A Case Study of Construction Management for Pusan National University Children's Hospital (부산대학교 어린이병원 건립사업 CM 수행사례)

  • Yang, Jin-Kook;Ri, Min-Hyeon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.13-18
    • /
    • 2007
  • The construction by the ministry of health and welfare support of the first special hospital for only children in busan and gyeong-nam is under building with YPNUH(Yangsan Pusan National University Hospital) for the best medical treatment town and is to improve the productivity and efficiency by eliminating unproductive and inefficient fact through the construction management, systemic and scientific management technique. So in this study we would like to suggest the generated effect to apply project management technique to all stage such as from pre-design phase, turn-key enterprise choice, construction, design VE(Value Engineering), PMIS (Project Management Information System) construction to maintenance phase and cost and schedule reduction effect through basic, execution design VE by using engineer of field.

  • PDF

Development of Mobile-Based Design Value Engineering(VE) Supporting System for VE Process Improvement (VE프로세스 개선을 위한 모바일 기반의 설계VE 시스템 개발)

  • Song, Chang-Young;Yang, Byong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.5
    • /
    • pp.433-443
    • /
    • 2021
  • Value Engineering(VE) is an organized effort to create the most value through a functional analysis and creation of alternatives. Depending on the VE job plan, a VE Workshop must be performed in a certain place within a certain period of time. A VE Workshop, which is an organized activity that aims to create the best value through functional analysis and creation of alternatives, should be held in a certain place and at a scheduled time according to the VE job plan. In the Pre-Study, VE Study and Post-Study phases of VE, functional assessments, performance evaluations and idea evaluations are driven by variable management techniques and analysis methods, respectively. Generally, VE is executed for about 3 to 5 days in a particular place to create value. However, there are many problems associated with limiting all VE processes to a specific place and schedule. Moreover, in Korea, VE teams are required to finish all VE processes in a limited time because of the short duration of VE workshops, the necessity of which has been overlooked. Therefore, an efficient VE support system is required to resolve the problem of time and space limitations. In this study, a VE support system based on the Mobile environment was developed to support the VE Workshop process. This VE support system enables participants to review design documents, drawing sheets and all VE-related documents using mobile devices. After the Workshop, participants can conveniently rearrange the result(evaluation of function and ideas) at the workshop. Not only can the members of VE team can review the design documents, drawing sheet and all VE-related documents in the step before the workshop, but also the result(evaluation of function and ideas) of the workshop can be easily rearranged in the phase after the workshop under the developed supporting system using mobile devices.

A Study on the Development of Web Based VE Management System (웹기반 VE 관리시스템 개발)

  • GOH IL-DU
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.143-148
    • /
    • 2001
  • Digital documentation is now becoming a must throughout a building process including design, construction, inspection, procurement and even facility management. The Internet is a backbone of such process, and web-based information exchange is the standard among other mainstream technologies. The current information management techniques, however, is heavily dependant on the server-side processing, which naturally results in the overload of the overall system. This paper proposes an XML-based approach in order to resolve such problems. A VE system was developed to demonstrate the efficiency of the XML solution, in term of efficient VE data management and fast decision making. also in this paper suggests 1) introduce XML based DBMS to improve data management efficiency and 2) introduce Mobile Computing to improve data accessibilities on sites.

  • PDF

Construction Cost-Down of Building Substructure by VE Techniques (VE 기법에 의한 건물 지하구조의 공사원가 절감방안)

  • Kim Sun-Kuk;Heo Seong-Soo;Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.125-132
    • /
    • 2005
  • Domestic construction firms make every effort to save cost and, contrarily, enhance quality for competitive advantage in the market. Structural work of building construction takes chaise of the total cost and schedule, thus elaborate planning and management of the work help to lead the project into a successful way. Therefore, the idea to save time and cost and enhance constructability securing quality and safety of the work should be developed after analyzing the designed documents and site conditions comprehensively in the initial construction planning phase. Value Engineering (VE) technique is introduced in the substructural work in this paper to save cost creatively and systematically in the design and construction phase. A practical VE model that is applied to the underground building work systematically is proposed to save cost and it applies to the actual project to confirm the effectiveness of the model.

A Study on the Improvement for Design VE Job Plan through the Benchmarking (벤치마킹을 통한 설계VE 추진절차 개선에 관한 연구)

  • Um Ik-Jun;Jung Young-Il;Kim Chul-Woong;Hyun Chang-Teak
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.88-95
    • /
    • 2001
  • To convert the construction industry from 'the high cost, the low efficiency' to 'the low cost, the high efficiency and value-added industry' and to enhance the performance and quality of products while reducing the cost, the related law and guideline were established and promulgated, which regulate that value engineering workshop during the preliminary design and the detail design stage should be a mandatory process. But VE practitioners are still confusing in choosing the proper value engineering process, because processes those are described in the various references use the different terms, steps and activities, even though they have their own specific characteristics. To resolve these confusions, the existing steps and activities of three kinds of the literature, four kinds of the organization's policy and other four kinds of study examples relating to the design VE were examined. And then, the differences and expecting problems were extracted through the comparison and analysis of those materials. After that, VE specialists' opinion through the questionnaire survey were grasped. Based on those studies the improved design VE Job Plan and activity statements were suggested.

