A FEASIBILITY STUDY ON THE ADVANCED PERFORMANCE INDICATOR CONCEPT FOR IMPROVING KINS SAFETY PERFORMANCE INDICATORS (SPI)

  • Received : 2010.02.17
  • Accepted : 2010.12.01
  • Published : 2011.04.25

Abstract

The concept of improved performance indicators (PIs) for use in the KINS Safety Performance Indicator (SPI) program for reactor safety area is proposed in this paper. To achieve this, the recently developed PIs from the USNRC that use risk information were investigated, and a feasibility study for the application of these PIs in Korean NPPs was performed. The investigated PIs are Baseline Risk Index for Initiating Events (BRIIE), Unplanned Scrams with Complications (USwC), and Mitigating System Performance Index (MSPI). Moreover, the thresholds of the existing safety performance indicators of KINS were evaluated in consideration of the risk and regulatory response to different levels of licensee performance in the graded inspection program.

Keywords

References

  1. NEA, “Joint CSNI-CNRA Report on Regulatory Uses of Safety Performance Indicators”, NEA/CNRA/R(2006)
  2. NEI, “Regulatory Assessment Performance Indicator Guideline”, NEI 99-02, Rev. 5 (2007)
  3. D.H.Lee et al., “Assessment of Nuclear Safety Performance Indicators (in Korean)”, KINS-AR/802, KINS, (2008).
  4. USNRC, “Reactor Oversight Process”, NUREG-1649. Rev.4, (2006)
  5. D.W.Chung et al., “Use of PSA and Safety Performance Assessment in Improving Regulatory Inspection System”, PSAM-9, Hong Kong (2008)
  6. USNRC, “Independent Verification of the Mitigating Systems Performance Index (MSPI) Results for the Pilot Plants”, NUREG-1816, (2005)
  7. Y.S.Lee et al., “Development of Methodologies for Risk- Informed Approaches to Safety Performance of NPPs”, KINS/HR-865, (2008)
  8. ROPWG Subgroup, “Unplanned Scrams with Complications, 2006”, Complicated Scrams Task Group Report, (2006)
  9. USNRC, “Baseline Risk Index for Initiating Events (BRIIE)”, NUREG/CR-6932, (2007)
  10. J.H.Park et al., “Transient Initiating Event Analysis for Nuclear Power Plants in Korea", Transactions of the Korean Nuclear Society Spring Meeting (2007)
  11. Glen Masters, “Failures to White Industry Operating Experience”, Presentation Material in MSPI Workshop, San Francisco, Aug. 11-13, (2008)
  12. USNRC, “Standardized Plant Analysis Risk Model and Other Probabilistic Risk Assessment Lessons Learned from Mitigating Systems Performance Index Development and Implementation”, Enclosure 3 in SECY 06-0208, (2006)
  13. D.I.Kang et al., “Development on the Application Technology of Risk-Based Performance Indicator for Domestic NPPs (in Korean)”, KINS/HR-660, (2005)
  14. J.H.Park et al., “Evaluation of Loss of Offsite Power events at Nuclear Power Plants in Korea”, Transactions of the Korean Nuclear Society Autumn Meeting Busan, Korea, October 27-28, (2005)
  15. USNRC, “Recommendations for Reactor Oversight Process Improvements”, SECY-99-007, NRC (1999)
  16. USNRC, “An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis”, RG 1.174, (1998)
  17. USNRC, “Elevation of the Core Damage Frequency Objective to a Fundamental Commission Safety Goal”, SECY-97-208, (2007)
  18. KINS, “Technical Guideline for Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis of Nuclear Facilities”, KINS-GT-N24
  19. KINS/RR-588, Study for Establishment of Draft Safety Goal and Its Following Action Items, 2008
  20. D.I. Kang et al., “Determination of Performance Indicator Thresholds Based on Typical PSA Results”, Journal of the Korean Nuclear Society, Vol 36, No 6, pp.485-496, (2004)
  21. USNRC, “Licensee event report system”, 10CFR50.73
  22. MEST, “Regulation on Reporting and Public Announcement of Accidents and Incidents for Nuclear Power Utilization Facilities”, Notice of the Ministry of Education, Science and Technology Applicable to Nuclear Installations, 2009-24