• Title/Summary/Keyword: Unplanned Scrams with Complications

Search Result 1, Processing Time 0.014 seconds

A FEASIBILITY STUDY ON THE ADVANCED PERFORMANCE INDICATOR CONCEPT FOR IMPROVING KINS SAFETY PERFORMANCE INDICATORS (SPI)

  • Lee, Yong-Suk;Cho, Nam-Chul;Chung, Dae-Wook
    • Nuclear Engineering and Technology
    • /
    • v.43 no.2
    • /
    • pp.105-132
    • /
    • 2011
  • The concept of improved performance indicators (PIs) for use in the KINS Safety Performance Indicator (SPI) program for reactor safety area is proposed in this paper. To achieve this, the recently developed PIs from the USNRC that use risk information were investigated, and a feasibility study for the application of these PIs in Korean NPPs was performed. The investigated PIs are Baseline Risk Index for Initiating Events (BRIIE), Unplanned Scrams with Complications (USwC), and Mitigating System Performance Index (MSPI). Moreover, the thresholds of the existing safety performance indicators of KINS were evaluated in consideration of the risk and regulatory response to different levels of licensee performance in the graded inspection program.