Recent development trend of construction projects in the urban area is the efficient use of insufficient land, however caused to difficult construction conditions because of many adjacent structures. This paper presents the case study that analyzed the ground settlement of railroad structure for the double track railway project of Gyeongui line, adjacent to the high rise building under ground excavating for substructure work, considering interaction of soft ground characteristics. Field survey and measurement works were carried out during construction of station and excavation of high rise building, and field data were analyzed to find the source of settlement of platform and railway. In addition, the soil reinforcement and foundation restoration were performed using in-situ injection method, i.e., D-ROG(Digitalized Restoring On Grout) method which filled the pore of bottom and around of foundation with micro-cement.
Environmental impact is getting more attention in many feasibility studies for railroad-related projects and research items. For sustainable growth and green transportation, the benefits typically used for feasibility studies in railway-related projects, are composed mostly of economic criterions which is not considering growing attention on changing paradigm. Based on the analysis of current methodologies, improvements in estimating environmental impact especially on noise and pollution are suggested. Active steering bogie has been proposed to satisfy stabilizing and steering performance of railroad. This paper describes the feasibility study of the active steering bogie for a urban railway vehicle based on environment-related criteria.
In express operation plans for urban trains, it is effective for the reduction of the number of sidetracks to apply a high performance train that has improved acceleration/deceleration ability and a regular train to local and express trains, respectively. In this research, based on a plan to use a high performance train for a local train, an optimization methodology is suggested to reduce the number of sidetracks and the operation time of the local train simultaneously. The optimization solver applied in this research is a genetic algorithm; headway, location of sidetrack and waiting time at the sidetrack are considered as design variables in the optimization problem. Consequently, by applying this system to Seoul metro line no.7, the effect of the suggested methodology was verified by obtaining the proper optimum solution.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
v.1
/
pp.383-386
/
2006
The safety of the railway system is important because the system is a mass transit system and the results of the accident are inconceivable. The railway system is operated by train operation system such as train control system. So the train control system requires safety critical characteristics. In the European railway, ETCS (European Train Control System) project has been finished to accomplish the interoperability of each national railway signaling system. According to the interoperability degree, ETCS levels are suggested. As the highest level, ETCS level 3 suggests a radio communication. Also recently urban railway system is operated by driverless and automatic train control system. In this circumstance, more safety is required than before in the railway system. In order to accomplish the safety of a system, the requirements considering safety have to be suggested. The requirement is a set of several functions such as general function, environment, safety etc. For the safety critical system, safety function is more important than any other functions. The safety functions are deduced by safety analysis. In order to perform the safety analysis, the system hazards have to be identified and then risk analysis for each hazard should be performed. The risk is related to the frequency and the severity of each hazard. And then countermeasures for each risk have to be prepared. The summary of the countermeasures is about a kind of safety functions in a system. In this paper, the safety functions for a train control system are presented according to the above procedure.
This study establishes a numerical analysis model of the finite element overhung rotor supported by a DTRB and describes the stiffness properties of the DTRB. The vibration characteristics and contact pressure of the RBR system are predicted according to the DTRB support characteristics such as the initial axial compression and roller profile. The stiffness of the DTRB significantly varies depending on the initial axial compression and external load owing to the occurrence of rollers under the no-load condition and increase in the Hertz contact force. The increase in the initial axial compression increases the rigidity of the DTRB, thereby reducing the displacement of the RBR system and simultaneously increasing the natural frequency. However, above a certain initial axial compression, the effect becomes insignificant, and an excessive increase in the initial axial compression increases the contact pressure. The roller crowning radius, which gives a curvature in the longitudinal direction of the roller, decreases the displacement of the RBR system and increases the natural frequency as the value increases. However, an increase in the crowning radius increases the edge stress, causing a negative effect in terms of the contact pressure. These results show that the DTRB support characteristics required for reducing the vibration and contact pressure of the RBR system supported by the DTRB can be designed.
The Journal of the Korea institute of electronic communication sciences
/
v.10
no.8
/
pp.851-860
/
2015
Transport Social Overhead Capital refers to public utilities necessary for a nation's basic economic activities, and is divided into roads, railway, subway, ports and so on. It is important to be able to provide these SOC in the right place at the right time to enhance productivity and competitiveness of a nation. In this study, correlation and factor analysis on countries' socioeconomic and transport indicators were performed in order to understand the need for expansion of SOCs including railway, and to identify the impact they have on national competitiveness(productivity). As a result, GDP showed high correlativity(0.59~0.99) with factors such as population, land area, extension of available railroad, and road extension. Specifically, through the analysis of Russia's urban transport system and comparison between socioeconomic indices and SOCs of OECD countries, it was examined that how increasing transport infrastructure investments could enhance national competitiveness. In conclusion, opening new Light Rail greatly affects the growth of GDP followed by the increasing extension of available railroad. Furthermore, if available railroad extension is increased by 10 % from 2014, assuming high speed tram is opened, GDP will likely increase by 21.6%.
