• Title/Summary/Keyword: VSSI

Search Result 8, Processing Time 0.021 seconds

A VSSI-CRL Synthetic Control Chart (VSSI-CRL 합성관리도)

  • Lee Jae-Won;Lim Tae-Jin
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.30 no.4
    • /
    • pp.1-14
    • /
    • 2005
  • We propose a VSSI-CRL(Variable Sampling Size and Samplina Interval-Conforming Run length) synthetic control chart in order to improve the statistical characteristics of both the VSSI chart and the CRL synthetic chart. The VSSI-CRL chart utilizes VSSI sampling scheme, but it produces a signal only when the CRI is less than a given limit. An algorithm for calculating the ARL(Average Run length) and ATS(Average Time to Signal) of the VSSI-CRL chart is developed by employing Markov chain method. We present some lemmas for describing the statistical characteristics of the VSSI-CRL chart under in-control state. A procedure for designing the VSSI-CRL chart is proposed based on the lemmas. Extensive comparative studios show that the VSSI-CRL chart is superior to the CRL synthetic chart or the VSSI chart in general, and is comparable to the EWMA chart in ATS performance.

Statistical Efficiency of VSSI $\bar{X}$ Control Charts for the Process with Two Assignable Causes (두 개의 이상원인이 존재하는 공정에 대한 VSSI $\bar{X}$ 관리도의 통계적 효율성)

  • Lee Ho-Jung;Lim Tae-Jin
    • Journal of Korean Society for Quality Management
    • /
    • v.32 no.4
    • /
    • pp.156-168
    • /
    • 2004
  • This research investigates the statistical efficiency of variable sampling size & sampling interval(VSSI) $\bar{X}$ charts under two assignable causes. Algorithms for calculating the average run length(ARL) and average time to signal(ATS) of the VSSI $\bar{X}$ chart are proposed by employing Markov chain method. States of the process are defined according to the process characteristics after the occurrence of an assignable cause. Transition probabilities are carefully derived from the state definition. Statistical properties of the proposed chart are also investigated. A simple procedure for designing the proposed chart is presented based on the properties. Extensive sensitivity analyses show that the VSSI $\bar{X}$ chart is superior to the VSS or VSI $\bar{X}$ chart as well as to the Shewhart $\bar{X}$ chart in statistical sense, even tinder two assignable causes.

Economic-Statistical Design of VSSI Cause-Selecting Charts Considering Two Assignable Causes (두 개의 이상원인을 고려한 VSSI 원인선별 관리도의 경제적-통계적 설계)

  • Jung, Min-Su;Lim, Tae-Jin
    • Journal of Korean Society for Quality Management
    • /
    • v.37 no.1
    • /
    • pp.29-39
    • /
    • 2009
  • This article investigates economic-statistical design of VSSI(variable sampling size and interval) cause-selecting charts considering two assignable causes. We consider a process which is composed of two dependent sub-processes. In each sub-process, two kinds of assignable cause may exist. We propose a procedure for designing VSSI cause-selecting charts, based on Lorenzen and Vance model. Computational experiments show that the VSSI cause-selecting chart is superior to the FSSI cause-selecting chart in the economic-statistical characteristics, even under two assignable causes.

두 개의 이상원인을 고려한 VSSI $\bar{X}$ 관리도의 경제적-통계적 설계

  • 이호중;임태진
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2004.04a
    • /
    • pp.507-512
    • /
    • 2004
  • This research investigates economic-statistical characteristics of variable sampling size & interval(VSSI) X charts under two assignable causes. We propose the procedure for designing VSSI X charts, based on Lorenzen and Vance model. Computational experiments show that the VSSI X chart Is superior to the Shewhart X chart in the economic-statistical sense, even under two assignable causes

  • PDF

두 개의 이상원인을 고려한 VSSI $\bar{X}$ 관리도의 통계적 특성

  • 이호중;임태진
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2004.04a
    • /
    • pp.64-69
    • /
    • 2004
  • This research investigates statistical characteristics of variable sampling size & interval(VSSI) X charts under two assignable causes. Algorithms for calculating the average run length(ARL) and average time to signal(ATS) of the VSSI X chart are proposed by employing Markov chain method. Extensive sensitivity analysis shows that the VSSI. X chart is superior to the VSS or VSI X chart as well as to the Shewhart X chart in statistical sense, even under two assignable causes.

