• Title/Summary/Keyword: VE모델

Search Result 104, Processing Time 0.03 seconds

Application of probabilistic VE/LCC Analysis Models for Quay Wall Structures (안벽구조물의 확률론적 VE/LCC 분석모델 적용방안)

  • Ahn, Jong-Pil;Lee, Cheung-Bin;Park, Ju-Won;Yu, Deog-Chan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.71-79
    • /
    • 2007
  • It is common that the analysis of VE/LCC is performed in design phase of quay wall structures. The analysis is mainly executed based on experience and engineering sense of expert considering the selection of construction method, construction and maintenance cost. Recently there are increasing demands on the analysis that includes uncertainty and vulnerability of input parameters, for this purpose, fuzzy reliability based probabilistic VE/LCC analysis model for quay wall structures is suggested. In VE/LCC analysis for quay wall structures, the application of probabilistic analysis method give very similar results compare with those of deterministic analysis method. It is anticipated that the methodology proposed in this paper can also be utilized in the design and maintenance phase of other facilities where decision making is made for the probabilistic life cycle cost and value analysis.

A Hi-Value Process Establishment for Efficient Implement of Design Value Engineering in Highway (효율적 고속도로 설계VE 수행을 위한 Hi-Value 프로세스 정립)

  • Heo, In;Lee, Yong-Gu;Jeong, Byeong-Cheon;Yang, Jae-Gyeong
    • Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.36-48
    • /
    • 2011
  • 도로건설프로젝트에서의 VE는 도로시설물의 기능을 향상시키고 비용을 절감하기 위한 방법으로 지금까지 널리 활용되고 있다. 그러나, 실제 건설VE 실무에서는 VE Job Plan 중 일부 단계가 생략되거나 형식적으로 수행되는 문제점이 발생되어 VE 수행결과에 대한 신뢰성에 의문이 제기되고 있다. 이는 제조업과 달리 대규모이며 복합공종을 갖는 건설프로젝트의 특성을 반영하지 못하고 있기 때문이다. 건설프로젝트는 대규모 복합공종으로 구성되어 복잡하고 다양한 기능 및 요구성능이 있으며, 시설물이 갖는 기능(Function)과 요구성능(Required Performance)의 일부는 반복적으로 발생하는 특징을 가지고 있다. 이에 본 연구에서는 VE Process의 실효성을 높이기 위하여 품질모델(Quality Model)과 기능분석(Function Analysis)단계에서 이러한 특징을 반영한 개선방향을 제시하고, 수차례 실무 검증을 통하여 적용성 및 효율성을 확인하였다. 이와 더불어 고속도로 VE Job Plan은 고속도로 설계 업무절차에 부합하도록 개선하여 VE 수행효과가 극대화 되도록 제안하였으며, 또한 한국도로공사에서 시행하는 고속도로 대한 VE절차를 "Hi-Value"라 명명하고 실무활용성, 효율성을 확대하고 지속적으로 발전시켜 나아갈 계획이다.

Korean Sentence Classification System Using GloVe and Maximum Entropy Model (GloVe와 최대 엔트로피 모델을 이용한 한국어 문장 분류 시스템)

  • Park, IlNam;Choi, DongHyun;Shin, MyeongCheol;Kim, EungGyun
    • Annual Conference on Human and Language Technology
    • /
    • 2018.10a
    • /
    • pp.522-526
    • /
    • 2018
  • 본 연구는 수많은 챗봇이 생성될 수 있는 챗봇 빌더 시스템에서 저비용 컴퓨팅 파워에서도 구동 가능한 가벼운 문장 분류 시스템을 제안하며, 미등록어 처리를 위해 워드 임베딩 기법인 GloVe를 이용하여 문장 벡터를 생성하고 이를 추가 자질로 사용하는 방법을 소개한다. 제안한 방법으로 자체 구축한 테스트 말뭉치를 이용하여 성능을 평가해본 결과 최대 93.06% 성능을 보였으며, 자체 보유한 CNN 모델과의 비교 평가 결과 성능은 2.5% 낮지만, 모델 학습 속도는 25배, 학습 시 메모리 사용량은 6배, 생성된 모델 파일 크기는 302배나 효율성 있음을 보였다.

  • PDF

A Process Model for Effective Idea Creation and Administration of Value Engineering at Design Phase Activity (설계VE활동의 효과적인 아이디어 창출 및 관리를 위한 프로세스 모델)

  • Kim, Hong-Hyun;Min, Kyung-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.13-21
    • /
    • 2009
  • The ideas created by the execution of Value Engineering(VE) during design phase are usually proposed in a scattered way due to the characteristic of brainstorming. Because of this process, it is likely that similar ideas are proposed duplicatedly, and the created similar overlapping ideas may lead to different analyses and evaluations respectively. The efficient analysis/evaluation of the such similarly created ideas are not easy and the verification of the adequacy and objectivity of the ideas becomes harder and the objective evaluation gets more difficult as well as consumes much time. In spite of the perfect executions of preparatory step for idea creation, the difficulties in managing the similarly created ideas in quantity systematically result in the reduced reliability of the VE activities during design phase. Thus, this study proposes a process model for the efficient idea creation and management of the VE activities during design phase.

