• Title/Summary/Keyword: V-line

Search Result 2,153, Processing Time 0.026 seconds

765kV Steel Tubular Tower Design On Considering Stringing Load (가선작업 하중을 고려한 765kV 강관철탑 설계)

  • Jung, Tay-Ho;Kim, Shin-Chul;Yoon, Young-Soon;Shin, Tae-Woo;Lee, An-Keun;Kim, Kwang-Youl
    • Proceedings of the KIEE Conference
    • /
    • 1998.11c
    • /
    • pp.935-937
    • /
    • 1998
  • The stringing load was added to tower design that consider the active load in 765kV transmission line construction. The nominal auxiliary members of steell tubular tower arm were altered into stress members by means of three dimensional design analysis method. 765kV transmission line construction also use self-standing tower that does not install temporary wire which support the section tower placed between drum field and engine field when stringing process.

  • PDF

Analysis of the electrostatic induction voltage and electromagnetic induction current on the Parallel Circuit in 765kV Double Circuit Transmission Line (765kV 2회선 송전선로를 765kV 및 345kV로 병행운전시 유도현상 예측)

  • Woo, J.W.;Shim, E.B.;Kwak, J.S.;Jeon, M.R.;Kim, K.I.;Kim, T.O.
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.169-171
    • /
    • 2002
  • The western route of KEPCO's 765kV transmission line has been tentatively operating as 345kV voltage before commercial operation. After finishing the test operation of 765kV substation in 2002. KEPCO decided to operate the 765kV line for commercial operation. During the applying of 765kV voltage to the transmission line, double circuit transmission line will be operated with two voltage grades of 765kV and 345kV. Because the earthing switch is installed on both end of transmission line, we had estimated the electrostatic induction voltage and electromagnetic induction current before the line energizing in order to confirm the ratings of earthing switch. The induced voltage and current is very important for the maintenance of parallel circuit. This paper describes the simulation study of electrical phenomena such as electrostatic induction voltage from the parallel line and electromagnetic induction current from the parallel circuit. The transmission line model was developed by EMTP (Electro-Magnetic Transient Program).

  • PDF

Prediction and Measurement of Induction Phenomena in the 765 kV Double Circuit Transmission Line operated with two voltage grades (765 kV 송전선로에서의 이종 전압등급 병행 운전시의 유도현상 예측 및 실측 결과)

  • Kwak, J.S.;Kang, Y.W.;Shim, E.B.;Jeon, M.R.;Woo, J.W.;Bang, H.G.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.208-211
    • /
    • 2003
  • The western route of KEPCO's 765 kV transmission line has been tentatively operating as 345 kV voltage before commercial operation. KEPCO decided to operate the 765 kV line for commercial operation after completing the test operation of 765 kV substation in 2002. In the process of energizing the line as 765 kV voltage, double circuit transmission line will be operated with two voltage grades of 765 kV and 345 kV. As the earthing switches are installed on both ends of the line, electrostatic induction voltage and electromagnetic induction current were calculated prior to the line energizing in order to confirm the ratings. The induced voltage and current are important for the maintenance of the parallel circuit. This paper presents the simulation results of electrical phenomena such as electrostatic induction voltage and electromagnetic induction current from the parallel line. The transmission line was modeled by EMTP (Electro-Magnetic Transient Program). The simulation results were compared with the measured results at the field.

  • PDF

Development a computer system to support the route selecting and surveying of a transmission line (송전선 설계지원 SYSTEM의 구축)

  • Jung, Tay-Ho;Kim, Shin-Chul;Lee, Chong-Soo;Kim, Choon-Gu;Kang, Hee-Kwon;Kim, Jung-Ho
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.831-833
    • /
    • 1998
  • It is getting more difficult to construct new transmission lines, due to the increase of people's demand resulting from the change of social environment and people's consciousness. In order to solve these complicated conditions. we developed a computer system to support the route selecting and surveying of a transmission line. This paper introdouces the methodology for route selecting, designing, surveying of a transmission line and tower designing process using a computer system.

  • PDF

Unbalanced Power System Analysis in 765/345kV Parallel Transmission Line by Using EMTDC (EMTDC를 이용한 765/345kV 병가선로의 불평형 계통 해석)

  • Kim, Jong-Yul;Yoon, Jae-Young;Choi, Heung-Kwan;Lee, Woon-Hee
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.199-201
    • /
    • 2003
  • Because of Korean power system characteristics and increasing power demand, the need of 765kV transmission line is growing gradually. Now a days, KEPCO's 765kV transmission line has been tested and stands for commercial operation. During the first stage, 765kV transmission line will be operated with two voltage grades of 765kV and 345kV, which results the unbalance of power system. So unbalanced current such as zero sequence current flows in the transmission line. In this paper, we describes the simulation study of 765/345kV parallel transmission line by using EMTDC program.

