The Case Analysis on the Road-Crossroad Design VE Competition (도로교차로 설계VE 경진대회 사례분석)

  • Kim, Ki-Han;Kim, Byung-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.839-842
    • /
    • 2008
  • Construction VE is the system introduced in order to reduce the life cycle cost and promote the performance of construction facilities, used in architecture and civil construction since apply to construction over 10 billion from december 2005. But yet it is short of VE specialist and it is not a purpose in maximization of value creation through VE but strong better awareness of tool for budget reduce. This study tries to contribute to qualitative advance of design VE by analyze substantial degree of VE Procedure and VE result by Job Plan used widely in domestic an object design VE competition case to crossroad.

  • PDF

A study on the effective propulsion method of design VE that used TRIZ (TRIZ를 활용한 설계VE의 효율적 추진방안)

  • Oh, Jae-Won;Kim, Kwang-Soo
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.7 no.1
    • /
    • pp.177-187
    • /
    • 2012
  • Design VE is a kind of contradictive administrating that pursue both value improvement and cost reduction, whereas TRIZ is a method used to solve contradiction based on its invention principal. This paper comprehended the problems regarding the object through design VE using function analysis, and presented a number of methods to solve this by using the principal of TRIZ. This study compared the characteristics of Design VE and TRIZ, and suggested a procedure that integrates both Design VE and TRIZ.

  • PDF

Application of Value Engineering to Early Design Phases in Construction Projects (건설사업 설계초기단계 VE 적용방안)

  • Lee Seung-Hoon;Koo Kyo-Jin;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.156-166
    • /
    • 2005
  • The purpose of this study is to present proper VE application methods to euly design phases. Since VE methodology is more effective on early stage of design phase, the study focused on application of VE methodology in early stage of design process. With the examination of past studies, obstacles of VE application in domestic construction industry are defined. To solve these problems, this paper presents (1) subdivision of VE execution time, (2) an appropriate VE targeting method for construction industry, (3) a resonable and practical function analysis process, and (4) modified design-VE job plan.

Procedures and Strategies for a Function Definition in the Design Phase VE (설계VE에서 기능정의를 위한 절차 및 방안)

  • Lee, Hyun-Jong;Park, In-Woo;Hyun, Chang-Taek;Koo, Gyo-Jin;Hong, Tae-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.151-156
    • /
    • 2007
  • 2006년부터 VE 대상프로젝트가 확대되고, 기본설계와 실시설계단계에 각 1회씩 설계VE를 적용토록 규정되어 설계단계별로 VE가 각각 적용되는 프로젝트가 늘어나고 있다. 그리고 원가절감과 성능향상으로 프로젝트 가치를 높인 설계VE 사례도 많아지고 있다. 하지만 기본설계와 실시설계단계의 조건에 적합한 VE 수행방안에 대한 연구가 미진하고 참여자들의 경험과 이해가 부족하여 단계별 설계VE를 효율적으로 수행하는데 많은 어려움이 있다. 본 연구에서는 기본설계단계와 실시설계단계로 나누어 VE를 수행한 실무사례를 분석하여 기능정의와 아이디어 창출간의 연관관계 및 각 설계단계에서 기능정의를 수행할 때 발생하는 문제점을 도출하였다. 문제점을 해결하고 효과적인 설계VE를 수행하기 위하여 다음과 같은 개선방안을 제시하였다. 첫째, 설계프로세스의 흐름에 맞추어 기본설계에는 공간기능에 대하여하고 실시설계에는 부위에 대하여 기능정의를 수행한다. 이때 상위의 레벨에는 하위의 레벨의 기능정의가 연계되는 기능분류체계 (FBS : Function Breakdown Structure)를 제안하였다. 둘째, 기본설계와 실시설계단계의 기능정의를 수행하는 프로세스 (FDP : Function Definition Process)를 제안하였다. 셋째, 실시설계단계에서는 부위별 요구 성능 평가 매트릭스 (EFM : Element Function Matrix)를 적용하여 기능정의와 아이디어 창출이 연계되도록 하였다. 설계VE의 주요 부분인 기능정의 과정에 대한 문제점을 도출하여 해결방안을 제시함으로써, 보다 효과적인 설계VE의 수행을 기대할 수 있다.

  • PDF

Understanding of Nondestructive Testing Technique (건설공사의 Value Engineering Study)

  • 최춘배
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.1
    • /
    • pp.53-58
    • /
    • 2001
  • Value Engineering (VE) is an organized process with an impressive history of improving value and quality. VE can be applied to the construction projects with having good study results. The VE study in construction projects gives identification of opportunities to remove unnecessary costs while assuring quality, performance, reliability, and other factors will meet or exceed the clients needs. VE techniques can save money, reduce time, and improve quality, reliability, maintainability, and performance. VE can also make improving of human factors (altitudes, creativity), and team work. According to the results of VE study in recent USA, 5∼35% reduction in initial costs have been made for the construction projects (ROI ranges : 100∼1000). To have successful work results, if possible, VE study shall be considered at project planning stage or basic design stage later than field work stage with application of VE JOB PLAN, multi-disciplinary approach, and proper techniques in respective study phases (pre-workshop / information gathering / function analysis / creativity / judgement and evaluation / development / presentation and implementation) among the detail techniques in many.

