• 제목/요약/키워드: Variable Step Size

검색결과 190건 처리시간 0.023초

실차 시험을 통한 ER 현가장치의 성능평가 (Rerformance Evaluation of ER Suspensions Under Field Test)

  • 이헌균;최승복;한승직;장유진;이성범
    • 대한기계학회논문집A
    • /
    • 제24권2호
    • /
    • pp.347-354
    • /
    • 2000
  • This paper presents performance characteristics of a semi-active suspension featuring continuously variable ER (electro-rheological) dampers. These are evaluated through the field test of a passeng er car. Four ER dampers (two for front and two for rear part) are manufactured and their field-dependent damping properties are experimentally investigated. The damping force responses to step input fields are also identified by employing small size of high voltage amplifiers which are made adaptable to the field test. A skyhook controller considering the vertical, pitch and roll motions is formulated and incorporated with a car to be tested. The field test is then undertaken in order to evaluate both comfortability and steering stability showing bump, dive and squat responses.

여러 개의 패치로 이루어진 곡면에서 재매개변수화를 통한 공구경로 생성 (Tool Path Generation of Multi-Patch Sculptured Surface with Reparameterization)

  • 이성근
    • 한국생산제조학회지
    • /
    • 제9권5호
    • /
    • pp.119-126
    • /
    • 2000
  • Recently, according to the various taste of consumers, the design of a product is changed variously and complicatedly. The complicated product is not usually constructed with one path but multi-path. By the way, in machining, higher precision and the reduction of leading and machining time is required. But, for the multi-patch sculptured surface, the amount of machining data becomes large. This means the increase of leading and machining time. In this study, the tool path generation method with reparameterization is proposed for multi-patch sculptured surface and variable step size using NURBS is used to satisfy the precision and to reduce leading and machining time.

  • PDF

A New Approach for Resource Allocation in Project Scheduling with Variable-Duration Activities

  • Kim, Soo-Young;Leachman, Robert C.
    • 한국경영과학회지
    • /
    • 제19권3호
    • /
    • pp.139-149
    • /
    • 1994
  • In many project-oriented production systems, e. g., shipyards or large-scale steel products manufacturing, resource loading by an activity is flexible, and the activity duration is a function of resource allocation. For example, if one doubles the size of the crew assigned to perform an activity, it may be feasible to complete the activity in half the duration. Such flexibility has been modeled by Weglarz [13] and by Leachman, Dincerler, and Kim [7[ in extended formulations of the resource-constrained poject scheduling problem. This paper presents a new algorithmic approach to the problem that combines the ideas proposed by the aforementioned authors. The method we propose involves a two-step approach : (1) solve the resource-constrained scheduling problem using a heuristic, and (2) using this schedule as an initial feasible solution, find improved resource allocations by solving a linear programming model. We provide computational results indicating the superiority of this approach to previous methodology for the resource-constrained scheduling problem. Extensions to the model to admit overlap relationship of the activities also are presented.

  • PDF

A New Distance Measure for a Variable-Sized Acoustic Model Based on MDL Technique

  • Cho, Hoon-Young;Kim, Sang-Hun
    • ETRI Journal
    • /
    • 제32권5호
    • /
    • pp.795-800
    • /
    • 2010
  • Embedding a large vocabulary speech recognition system in mobile devices requires a reduced acoustic model obtained by eliminating redundant model parameters. In conventional optimization methods based on the minimum description length (MDL) criterion, a binary Gaussian tree is built at each state of a hidden Markov model by iteratively finding and merging similar mixture components. An optimal subset of the tree nodes is then selected to generate a downsized acoustic model. To obtain a better binary Gaussian tree by improving the process of finding the most similar Gaussian components, this paper proposes a new distance measure that exploits the difference in likelihood values for cases before and after two components are combined. The mixture weight of Gaussian components is also introduced in the component merging step. Experimental results show that the proposed method outperforms MDL-based optimization using either a Kullback-Leibler (KL) divergence or weighted KL divergence measure. The proposed method could also reduce the acoustic model size by 50% with less than a 1.5% increase in error rate compared to a baseline system.

Maximum Power Point Tracking in PMSG Using Fuzzy Logic Algorithm

  • ;이홍희
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2009년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.135-138
    • /
    • 2009
  • In this paper, a novel maximum power point tracking (MPPT) for a PMSG-based variable speed wind power system is proposed using the fuzzy logic algorithm. The control algorithm is developed based on the normal hill climb searching (HCS) method, commonly used in wind energy conversion systems (WECS). The inputs of fuzzy-based controller are the derivations of DC output power and the step size of DC/DC converter duty cycles. The main advantages of the proposed MPPT method are no need to measure the wind velocity and the generator rotational speed. As such, the control algorithm is independent of turbine characteristics, achieving the fast dynamic responses with non-linear fuzzy systems. The effectiveness of the proposed MPPT strategy has been verified through the simulated results.

