Considering Performance Measurement and Life-Cycle Costs for Andong Culture & Art Center BTL Project (VE기법을 적용한 안동문화예술회관 민간투자사업의 성능개선 사례연구)

  • Kim, Seong-Il;Lee, Kwang-Mo;Choi, Seok-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1005-1010
    • /
    • 2007
  • According to revision of Construction Technology Management Act (2005), the government ordering construction which cost is more than 10billion won should investigate the value engineering(VE) of a construction. In this sense, the government actively promote plans in 2008 after identifying the examining standards of the investigation on the VE(2007). It is substantial issue to introduce Pre-Qualification(PQ) in oder to restrain unlicensed VE consulting companies or VE consultants. This system will contribute to the quality and the settlement of the value engineering in our country. The reason why the Korea VE Society founded in 2006 is one of the afore-mentioned reasons. Therefore, we try to establish the value engineering of Build-Transfer-Lease Scheme by providing the practical application of construction value engineering and definite procedures through the example of Andong Culture and Art Center's research in one of the various construction fields.

  • PDF

Report on VE & LCC (Value Engineering, Life Cycle Cost) Technics Introduction about the Electric Power Equipment (전력시설물에 대한 VE 와 LCC기법 도입에 관한 연구)

  • 김상직;장우진
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2003.11a
    • /
    • pp.81-86
    • /
    • 2003
  • Recently the introduction of VE & LCC techniques for large size electric power facilities be achieved in various kinds form, of and tends to evaluate to the beginning investment cost when think about cost of electric power facilities usually, but must consider all life cycle cost (maintenance cost, repair cost, improvement cost, operation cost, electric power cost etc.). This treatise applies design techniques that consider copper loss related by voltage drop at power supply of long distance in trunk design and all life cycle cost techniques

  • PDF

A Study on the Typology of Alternatives in the Design VE of Educational Facilities (교육시설 설계VE의 대안 유형화 방안 연구)

  • Choi, Kwang-Mo;Song, Jeong-Hwa;Oh, Kun-Soo
    • Proceedings of the KAIS Fall Conference
    • /
    • 2010.05b
    • /
    • pp.649-652
    • /
    • 2010
  • 교육시설에 BTL사업이 활성화됨에 따라 해당 사업의 규모가 급격히 확대되고 있다. 이에 교육시설 설계에 있어서 창의적이고 효율적인 대안설계를 제안해야함에 따라 설계VE 영역의 중요성이 부각되어 활발하게 진행되고 있다. 현재의 설계VE 진행절차는 준비단계, 분석단계, 실행단계로 이어지며 각 단계별로 다양한 운용기법과 분석방법으로 진행되고 있다. 특히 그동안 진행되었던 다수의 교육시설 설계VE 사례를 살펴본 바에 의하면, 설계VE 과정에서 VE대상 선정 시 동일하거나 유사한 방법이 나타나고, 최종 대안 역시 프로젝트 별로 유사한 패턴을 보이고 있음에도, 기존 설계VE의 전 과정이 반복적으로 진행되고 있다. 따라서 본 연구는 이처럼 동일하거나 유사하게 나타나는 대안들을 유형화 하여 설계VE 절차를 간소화함으로써 VE활동 기간을 단축시켜 효율성을 높이고자 한다. 이를 위해 기존 교육시설 설계VE 사례들을 통해 다양한 VE대안들을 분석하여 유형별로 정리한다. 그 결과로 유사한 패턴이 나타나는 최종 대안들을 교육시설의 공간과 각 공간에 따른 공종별로 구분하여 유형화하고자 한다. 이는 교육시설 설계VE 활동 시 유형화 된 대안을 활용하여 기능분석 등의 단계를 생략함으로써 설계VE 활동 기간 단축과 투입 노력을 축소시키는 효과를 얻을 수 있을 것이며, 설계VE에 있어서 보다 효율적인 운용이 가능하게 될 것이다.

