• 제목/요약/키워드: Uplift of contact wire

검색결과 11건 처리시간 0.032초

고속카메라를 이용한 전차선 압상량 검측 시스템 개발 (Development of an Uplift Measurement System for Overhead Contact Wire using High Speed Camera)

  • 박영;조용현;이기원;김형준;김인철
    • 한국전기전자재료학회논문지
    • /
    • 제22권10호
    • /
    • pp.864-869
    • /
    • 2009
  • The measurement of contact wire uplift in electric railways is one of the most important test parameters to accepting the maximum permitted speed of new electric vehicles and pantographs. The contact wire uplift can be measured over short periods when the pantograph passes monitoring stations. In this paper, a high-speed image measurement system and its image processing method are being developed to evaluate dynamic uplift of overhead contact wires caused by pantograph contact forces of Korea Tilting Train eXpress (TTX) and Korea Train eXpress (KTX). The image measurement system was implemented utilizing a high-speed CMOS (Complementary Metal Oxide Semiconductor) camera and gigabit ethernet LAN. Unlike previous systems, the uplift measurement system using high speed camera is installed on the side of the rail, making maintenance convenient. On-field verification of the uplift measurement system for overhead contact wire using high speed camera was conducted by measuring uplift of the TTX followed by operation speeds at the Honam conventional line and high-speed railway line. The proposed high-speed image measurement system to evaluate dynamic uplift of overhead contact wires shows promising on-field applications for high speed trains such as KTX and TTX.

전차선 압상 검측을 위한 시스템 기술 (The Technology of Measurement System for Contact Wire Uplift)

  • 박영;조용현;김형철;권삼영;김인철;최원석
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.900-904
    • /
    • 2009
  • The measurement of contact wire uplift in electric railway is one of the most test method to accept the maximum permitted speed of new vehicles or pantographs. The contact wire uplift can be measured for shot periods when pantograph is running in monitoring station. This paper describes the development of two different methods for contact uplift measurement using vision-based system and wireless online monitoring system. Our vision-based system employs a high-speed CMOS (Complementary Metal Oxide Semiconductor) camera with gigabit ethernet LAN. The development of a real-time remote monitoring system that acquires data from any kind of sensor to be transmitted by wireless communication from overhead line and structure at 25 kV to a computer in catenary system. The proposed two kind of different measurement systems to evaluation for dynamic uplift of overhead contact wire shows promising on-field applications for high speed train such as Korea Tilting Train (TTX) and Korea Train eXpress (KTX).

  • PDF

터널구간 팬터그래프와 전차선간 동적성능 검측장치 구현 (Implement of Dynamic Performance Measurement System Between Pantograph and Contact wire in Tunnel)

  • 박영;박철민;이기원;권삼영
    • 전기학회논문지
    • /
    • 제61권11호
    • /
    • pp.1732-1736
    • /
    • 2012
  • To increase speed up of train, in the field of catenary system, it is necessary to develop of new monitoring methods for dynamic interaction between pantograph and contact wire. Also, there is a need to develop technologies that constantly measure are from various railway structure such as uplift of contact wire, vibration of catenary, dynamic strain of contact line in tunnel. In this paper condition monitoring systems for dynamic performance of catenary systems in tunnel were proposed. An advanced method and results of field tests using high speed camera for monitoring of vertical upward movement of the grooved contact wire due to the force produced from the pantograph were presented. The proposed uplift measurement system of contact wire is expected to enhance precision of current collection quality performance assessment methods at high-speed lines.

KTX 주행시 전차선 압상량 측정 결과 (Measured Data of the Contact Wire Uplift Amount at KTX running)

  • 권삼영;조용현;이기원;안영훈
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.1372-1377
    • /
    • 2004
  • The contact wire uplift amount was measured for the conventional and the high speed catenary during KTX dynamic test period. The contact wire uplift amount is considered as a important parameter in determining and designing of the specific catenary. The measurements were conducted in wayside and onboard of KTX through the high speed camera and the current collection video monitoring system installed in KTX roof. This paper describes the measured results.

  • PDF

속도향상에 따른 열차속도와 전차선 파동전파속도에 대한 실험적 연구 (A Experimental Study on Train Speed and Wave Propagation Speed of Contact Wire according to the Speed-up)

  • 이기원
    • 전기학회논문지
    • /
    • 제62권12호
    • /
    • pp.1820-1823
    • /
    • 2013
  • An overhead catenary system is the one of the main subjects for increasing speed in electric railway. When a vehicle increases the speed over 350km/h, vibrations and wave propagation reflections occur severely. Therefore, the system suitable for the speed are needed. A wave propagation speed of contact wire is the main criteria to determine the tension for the system. Therefore, a train speed is restricted below 70% of wave propagation speed of it in European railway code. In this study, we measured a strain and uplift of contact wire while HEMU-430X tain is operated for the speed-up trial test in Kyungbu high-speed railway. The measured strain and uplift are analyzed with wave propagation speed according to the speed-up. The more a train speed reaches to a propagation speed, the more measured strain is high. Through the study, an experimental approach is performed about the code which a train speed is restricted below 70% of wave propagation speed of it.

