• Title/Summary/Keyword: Value Stream Mapping

Search Result 17, Processing Time 0.021 seconds

3D Online Marshmallow Simulation Game for Target Value Design

  • Kim, Suryeon;Mainardi, Pete;Jeong, H. David;Rybkowski, Zofia;Seo, Jinsil Hwaryoung
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.661-668
    • /
    • 2022
  • Various lean design and construction methods such as target value design, pull planning, value stream mapping have successfully transformed the commercial building construction industry into achieving improved productivity, higher design and construction quality, and meeting the target values of construction projects. Considering the significant advantages of lean, the accelerated dissemination and adoption of lean methods and tools for construction is highly desirable. Currently, the lean design and construction body of knowledge is imparted primarily through publications and conferences. However, one of the most effective ways to impart this soft knowledge is through getting students and trainees involved in hands-on participatory games, which can quickly help them truly understand the concept and apply it to real-world problems. The COVID-19 Pandemic has raised an urgent need of developing virtual games that can be played simultaneously from various locations over the Internet, but these virtual games should be as effective as in-person games. This research develops an online 3D simulation game for Target Value Design that is as effective as in-person games or possibly better in terms of knowledge capture and retention and enjoyable environment and experience. The virtual game is tested on volunteers using feedback from pre-and post- simulation surveys to evaluate its efficacy.

  • PDF

The Improvement of Curtain Wall Design Process using Value Stream Mapping Tools (VSM기법을 활용한 커튼월 공사의 설계 프로세스 개선)

  • Kim, Chang-Duk;Lee, Sang-Hyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.128-137
    • /
    • 2006
  • This paper is to develop curtain wall process life-cycle system in high-rise buildings in order to establish effective cooperation communication channels among the diverse constituents. This paper is to provide a base toward a curtain wall life-cycle management system to support decision making and the effective flow in light of information and materials. The four objectives of the research are 1) the analysis of the current curtain wall life-cycle process, 2) the analysis and development of the curtain wall design process As-Is model, and 3) the Muda analysis of the design process As-Is model and the suggestion of the improvements, 4) the development of curtain wall design To-Be model and comparative analysis of the improvement in terms of value streams. This research indicates the wastes decrease (or the values increase) from 6.7% up to 100% in different decision criteria through the improvement by the comparative analysis between the As-ls and To-Be curtain wall design process. This research suggests the potential improvement by VSM and a curtain wall life-cycle management system in curtain wall construction for diverse constituents be significant.

LEAN CONSTRUCTION MANAGEMENT OF BPIMT(BUILDIN-CONSTRUCTION PROCESS INNOVATION MANAGEMENT TOOLS & TECHNIQUES) THAT BASED VSM &TACT

  • Sang-Hyuk Lee;Chul-Woo Lim;Chang-duk Kim;Sang-Wook Suh;Yoon-Ki Choi;Jae-Youl Chun;Jung-Ho Yu
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1089-1093
    • /
    • 2005
  • Proving the effect of lean construction has yet to be done for its staying poor basic building though there has been efforts and wants to introduce the theory and concept of lean construction in practical site. Therefore, we need to specify the methods of productivity improvement and construction process through various adaptations in the site. Also, to apply such improvement methods systematically, we need active participation of owners, contractors and supply chain members in relation to construction industry and are also require appropriate methods to adapt. At first, this study thinks over the techniques of lean construction that has been verified through studies carried before. For second, it selects the technique of lean construction with the practicality in the construction site. For third, it is aimed to make a manual of lean process management by the use of TACT and V.S.M. For fifth, it will show the method of management for repeated activity and develop a guide-line and procedure that applies the concept of work sequence and resource equalization to each phase of process management. At last, it will show methods of reflecting V.S.M. to improve and grasp the waste factor from the step of managing an activity process and develop the form to analyze the waste in construction site by mapping the value flow.

  • PDF

Routing optimization algorithm for logistics virtual monitoring based on VNF dynamic deployment

  • Qiao, Qiujuan
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.16 no.5
    • /
    • pp.1708-1734
    • /
    • 2022
  • In the development of logistics system, the breakthrough of important technologies such as technology platform for logistics information management and control is the key content of the study. Based on Javascript and JQuery, the logistics system realizes real-time monitoring, collection of historical status data, statistical analysis and display, intelligent recommendation and other functions. In order to strengthen the cooperation of warehouse storage, enhance the utilization rate of resources, and achieve the purpose of real-time and visual supervision of transportation equipment and cargo tracking, this paper studies the VNF dynamic deployment and SFC routing problem in the network load change scenario based on the logistics system. The BIP model is used to model the VNF dynamic deployment and routing problem. The optimization objective is to minimize the total cost overhead generated by each SFCR. Furthermore, the application of the SFC mapping algorithm in the routing topology solving problem is proposed. Based on the concept of relative cost and the idea of topology transformation, the SFC-map algorithm can efficiently complete the dynamic deployment of VNF and the routing calculation of SFC by using multi-layer graph. In the simulation platform based on the logistics system, the proposed algorithm is compared with VNF-DRA algorithm and Provision Traffic algorithm in the network receiving rate, throughput, path end-to-end delay, deployment number, running time and utilization rate. According to the test results, it is verified that the test results of the optimization algorithm in this paper are obviously improved compared with the comparison method, and it has higher practical application and promotion value.