  • PDF

A Case Study on Value Improvement through applying VE Method in Stage of Railway Construction (시공 VE기법을 적용한 철도구조물의 가치향상 사례 연구)

  • Cho, Ki-Yon;Park, Mi-Yun;Kim, Sung-Hun;Seo, Jong-Won
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.23-29
    • /
    • 2008
  • Most VE operation related to construction project is progressed in stage of planing or design phase, especially in case of domestic. It is encouraging fact and if you have VE process in stage of planning and design, you'll have experience a reduction of about 70% of total saving cost in which total construction process may occurred. However, recently the work of construction in overseas increase and almost is only construction-work, except planning and design process. As this reason, VE process for construction-work phase only is demanded in high necessity. VE in construction phase comes to accomplish intensively in the part which the design change does not follow, through know-how, equipment operating method and method of temporary-structure erection at the established construction-site learned, builders will be the possibility of reduction from 3% to 10% in constructive expense. This paper describes VE performing example in OO company's construction-work phase, and propose the methodology of VE performance in the phase of construction. And also it is aimed to extending VE applications into the overseas construction enterprise.

  • PDF

A study on the improvement in decision making analysis for the selection of tunnel construction method (터널건설공법 선정을 위한 의사결정기법의 개선방안 연구)

  • Park, Jun-Kyung;Jun, Sung-Kwon;Kim, Young-Keun;Heo, Eun-Nyeong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.4
    • /
    • pp.261-276
    • /
    • 2002
  • Recently, for the purpose of choosing reasonable and economical construction, the decision making analyses, such as VE (Value Engineering) and LCC (Life Cycle Cost), are generally performed. But, these methods have some limitations for the application to subway tunnel construction method. So, the AHP (Analytical Hierarchy Process) analysis is applied to determine relative importance for obtaining objectivity in quantitative analysis. And, the LCSC (Life Cycle Social Cost) method is developed to account for the social loss and risk by tunnel construction. From the case of the subway ${\bigcirc}{\bigcirc}$ lot, those methods are very useful to decision making analysis. And, in that case, both quantitative and quantitative analysis appraisement, the drilling and blasting method is evaluated useful alternative proposal in comparing with the cut and cover method.

  • PDF

Process Development and Verification for Construction VE Object Selection of Performance-Oriented (성능중심의 건설VE 대상 선정 프로세스 개발 및 검증)

  • Kim, Soo-Yong;Yang, Jin-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.25-32
    • /
    • 2012
  • The current VE activity is recognizing the VE object selection in job-plan simply as formal procedure. Therefore, many problems are happening in the process of selecting VE object during the preparatory stage. As a result of trying to analysis problems through literature review and expert interview, the problems were surveyed such as the lack of connectivity between preparatory stage and analytical stage, the temporal cost-based restrictions, and lack of recognition in VE team members in the existing method of selecting subjects centering on the high-cost field. Accordingly, this study suggested the improved method of selecting VE objects in order to solve this problem in the stage of selecting VE objects. An improvement method of selecting VE objects is what selects the secondary VE subjects by applying again Fish-Bone diagram and Worth technique based on the primary VE objects, which were selected by the conventional technique of selecting objects in the high-cost field. To verify effectiveness in the proposed improvement method, it tried to apply it to the actual case of the road construction VE project. As result of, the improvement method was analyzed to be considerably effective in comparison with the existing selection method of VE objects. Therefore, the Improvement method will contribute to increasing the VE performance.

The Application of VE Technique for the Economizing Resources (VE기법 활용으로 자원절약)

  • 강성호;임경수
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.1 no.1
    • /
    • pp.27-35
    • /
    • 1978
  • Since we have been discussing tile relationship of economizing at this paper. Value engineering (VE), as the term is generally understood, is concerned with reducing the cost of units or equipments which go into production. Until recently, our immediately problems of resources has been a short-term strategy. But due to the shortage of resources, our chief raw materials depend on the importation. In order to cope with such a present problems, first of all the policy of economizing resources by which the loss of materials can be minimized, and resources can be applied to more effectively, should be advanced to all things. Therefore, as the method of policy for the long tel.m for the sake of the use of resources, and as VE technical method can be assured in resonablity, it can be established of permanent organization (VE Team).

  • PDF

A Study on Competency Evaluation Item of Design Phase VE Team (설계VE팀의 역량 평가항목에 관한 연구)

  • Seo, Ha-Na;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.797-800
    • /
    • 2007
  • Value Engineering(VE) is being applied as an useful tool to eliminate the waste of cost and noneffective factors previously in construction projects. Ministry of construction and transportation' has been accordingly enforcing extensionally design phase VE to the construction costing more than 10 billion won, an importance of design phase VE. Although there are legal supports and technical effects, an effect about an introduction of design phase VE can not be applied properly because of several problems at the process. So, in this study, try to find out competency factors of design phase VE to enforce a competency of VE team as a basic database for developing a check list, and estimate weight. For the result, find out a competency evaluation item and organize as a team knowledge, a team work skill and a team attitude. Perform a first survey to verify a reliability and propriety regarding the found competency evaluation, perform the second survey competency as to evaluation item of the found 1, 2, 3 class and then estimate the weight by AHP.

  • PDF