  • PDF

Economic-Statistical Design of VSSI$\bar{X}$ Control Charts Considering Two Assignable Causes (두 개의 이상원인을 고려한 VSSI$\bar{X}$ 관리도의 경제적-통계적 설계)

  • Lee, Ho-Joong;Lim, Tae-Jin
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.31 no.1
    • /
    • pp.87-98
    • /
    • 2005
  • This research investigates economic-statistical characteristics of variable sampling size and interval (VSSI)$\bar{X}$charts under two assignable causes. A Markov chain approach is employed in order to calculate average run length (ARL) and average time to signal (ATS). Six transient states are derived by carefully defining the state. A steady state cost rate function is constructed based on Lorenzen and Vance(1986) model. The cost rate function is optimized with respect to six design parameters for designing the VSSI $\bar{X}$ charts. Computational experiments show that the VSSI $\bar{X}$ chart is superior to the Shewhart $\bar{X}$ chart in the economic-statistical sense, even under two assignable causes. A comparative study shows that the cost rate may increase up to almost 30% by overlooking the second cause. Critical input parameters are also derived from a sensitivity study and a few guideline graphs are provided for determining the design parameters.

A Comparative Study on the Design of Adaptive Control Charts (적응형 관리도의 설계에 대한 비교연구)

  • Lim, Tae-Jin
    • Journal of Korean Society for Quality Management
    • /
    • v.36 no.1
    • /
    • pp.7-19
    • /
    • 2008
  • During the past two decades, a huge amount of research on adaptive control charts has been accomplished. Especially, variable sampling interval (VSI), variable sample size (VSS), and variable sample size and sampling interval (VSSI) charts have been focused by many researchers due to their simplicity and efficiency. On the other hand, the difference among notations, assumptions, methodologies may cause confusions in per forming further studies or practical implementations. This research analyses and compares diverse models so as to provide a unified view on statistical and economical characteristics. As a result, we perform comparative study on economical design models of VSI, VSS, and VSSI charts, respectively, We also present practical guidelines to utilize those adaptive control charts.

An Economic Design of $\bar{X}$ Control Charts with Variable Sample Size and Sampling Interval (변량표본크기와 변량표본추출구간을 이용한$\bar{X}$관리도의 경제적 설계)

  • 김계완;윤덕균
    • Journal of Korean Society for Quality Management
    • /
    • v.28 no.3
    • /
    • pp.18-30
    • /
    • 2000
  • Recent studies have shown that the $\bar{X}$ chart with variable sampling intervals(VSI) and the $\bar{X}$ chart with variable sample size(VSS) are much quicker than Shewhart $\bar{X}$ chart in detecting shiks in the process. Shewhart $\bar{X}$ chart has been beneficial to detect large shifts but it is hard to apply Shewhart $\bar{X}$ chart in detecting moderate shifts in the process mean. In this article the $\bar{X}$ chart using variable sample size(VSS) and variable sampling Intervals(VSI) has been proposed to supplement the weak point mentioned above. So the purpose of this paper is to consider finding the design parameters which minimize expected loss costs for unit process time and measure the performance of VSSI(variable sample size and sampling interval) $\bar{X}$ chart. It is important that assignable causes be detected to maintain the process controlled. This paper has been studied under the assumption that one cycle is from starting of the process to eliminating the assignable causes in the process. The other purpose of this article is to represent the expected loss costs in one cycle with three process parameters(sample size, sampling interval and control limits) function and find the three parameters.

  • PDF