  • PDF

Travel Time Prediction Algorithm Based on Time-varying Average Segment Velocity using $Na{\ddot{i}}ve$ Bayesian Classification ($Na{\ddot{i}}ve$ Bayesian 분류화 기법을 이용한 시간대별 평균 구간 속도 기반 주행 시간 예측 알고리즘)

  • Um, Jung-Ho;Chowdhury, Nihad Karim;Lee, Hyun-Jo;Chang, Jae-Woo;Kim, Yeon-Jung
    • Journal of Korea Spatial Information System Society
    • /
    • v.10 no.3
    • /
    • pp.31-43
    • /
    • 2008
  • Travel time prediction is an indispensable to many advanced traveler information systems(ATIS) and intelligent transportation systems(ITS). In this paper we propose a method to predict travel time using $Na{\ddot{i}}ve$ Bayesian classification method which has exhibited high accuracy and processing speed when applied to classily large amounts of data. Our proposed prediction algorithm is also scalable to road networks with arbitrary travel routes. For a given route, we consider time-varying average segment velocity to perform more accuracy of travel time prediction. We compare the proposed method with the existing prediction algorithms like link-based prediction algorithm [1] and Micro T* algorithm [2]. It is shown from the performance comparison that the proposed predictor can reduce MARE (mean absolute relative error) significantly, compared with the existing predictors.

  • PDF

Improving the Design-phased VE Process of Public Clients in Relation to Using Critical Success Factors (핵심성공요인과 연계한 공공발주기관의 설계VE 프로세스 개선에 관한 연구)

  • Park, Heedae;Han, Seung Heon;Kim, Sung Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3D
    • /
    • pp.399-408
    • /
    • 2009
  • The major changes in construction environment are that construction project is bigger and more complicated and the power of construction market changes from the supplier to the client or the user. Especially public construction enterprises have advanced to introduce the value engineering (VE) which is one of the cost management based on the owner's leading at the design phase for economical efficiency and quality improvement. According to the these efforts, the implementation of VE was legislated in the revised Construction Technology Management Act in 2000, governmental agencies, local autonomies, and construction public enterprises universally has taken the VE into consideration. In this circumstance, the scope that VE construction applied at 50 billion won projects from 2003 has been extended to 10 billion won projects in 2006. Therefore, the VE construction will be activated in the future. The cost savings and function improvement, which are the purpose of VE are not only construction public enterprises, but also every public client supported from government's budget or owned by the government. Therefore, the purpose of this study is to propose the improved process and performance index of VE for governmental agencies, local autonomies, and construction public enterprises which want to introduce or improve the VE process. This research also suggested the To-be design-phased VE process model. In addition, it suggested the To-be model of design management reflected the To-be design-phased VE process model, which is eliminated two problems reflected for the performance improvement of the As-is model of design management.

A Study on VE Counterproposal Assessment for Utility Poles (통신전주 VE 대안평가에 관한 연구)

  • Kang, Wang-Kyu;Han, Jin-Woo
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2008.08a
    • /
    • pp.540-544
    • /
    • 2008
  • 인프라시설은 한번 설치하면 오랜 기간동안 사용해야 하는 시설로서 설치단계에서부터 가치에 기반하여 최적으로 구축하는 것이 무엇보다도 중요하다. 지금까지 설치된 인프라시설은 초기 투자비용만 고려되었을 뿐, 생애주기비용(LCC)과 성능이 고려되지 않아 효율적인 유지관리와 제대로된 자산관리를 하지 못하고 있는 것이 현실이다. 하지만, 앞으로의 시설 구축 개념은 최저 비용 개념에서 최고 가치 개념으로 변해가고 있으며, 정부에서도 100억원 이상의 건설공사에 LCC 및 VE 검토를 의무화 하고 있는 상황으로, 인프라시설 구축 시에도 VE 대안평가가 필요하다는 의견이 많이 대두되고 있다. 따라서, 본 논문에서는 인프라시설 중 하나인 통신전주를 대상으로 VE 대안평가를 실시하여 향후 설치될 통신 전주에 대한 의사결정 가이드라인을 제시하고, 이를 체계적으로 지원할 수 있는 인프라시설 VE 평가시스템에 대한 내용도 함께 소개하여 인프라시설에 적용 가능한 VE 대안평가 기법의 초석을 마련하고자 한다.