Lee, Kwang-Sub;Lee, Chan Woo;Yang, Keun-Yul;Min, Jae Hong;Shin, Jong Jin
Journal of the Korean Society for Railway
/
v.19
no.1
/
pp.77-86
/
2016
Before urban railway vehicles reach their design life-span, operating agencies should determine when to buy new vehicles. Previous LCC (Life Cycle Cost) studies were limited because they independently focused on existing vehicles based on costs that directly impacted only the operating agency without considering effects such as social costs and the reduction of maintenance costs. Thus, it is difficult to systematically determine when to buy new vehicles. This study investigated the operating and maintenance related costs, especially from additional expenses and social costs due to unexpected vehicle failures and safety accidents, and did an economic analysis of scenarios with different discount rates. Considering that the public is very concerned about safety after the Sewol ferry accident, additional costs, which include social costs, should be included in the analysis. This study shows that the economic priority of scenarios may change depending on whether those costs are included and on the discount rate. The results of this study can help in the decision-making process for the planning and buying of new trains.
Journal of the Korean Society of Environmental Restoration Technology
/
v.19
no.2
/
pp.95-107
/
2016
The gold-spotted pond frog(Pelophylax chosenicus) classified as an Anura in Amphibia is sharply decreasing due to various changes of habitats environment, and designated as IUCN Red List Threatened species(VU; Vulnerable) internationally and domestic endangered species Class-II; therefore, it's in urgent need of the research on habitats restoration of the gold-spotted pond frog in order to prevent its extinction. This study was carried out to verify the effect after restoration by introducing the inhabitation elements deducted by the literature research and a field survey on the habitats for the gold-spotted pond frog in danger of regional extinction in the urban area of Ansan city, Gyeonggi-do, Korea. Accordingly, the capacity for bio-species was increased by expanding the area of habitats into $11,845m^2$, and securing the place for hibernation and corridors and discharge within the habitats, etc. As a result of the monitoring the number of individuals increased by 9.5 times as the reproductive success rate of the gold-spotted pond frog got higher, and by virtue of improvement in the habitats, biodiversity increased to 183 species(4 species of amphibians and reptiles, 4 species of mammals, 17 species of birds, 53 species of insects(terrestrial/Benthic), 4 species of fish, and 102 species of plants). It might be possible to verify the restoration effect of the habitats through continuous monitoring, and suggest the restoration model on the habitats for continuously survivable the gold-spotted pond frog in the urban area by deducting the matters to be improved.
Mo, Chun Suk;Kim, Si Gon;Kwon, Young Jong;Kang, Kap Seang
KSCE Journal of Civil and Environmental Engineering Research
/
v.35
no.4
/
pp.969-975
/
2015
In this paper, we review the regulations relating to railway safety and station workers interviewed, eight urban rail accidents decreased operating agencies through the prevention research currently being conducted into the (Seoul Metropolitan Rapid Transit Corporation City, Seoul Metro, Incheon traffic mortality, etc.) the root cause for the lack of aggressive prevention measures performed on the difficulties related regulations, organizational culture and work environment, prevention of negative operating authority derived in three improvements were obtained through this direction. First proposed urban railway safety ever buy Conduct production, utilization and operating agencies college safety assistant suggests directions for safety training, organizational culture and work environment improvements in senior management. Finally, active accident prevention campaigns, and provide direction to increase the educational participation of guests. Improvement for such accidents would decrease is thought to play a role in the prevention of future operating agency established when the guidelines.
Transactions of the Korean Society of Automotive Engineers
/
v.13
no.5
/
pp.7-18
/
2005
Over the past twenty years, the maintenance system has been developed and its importance has been increased. For the effective maintenance of the urban transit, we have developed the maintenance system based on the concept of RCM(Reliability Centered Maintenance). RCM analysis is a systematic approach to developing a cost-effective maintenance strategy based on the various components's reliability of the system in question. It is performed according to process that includes the following steps; definition of function and functional failures of the systems, construction of RB D(Reliability Block Diagram), performance of FMEA(Failure Modes & Effects Analysis) and calculation of the reliability index. The final process of RCM is to determine appropriate failure maintenance strategies. This paper aims to define the procedure of maintenace based on the concept of RCM for urban transit. The key for a successful maintenance system is an automated scheduling to the maximum extent possible and timely executions. The developed system issues maintenance plan and repair request based on analyzed data and maintenance experience.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.