도시철도 교량구간의 전차선 압상량에 대한 안전성 연구 (A study on the safety about Contact wire uplift of a metro-railroad bridge section)

  • 장우진;조용현;이기원;소선영;박종학;이재봉
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.821-831
    • /
    • 2006
  • There are 5 railway bridges in a Seoul metro network; Jamsil, Dangsan(line 2), Dongho(line 3), Dongjak(line 4) and Chungdam(line 7). Because there are strong wind and vibration in the bridges, uplift of a contact wire caused by pantographs in the bridge section is higher than in a normal section. If the uplift at the support point exceed 10 cm, an interference between pantographs and catenary system happens. Estimated maximum uplift is obtained by applying safety factor 2 to the simulation results. The application of the safety factor is needed for taking into account of the effect of the wind, etc. Previously, we can not check whether or not the safety factor is proper. Recently, we can measure the uplift during the train operation, as a telemetry system which can measure dynamic behavior of the contact wire has been developed. The aim of this research is to review how proper the safety factor related to the uplift is, based on the measurement. We performed simulations and experiments for the uplift at the Jamsil railway bridge. The simulations were performed for the every kind of the train passing the Jamsil bridge. In order to compare the analysis results with the measurement results, we measured the uplifts at the support when the trains passed the measuring point. Finally, we proposed adequate safety factor with the uplift for the bridge section.

  • PDF

전차선 압상량 검출을 위한 최적 시스템 구현 (Implementation of Optimization of the Uplift Amount Measurement System of Overhead Contact Line)

  • 박영;이기원;박철민;권삼영
    • 전기학회논문지
    • /
    • 제62권6호
    • /
    • pp.886-890
    • /
    • 2013
  • Uplift of contact wire and dynamic characteristics between pantograph and contact wire are key interaction performance of OCS (Overhead Catenary System). These two evaluation items are the approval criteria for the performance between OCS and pantograph. A telemetry system or DAQ (Data Acquisition) System based on wireless communication make it monitor a dynamic behavior which is measured directly in a 25 kv like parts. While permissible working time is too short time to install is too long. In this paper, it is described that optimization the telemetry measurement system for OCS and increasing accuracy, easy adaptation, and faster handling can be also achieved through the study.

집전시스템의 동적 수치모의 해석에 관한 연구 (A Study on a dynamic simulation of Current Collection System)

  • 허신;경진호;;송달호;박성훈;김정수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 1999년도 춘계학술대회 논문집
    • /
    • pp.151-158
    • /
    • 1999
  • In this study, we developed the simulation program of an overhead catenary-pantograph system, The overhead catenary is modeled with point mass and the pantograph is replaced with 3 d. o. f. model which is composed of mass, spring and damper. Using the developed program, we analyzed the static structure of the overhead catenary and the dynamic characteristics of an overhead catenary-pantograph system such as uplift displacement of contact wire and contact force. we compared the analysis results with the results of GASENDO software developed at RTRI in Japan. The behaviors of uplift displacement of contact wire and contact force were similar with the results of GASENDO software.

  • PDF

상태감시시스템을 이용한 팬터그래프-전차선로 동특성 분석에 관한 연구 (Analysis for the dynamic responses of pantograph-overhead contact line coupled system by using a condition monitoring system)

  • 조용현;박영;이기원;권삼영;박현준
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2008년도 춘계학술대회논문집
    • /
    • pp.778-781
    • /
    • 2008
  • The aim of this paper is to analyze the dynamic responses of pantograph-overhead contact line coupled system by using a condition monitoring system. The monitoring items are strain, vertical displacement and acceleration of a contact wire. Both strain and vertical displacement in the contact wire depends on uplift force and train velocity. Measurement of acceleration shows that the passage of the pantograph gives an impact force to a hard point on a contact wire.

  • PDF

고속전차선로의 시공 허용오차가 집전성능에 미치는 영향에 관한 연구 (A Study on the Effects of Construction Tolerances on the Current Collection Performance for High Speed Catenary System)

  • 김태훈;서기범;박재영
    • 전기학회논문지
    • /
    • 제64권12호
    • /
    • pp.1782-1788
    • /
    • 2015
  • In this paper, analysis of the effects for construction tolerances on the current collection performance of high speed catenary system. The height of the contact wire is the geometrical position of the cantilever directly affects the current collection performance. Contact force when the height of the contact wire exceeds the construction tolerance were analyzed. As a result, the maximum contact force was analyzed to more than 350[N] that are recommended by EN50119. And when the geometrical position of the cantilever to exceeds the construction tolerance, the analysis results of uplift at the mast support points, it becomes 127[mm] that are recommended by UIC 799. If the construction tolerances exceeds the reference value, the current collection performance is deteriorated. Therefore, catenary system require high precision construction. In the future, there is a need for continuing research on the tolerance of catenary system in the actual operating state.