  • PDF

Definition of Environmental Cost and Eco-VE Model for Eco-VE of Construction Facility (건설시설물 친환경 VE를 위한 환경비용 및 친환경가치모델 정립)

  • Kim, Myung-Jin;Kim, Joon-Soo;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.5
    • /
    • pp.903-913
    • /
    • 2016
  • Paris Agreement of Climate Change seem affect to Korea eco-policy. Meanwhile the eco-design for reduce carbon emission have been applied in design phase of construction. However eco-design have applied passively except the project of eco-building system. For reflect eco-component in design, design VE that be appling to basic design and executing design phase of all construction project of over 10 billion should be use. But present applying VE Job Plan is reflecting partly eco-component, so the effect is small. Therefor new eco-VE development that reflect eco-elements to exist VE need. As the result of this study, the concept of environmental cost is defined to accounting. The calculation of the cost was using methods that apply $CO_2$ emission trading price, WTP, carbon productivity concept and carbon tax based on $CO_2$ emission. However, in order to apply eco-friendly VE at design phase, the model of new concept included carbon productivity concept is necessary. The eco-friendly VE model of new concept is model using $CO_2$ emission and potential environmental pollution index (PEPI). This study tried define eco-value model and environmental cost definition that become the major axle of eco-VE.

An In-depth Analysis of Enhancing the Core Blueprint of Architectural Constructs Leveraging Value Engineering(VE) Techniques (VE 기법을 활용한 건축 구조물 코어 형식 개선 방안에 관한 연구)

  • Lee, Jae-Taek;Kim, Gyu-Yong;Lee, Jae-Hyun;Nam, Jeong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.5
    • /
    • pp.571-581
    • /
    • 2023
  • The contemporary domestic construction landscape has witnessed a contraction, primarily attributed to the operational challenges faced by construction entities and a downtrend in the initiation of new projects. In light of this, domestic construction enterprises are ardently seeking avenues to economize whilst simultaneously amplifying the quality across diverse construction genres. Value engineering (VE), heralded for its prowess in not only cost mitigation but also in accelerating project timelines and bolstering construction quality, has been extensively adopted in refining finishing tasks. However, its application to framework enhancements remains conspicuously limited. Particularly in factory edification, framing emerges as a pivotal process exerting significant influence over the entire construction continuum. Thus, it becomes imperative to integrate VE techniques at the inception phase of framing. This would facilitate a meticulous examination of design schematics and on-site conditions, paving the way for alternative strategies that condense construction durations, economize on costs, and augment work efficiency, all the while upholding paramount standards of quality and safety. Such a venture stands to be foundational in expediting construction timelines, fostering economic efficiency, and buttressing construction safety protocols.

A Case Study of Construction Management for Pusan National University Children's Hospital (부산대학교 어린이병원 건립사업 CM 수행사례)

  • Yang, Jin-Kook;Ri, Min-Hyeon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.13-18
    • /
    • 2007
  • The construction by the ministry of health and welfare support of the first special hospital for only children in busan and gyeong-nam is under building with YPNUH(Yangsan Pusan National University Hospital) for the best medical treatment town and is to improve the productivity and efficiency by eliminating unproductive and inefficient fact through the construction management, systemic and scientific management technique. So in this study we would like to suggest the generated effect to apply project management technique to all stage such as from pre-design phase, turn-key enterprise choice, construction, design VE(Value Engineering), PMIS (Project Management Information System) construction to maintenance phase and cost and schedule reduction effect through basic, execution design VE by using engineer of field.

  • PDF