A Conceptual Model of Web-based VE Cost Model Analysis System (웹 기반 VE Cost모델 분석 시스템의 개념적 모형)

  • Lee, Chang-Hong;Oh, Chi-Don;Park, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.416-419
    • /
    • 2007
  • In the case of domestic, related information of expenses in order to draw up cost model at the early stage haven't been stored systematically; moreover, similar projects which were accomplished in the past time have lacked data about actual results connected itself. Accordingly, a reliable object hasn't been selected because validity of cost comparing a main function is difficult to dearly decide. Consequently, This study Cost model who can procures and shares and utilizes, studies that is achieved past Cost information of similarity project and achieves in phase zero for target choice of VE activity to systematic and efficient analysis wishes to present conceptional pattern of available Web-Based VE 'Cost model analysis system (Cost Model Analysis System: CMAS)'.

  • PDF

A Proposal of NIA Model for Eco VE Decision of Construction Facilities (건설시설물 친환경VE 의사 판단 모델 NIA 제안)

  • Kim, Joon-Soo;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1377-1385
    • /
    • 2015
  • Construction industry that was the core driving force of Korean economic growth is now being classified as an industry with the largest environmental load emission. Although various efforts were made accordingly to realize eco-friendliness, its effects is insufficient currently. Based on the understanding that eco effect of construction industry would be significant if Eco VE is applicable in the initial project stage, NIA model for understanding the eco VE decision of project owner was developed with simulations in this paper. Based on the proposal report of a private project to develop the Gyeongbuk Northern Region Environmental Energy Town, 20 questions on eco VE decision were used through simulations. The result showed 50% eco-friendly decision. The result of this study can be used to provide decision-making data for eco design in the initial stage of construction by utilizing NIA upon conducting survey research to deduce eco VE decision.

An Effective Function Analysis Application for Construction VE Projects (건설 VE 프로젝트에서 효과적인 기능분석 적용방안)

  • Choi Seok-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.78-84
    • /
    • 2002
  • In VE(Value Engineering) process, function analysis technique is utilized as a stepping stone to induce creative idea. However, function analysis is regarded as the most difficult job for VE team to undertake. For this reason, the function analysis is not properly applied or even omitted in construction VE studies. The current problems of function analysis in construction VE are following: 1) lack of basic understanding of the function analysis as problem solving technique, 2) the sequential step-by-step analysis process, 3) lack of interrelationship between function analysis and other phase in th VE process, 4) lack of time, experience, training, and quantitative data etc. The existing function analysis is faultiness theoretically. However, it is not enough for efficient use in practice, Thus The study aims to suggest an function analysis application method and to develop a computerized FAST(function Analysis System Technique) diagramming model, called Easy-FAST, for the efficient and effective function analysis on construction VE projects.

  • PDF

Construction Cost-Down of Building Substructure by VE Techniques (VE 기법에 의한 건물 지하구조의 공사원가 절감방안)

  • Kim Sun-Kuk;Heo Seong-Soo;Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.125-132
    • /
    • 2005
  • Domestic construction firms make every effort to save cost and, contrarily, enhance quality for competitive advantage in the market. Structural work of building construction takes chaise of the total cost and schedule, thus elaborate planning and management of the work help to lead the project into a successful way. Therefore, the idea to save time and cost and enhance constructability securing quality and safety of the work should be developed after analyzing the designed documents and site conditions comprehensively in the initial construction planning phase. Value Engineering (VE) technique is introduced in the substructural work in this paper to save cost creatively and systematically in the design and construction phase. A practical VE model that is applied to the underground building work systematically is proposed to save cost and it applies to the actual project to confirm the effectiveness of the model.

A Study on the Collaboration of the Function Analysis and Idea Creation Phase with Function Integration FAST(FI FAST) and Hierarchical Value Engineering Concept Modules(HVECM) (통합 기능계통도와 계층적 컨셉모듈을 활용한 기능분석단계와 창조단계의 연계성에 관한 고찰)

  • In, Chi-Sung;NamKung, In-Il;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.355-360
    • /
    • 2006
  • Function analysis and idea creation phase in Value Engineering(VE) Process is applied to manufacturing Industry for developing functions for elements of products, and in construction come to use various components like process, size of project, spaces as well as function itself due to multi-functional aspect. For this reason, VE applications to the construction industry are considered to be less frequent and efficient than to the manufacturing. To resolve this problem, a new technique of Function Integration Fast(HI FAST) and Hierarchical Value Engineering Concept Modules(HVECM) was made for practical integration and sequence of VE job Plan. Two types of function would be defined In this method, first and second function, during the job Plan process, and two function champions be selected for next creation phase process. For verification of consecutiveness of function analysis and idea creation phase for successful VE project implementation, this methodology was tested under design phase in office and IT Multi-functional building project. Make sure the successful application of this process with this method, need to develop the talent of VE experts and team members for process of function analysis and creation phase.

  • PDF

Development of Web-Based VE Supporting System for Effective Workshop (효율적인 VE워크숍을 위한 웹기반 VE지원시스템 개발에 대한 기초연구)

  • Lim, Jongkwon;Kim, Sunghun;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.71-78
    • /
    • 2014
  • Value Engineering methodology was introduced about 30years ago and has significant achievement in Korea. However, many of workshop still focus on cost down process and do not spend enough time on function analysis and expert cooperation. As a result, limited range of creative ideas were produced. To improve effectiveness of VE workshop, this study developed web-based value engineering process and system. And this study applied it to real case study to evaluate effectiveness of proposed system. Developed VE system also provides automated FAST diagram function and decision-making supporting tools. The authors found that this developed web-based VE system can significantly help to save cost and improve performance of VE workshop by using the appropriate VE process, and quick cooperation between experts. In addition, this study shows an example of a VE case study that applies the web-based VE system process, which led to a very innovative and effective way to lead workshop.