rail bottom through analyzing the vehicle/track interaction, performed multiple regression analysis on the data, deducted the bending stress prediction equations by the speed and the surface irregularity. Finally, the fatigue life of CWR on the concrete track was predicted based on the prediction equations for bending stress at rail bottom.

Additional Axial Stress of CWR Track on the Bridge according to the Variation of Design Vehicle Load (설계차량하중 변화에 따른 교량상 장대레일 궤도의 부가축응력)

  • Yun, Kyung-Min;Jeon, Byeong-Heun;Choi, Shin-Hyung;Lim, Nam-Hyou
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.1
    • /
    • pp.807-813
    • /
    • 2015
  • The CWR(Continuous Welded Rail) on a bridge shows complex structural behavior compared to those on the roadbed. The influence factors on the track-bridge interaction are the variation of temperature and vehicle load. The analysis methods for track-bridge interaction, material property, modeling method, loads and combination method are indicated in the domestic railway design principle, KR C-08080. The vehicle load in KR C-08080 was changed in 2014. In this study, to evaluate the effect of the changed vehicle load on the track-bridge interaction, the track-bridge interaction analyses were performed for 22 bridges by using finite element method.

Optimal Design of Reinforced Rail over Connection Section of Bridge and Embankment (교량/토공 접속구간 보강레일의 최적설계)

  • Yang, S.C.;Kang, Y.S.;Kim, E.
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.256-263
    • /
    • 2002
  • This paper deal with optimal design of reinforced track as a track reinforcing method for transition area of track support stiffness in transition area between bridge and earthwork. When vehicle passes through transition area, dynamic properties between vehicle and track are studied by the analysis of vehicle-train interaction for the each case when reinforced tracks are used or not. furthermore, optimum decision of type and length of track are made based on the performance adapting variable parameters : support stiffness of track for bridge and earthwork, heading direction of vehicle and type and length of track.

  • PDF

Train/Track/Bridge Interaction Analysis Using 2-Dimensional Articulated High-Speed Train Model (2차원 관절형 고속열차 모델을 이용한 차량/궤도/교량 상호작용해석)

  • 김만철;양신추;이종득
    • Proceedings of the KSR Conference
    • /
    • 1999.05a
    • /
    • pp.414-421
    • /
    • 1999
  • In this paper, the simplified method for 2-dimensional train/track/bridge interaction analysis is utilized in the analysis of dynamic behavior of bridges in which the eccentricity of axle loads and the effect of the toriosnal forces acting on the bridge are included for the more accurate train/track/bridge interaction analysis. Inverstigations mainly into the influence of vehicle speed on train/track/bridge interactions are carried out for the two cases. The first case is that only train and bridge are considered in the modelling and the other case is that train, track and bridge are considered.

  • PDF

Evaluation on Allowable Vehicle Speed Based on Safety of Track and Railway Bridge (궤도 및 교량 안전성을 고려한 열차 증속가능 속도대역 평가)

  • Bahng, Eun Young
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.2
    • /
    • pp.145-151
    • /
    • 2018
  • In this study, the track-bridge interaction analysis was performed using an analytical model considering the track structure, thereby taking into account the linear conditions (R=650 m, cant variation $160{\pm}60mm$) and the dynamic characteristics of the bridge. As a result of the study, the allowable speed on the example bridge considered was calculated at 200 km/h based on vertical deflection, vertical acceleration, and irregularity in longitudinal level, but was also evaluated at 170km/h based on the coefficient of derailment, wheel load reduction, and lateral displacement of the rail head. It is considered desirable to set the speed 170km/h to the speed limit in order to secure the safety of both the bridge and the track. It is judged that there will be no problems with ensuring rail protection and train stability in the speed band.