Applying Lean, Green, and Six-Sigma Framework to Improve Exterior Construction Process in Saudi Arabia

  • Banawi, Abdul-Aziz;Bilec, Melissa
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.2
    • /
    • pp.12-22
    • /
    • 2014
  • Over the last decade, Saudi Arabia has experienced significant economic increases as evidenced by the 30% growth in its gross domestic product; furthermore, the construction industry has increased 10% in the same time period. Due to this significant growth, the construction industry is encountering issues related to construction quality resulting in significant waste and associated environmental impacts. In this research, we applied our previously developed framework that integrates three different methods-Lean, Green, and Six-sigma - to a residential construction complex in Saudi Arabia. Our aim of this case study was to explore the application of the framework in practice to glean quantitative results and further validate the framework. In the case study, we used the developed framework to identify a significant issue related to quality and delays - final completion of 53 residential units was delayed because of failed exterior buildings surfaces. We then used the framework to define the causes behind the defects via a field investigation of the 53 units. Of the defect, construction execution was responsible for 43% of the defect, 31% untrained workers, 19% unfavorable construction weather condition, with 7% accounting for other issues. A procedure was developed in concert with the construction manager and overall developer reducing the amount of rework and waste causes revealed by the field examination and the framework. Although two steps were added to the original construction process to overcome waste causes, still save a lot of resources and reduces environmental impact. In summary, we found that the Lean, Green, Six-sigma framework increased productivity, quality, and reduced waste.

Development of the procurement system for Just-in-Time Building Construction (건설공사 적시생산(Just-ln-Time)을 위한 조달시스템 개발 - 콘크리트 타설 공사를 중심으로 -)

  • Shin Bong-Soo;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.235-244
    • /
    • 2004
  • The effective management of major construction resources is the key to the success in high-rise residential building construction projects. It is even more important and challenging as well especially in CBD(central business district) area under tight project duration since little leeway in interface between construction trades, severe constraints in staging n and heavy demands for lifting among construction resources. In order to meet high demands among major construction resources, highly effective construction resource management information system is required This research develops and provides a system which selects and disseminates these information from each phase of procurement transportation, lift-up and storage for major construction resources This research applies the Kanban system, well recognized material information system technique in automobile manufacturing industry, in concrete work processes. It develops concrete procurement information system utilizing VSM(Value Stream Mapping) and also applies the model in actual super-high rise residential building construction project in order to analyze the benefit of the research model.

A Study on Land Acquisition Priority for Establishing Riparian Buffer Zones in Korea (수변녹지 조성을 위한 토지매수 우선순위 산정 방안 연구)

  • Hong, Jin-Pyo;Lee, Jae-Won;Choi, Ok-Hyun;Son, Ju-Dong;Cho, Dong-Gil;Ahn, Tong-Mahn
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.17 no.4
    • /
    • pp.29-41
    • /
    • 2014
  • The Korean government has purchased land properties alongside any significant water bodies before setting up the buffers to secure water qualities. Since the annual budgets are limited, however, there has always been the issue of which land parcels ought to be given the priority. Therefore, this study aims to develop efficient mechanism for land acquisition priorities in stream corridors that would ultimately be vegetated for riparian buffer zones. The criteria of land acquisition priority were driven through literary review along with experts' advice. The relative weights of their value and priorities for each criterion were computed using the Analytical Hierarchy Process(AHP) method. Major findings of the study are as follows: 1. The decision-making structural model for land acquisition priority focuses mainly on the reduction of non-point source pollutants(NSPs). This fact is highly associated with natural and physical conditions and land use types of surrounding areas. The criteria were classified into two categories-NSPs runoff areas and potential NSPs runoff areas. 2. Land acquisition priority weights derived for NSPs runoff areas and potential NSPs runoff areas were 0.862 and 0.138, respectively. This implicates that much higher priority should be given to the land parcels with NSPs runoff areas. 3. Weights and priorities of sub-criteria suggested from this study include: proximity to the streams(0.460), land cover(0.189), soil permeability(0.117), topographical slope(0.096), proximity to the roads(0.058), land-use types(0.036), visibility to the streams(0.032), and the land price(0.012). This order of importance suggests, as one can expect, that it is better to purchase land parcels that are adjacent to the streams. 4. A standard scoring system including the criteria and weights for land acquisition priority was developed which would likely to allow expedited decision making and easy quantification for priority evaluation due to the utilization of measurable spatial data. Further studies focusing on both point and non-point pollutants and GIS-based spatial analysis and mapping of land acquisition priority are needed.