  • PDF

CLASSIFICATION OF THE EQUIVARIANT LINE BUNDLES OVER $S^1$ (원 위에서의 EQUIVARIANT LINE BUNDLE 의 분류)

  • Kim, Seong-Suk
    • The Journal of Natural Sciences
    • /
    • v.5 no.1
    • /
    • pp.1-3
    • /
    • 1992
  • G가 compact Lie 군이고 $\pi$ : $E to S^1$$S^1$ 상의 G-line bundle 일때, 군 작용이 없다면, 부드러운 trivial G-line bundle $E to S^1$ 은 S(V) $\times$ $\delta to S(V)$ 와 동치이고 부드러운 nontrivial G-line bundle $E to S^1$ 은 S(V) $\times$$z_2$ $\delta to S(V)$/$Z_2$=P(V)와 동치 이다.

  • PDF

New Line Coding of Visible Light Communication System for WPAN (WPAN용 가시광 통신 시스템의 새로운 라인코딩)

  • Kim, Jin-Young;Choi, Jae-Hyuck;Sang, Cha-Jae
    • Journal of Broadcast Engineering
    • /
    • v.14 no.1
    • /
    • pp.70-80
    • /
    • 2009
  • We propose an ideal line coding for high speed data communication in visible light communication system. B4-HBT line coding is defined as follow. The 1 bit is +V at first though 1 encodes +Voltage and -Voltage doing change of shift each other, then -V newly. V that is been mutually contradictory for 1 bit that exist before that if continuous 0 bits exist 4 here same and reduces mistake because has reverse mark V in 4 continuous last 0 bits and gives half bit variation in 1 bit and made effect of noise low. 2${\sim}$3 dB profit is seen comparing with line coding that exist in simulation result.

Study on Electrical Environmental Obstacle Using a 765kV Double Circuit Test Line (765kV 시험선로를 이용한 전기환경장해 특성연구)

  • Kim, Jeong-Boo;Jo, Seong-Sae;Shin, Goo-Yong;Lee, Dong-Il;Yang, Kwang-Ho;Ahn, Hee-Sung;Bae, Jeong-Hyo;Koo, Ja-Yoon;Min, Seok-Weon
    • Proceedings of the KIEE Conference
    • /
    • 1994.07b
    • /
    • pp.1517-1519
    • /
    • 1994
  • This paper describes electrical environmental study of a 765kV double circuit test line. Corona performance on several candidate conductor bundles has been investigated in the corona cage (single phase simulation facility) since 1984. We have known that six RAIL conductor bundle is the most suitable for the 765kV transmission Line, [3] To investigate electrical environmental impact of the future commerciale line, we build a full sacle 765kV test line in 1993. The test results of Audible Noise, Radio Interference, TV Interference from August, 1993 to Jan. 1994 were measured as $48.7[dBA](L_{50})$. $57.4[dB{\mu}V/m]$(Fair weather, $L_{50})$. $14.5[dB${\mu}$V/m]$(Fair weather, $L_{50}$). We have found that the Audible Noise data were very close to the predicted(48.5 [dBA]) by BPA Corona and Field Effects Computer program, however, the RI and TVI data were much higher than predicted(42 [dBmV/m], $7.9[dB{\mu}V/m)$ by the BPA program. We have investigating the reason of the difference. In the constructing of full scale test line, we developed the tubular tower, 765kV test transformer and hardwares of 765kV transmission line insulator strings. Also we will investigate the effects of plants under the 765kV test Line.

  • PDF

Predicting formula development of audible noise on a 765kV AC transmission line(I) (765kV 교류 송전선로의 가청소음계산 예측식개발(I))

  • 이동일;구자윤
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.45 no.4
    • /
    • pp.612-615
    • /
    • 1996
  • Audible noise from corona discharge had been identified as one of the most important factors in the design of conductor configurations for high-voltage transmission lines. 500kV and above. Therefore this paper describes audible noise characteristics of 6 X 480mm conductor bundle in KEPRI 765kV Test Line and Corona Cage. Prediction formula for audible(corona) noise on a 765kV transmission Line was developed using this results.

  • PDF

Analysis of Electrical Safety Level Test for Barehand Work at 765kV Vertical Double Circuit Six Bundle Conductors on the Suspension String Tower Type (765kV 수직2회선 6도체 현수형 철탑에서 직접활선작업의 안전성 평가분석)

  • Kim, Dae-Sik;Han, Sang-Ok
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.57 no.3
    • /
    • pp.275-278
    • /
    • 2008
  • It has been issued that the necessity of Live line work for 765kV vertical double circuit six bundle conductors transmission line when the characteristics of transmission line, the composition of T/L and near the T/L circumstances etc. Others are considered. The Barehand method of UHV T/L is extremely dangerous work and especially it is directly related with lineman life so it is very dangerous. It should be performed several technology developments for live-line work on the UHV T/L, that should be considered such as the electrical influence on workers near the T/L, development of live-line facilities, guarantee of safety, the technical rules of live-line work, the safe method of live-line work and etc. In order to maintain the 765kV transmission lines safely by barehand work, first of all, we should know the analysis of electrical safety level test in live-line work at 765kV vertical double circuit six bundle conductors on the suspension string tower type.