  • PDF

An Effective Function Analysis Application for Construction VE Projects (건설 VE 프로젝트에서 효과적인 기능분석 적용방안)

  • Choi Seok-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.78-84
    • /
    • 2002
  • In VE(Value Engineering) process, function analysis technique is utilized as a stepping stone to induce creative idea. However, function analysis is regarded as the most difficult job for VE team to undertake. For this reason, the function analysis is not properly applied or even omitted in construction VE studies. The current problems of function analysis in construction VE are following: 1) lack of basic understanding of the function analysis as problem solving technique, 2) the sequential step-by-step analysis process, 3) lack of interrelationship between function analysis and other phase in th VE process, 4) lack of time, experience, training, and quantitative data etc. The existing function analysis is faultiness theoretically. However, it is not enough for efficient use in practice, Thus The study aims to suggest an function analysis application method and to develop a computerized FAST(function Analysis System Technique) diagramming model, called Easy-FAST, for the efficient and effective function analysis on construction VE projects.

  • PDF

Value Management of Private Finance Initiative Projects (민간투자사업을 위한 VE 적용방안)

  • Lim, Jong-Kwon;Kim, Seoung-Il
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.123-130
    • /
    • 2006
  • Recently, Korean government promotes BTL(Build-Transfer-Lease) for their public construction project to apply private sector's experience and finance initiatives. Many of public buildings and civil infrastructure projects were planned to be delivered by BTL and it helps to continue public projects under tight budget conditions. Since the characteristics of BTL projects, creative ideas for the project function, performance and its LCC (Life Cycle Cost) become more important than usual public work project. This paper introduces the systematic "VE job Plan" application techniques for BTL project and shows the process. This study shows the application of "VE job Plan" for BTL project to help decision making and value improvement. Also, Project cost was estimated by LCC (Life Cycle Cost) analysis. Technical "FAST diagram"was developed and used to find major functions of the project. So, it helps to improve performance of functions and make creative ideas. FAST diagram also help to find relationships between functions and cost. A case study (Daegu Art Gallery BTL Project) was conducted using proposed "VE job Plan. Study demonstrates how value management helps save money and increase functional performance. Researcher found that project can save cost and improve performance of functions significantly by using appropriate VE analysis process at appropriate time.

  • PDF

An Efficient Idea Creation Method of Design Value Engineering for Construction Projects (건설 프로젝트 설계VE의 효율적인 아이디어 창출 방법)

  • Kim, Soo-Yong;Yang, Jin-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.55-63
    • /
    • 2006
  • As value engineering in design phase is big in the effect of application, analysis by systematic procedures is required. The most important part is the stage of creation for making of idea. It takes much time for us to make good idea involving the brainstorming and delphi in recent making idea. It is expected because most experts in participating in design value engineering is to approach with less effective method. In this study we suggest that application of ASIT(Advanced Systematic Inventive Thinking) is the method as way of creative idea making. ASIT is expected to perform Idea making with systematic procedure and to create effective idea in short time.

VE Alternative Verification Method Using KANO Model (카노모델을 활용한 VE대안 검증방법)

  • Liu, Jun-Nan;Qiao, Le;Park, Jin-Young;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.923-932
    • /
    • 2019
  • VE is used as a powerful tool to add value to facilities by improving functionality and reducing costs. By identifying the client's requirements in the VE process and reflecting them in the quality model, the developed alternatives meet the client's requirements. However, there is no process to verify how the developed alternatives reflect the needs of the client through functional analysis, idea generation and evaluation. The purpose of this study was to develop, verify, and prove the effectiveness of a methodology for evaluating client satisfaction with alternatives developed during the VE Job Plan. The KANO model, which can identify the satisfaction and dissatisfaction of requirements in product planning, was set as a methodology for alternative verification procedures of VE, and was improved and applied to the purpose of this study. As a result, the alternative evaluation method developed in this study was found to be useful. It is expected that the KANO model will be used to evaluate the satisfaction of VE alternatives in the VE Job Plan analysis.

A Study of Improving the Reliability of VE Process (건설 VE 평가 신뢰도 향상 방안에 관한 연구)

  • Shin, Sung-In;Woo, Sungkwon;Jin, Sung-Ho;Choi, Seok-In
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.5
    • /
    • pp.881-889
    • /
    • 2016
  • The VE evaluation process, in which the value is composed of the cost and the function, should have a characteristic of quantitative analysis based on specific figures rather than qualitative approach. However, most of the VE evaluation performed domestically have a problem of having no systematic process of quantification of the function, even though the cost is estimated and analyzed quantitatively. Moreover, in addition to the tendency of strong practical experience, the VE evaluation has the problem of limited application of practical scientific analysis caused by declining the suggestion of creative opinions by over quantification or over objectification. This paper presents the suggestions for improvement of VE evaluation processes, which satisfies the aspects of simplification and objectification, without hindering the essence of the evaluation in the practical business point of view.