  • PDF

Bilevel-programming based failure-censored ramp-stress ALTSP for the log-logistic distribution with warranty cost

  • Srivastava, P.W.;Sharma, D.
    • International Journal of Reliability and Applications
    • /
    • 제17권1호
    • /
    • pp.85-105
    • /
    • 2016
  • In this paper accelerated life testing is incorporated in quality control technique of acceptance sampling plan to induce early failures in high reliability products.Stress under accelerated condition can be applied in constant-stress, step-stress and progressive-stress or combination of such loadings. A ramp-stress results when stress is increased linearly (from zero) with time. In this paper optimum failure-censored ramp-stress accelerated life test sampling plan for log-logistic distribution has been formulated with cost considerations. The log-logistic distribution has been found appropriate for insulating materials. The optimal plans consist in finding optimum sample size, sample proportion allocated to each stress, and stress rate factor such that producer's and consumer's interests are safeguarded. Variance optimality criterion is used when expected cost per lot is not taken into consideration, and bilevel programming approach is used in cost optimization problems. The methods developed have been illustrated using some numerical examples, and sensitivity analyses carried out in the context of ramp-stress ALTSP based on variable SSP for proportion nonconforming.

A new approach for resource allocation in project scheduling with variable-duration activities

  • 김수영;제진권;이상우
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1994년도 춘계공동학술대회논문집; 창원대학교; 08월 09일 Apr. 1994
    • /
    • pp.410-420
    • /
    • 1994
  • In many project-oriented production systems, e.g., shipyards or large-scale steel products manufacturing, resource loading by an activity is flexible, and the activity duration is a function of resource allocation. For example, if one doubles the size of the crew assigned to perform an activity, it may be feasible to complete the activity in half the duration. Such flexibility has been modeled by Weglarz [131 and by Leachman, Dincerler, and Kim [7] in extended formulations of the resource-constrained project scheduling problem. This paper presents a new algorithmic approach to the problem that combines the ideas proposed by the aforementioned authors. The method we propose involves a two-step approach: (1) solve the resource-constrained scheduling problem using a heuristic, and (2) using this schedule as an initial feasible solution, find improved resource allocations by solving a linear programming model. We provide computational results indicating the superiority of this approach to previous methodology for the resource-constrained scheduling problem. Extensions to the model to admit overlap relationships of the activities also are presented.

VHDL과 FPGA를 이용한 Digital Power IC 설계 (Digital Power IC design using VHDL and FPGA)

  • 김민호;구본하;양오
    • 반도체디스플레이기술학회지
    • /
    • 제12권4호
    • /
    • pp.27-32
    • /
    • 2013
  • In this paper, the boost converter was implemented by digital control in many applications of the step-up. The PWM(pulse width modulation) control module of boost converter was digitized at power converter using the FPGA device and VHDL. The boost converter was designed to output a fixed voltage through the PI control algorithm of the PWM control module even if input voltage and output load are variable. The boost converter was digitized can be simplified by reducing the size of the module and the external control components. Thus, the digital power IC has advantageous for weight reduction and miniaturization of electronic products because it can be controlled remotely by setting the desired output voltage and PWM control module. The boost converter using the digital power IC was confirmed through experiments and the good performances were showed from experiment results.

여러 개의 패치로 이루어진 곡면에서 재매개변수화를 통한 공구경로 생성 (Tool Path Generation of Multi-Patch Sculptured Surface with Reparameterization)

  • 이성근
    • 한국공작기계학회:학술대회논문집
    • /
    • 한국공작기계학회 2000년도 춘계학술대회논문집 - 한국공작기계학회
    • /
    • pp.647-652
    • /
    • 2000
  • Recently, according to the various taste of consumers, the design of a product is changed variously and complicatedly. The complicated product is not usually constructed with one patch but multi-patch. By the way, in machining, higher precision and the reduction of leading and machining time is required. But for the multi-patch sculptured surface, the amount of machining data becomes large. This means the increase of leading and machining time. In this study, the tool path generation method with reparameterization is proposed for multi-patch sculptured surface and variable step size using NURBS is used to satisfy the precision and to reduce leading and machining time.

  • PDF

기체 상 데토네이션 셀 구조 해석을 위한 수치적 요구 조건 (NUMERICAL REQUIREMENTS FOR THE SIMULATION OF DETONATION CELL STRUCTURES)

  • 최정열;조덕래;이수한
    • 한국전산유체공학회:학술대회논문집
    • /
    • 한국전산유체공학회 2007년도 춘계 학술대회논문집
    • /
    • pp.177-181
    • /
    • 2007
  • Present study examines the numerical issues of cell structure simulation for various regimes of detonation phenomena ranging from weakly unstable to highly unstable detonations. Inviscid fluid dynamics equations with $variable-{\gamma}$ formulation and one-step Arrhenius reaction model are solved by a MUSCL-type TVD scheme and 4th order accurate Runge-Kutta time integration scheme. A series of numerical studies are carried out for the different regimes of the detonation phenomena to investigate the computational requirements for the simulation of the detonation wave cell structure by varying the reaction constants and grid resolutions. The computational results are investigated by comparing the solution of steady ZND structure to draw out the minimum grid resolutions and the size of the computational domain for the capturing cell structures of the different regimes of the detonation phenomena.

  • PDF