• Title/Summary/Keyword: Units-configuration

Search Result 143, Processing Time 0.023 seconds

Optimal Design of the Pipe Configuration of an Air Conditioner Outdoor Unit Considering Vibration Characteristics (진동특성을 고려한 에어컨 실외기 배관의 최적설계)

  • Kim, Jun-Hyung;Park, Chang-Bae;Choi, Soo-Yong;Min, Je-Hong
    • Proceedings of the KSME Conference
    • /
    • 2004.11a
    • /
    • pp.655-660
    • /
    • 2004
  • The pipes in the outdoor unit of an air conditioner are designed to reduce the vibration effect of the compressor. Three-dimensional structure of the pipe could provide various design choices and the resultant vibration characteristics of the outdoor units. A design program has been developed for an eligible parametric study of pipe design and automatic vibration analysis using commercial software, I-DEAS, and its macro. Optimal design of pipe configuration has been performed using the commercial software, iSIGHT. The optimized design shows 70 percents improvement in the vibration characteristics of the outdoor unit of an air conditioner.

  • PDF

An Algorithm on Optimal Placement Decision of Automatic Switches for 6 Sections/3 Links Configuration in DAS

  • Lim, Il-Hyung;Zhang, Wen-Hao;Trirohadi, Hamsyah;Choi, Myeon-Song;Lee, Seung-Jae;Ha, Bok-Nam
    • Journal of Electrical Engineering and Technology
    • /
    • v.6 no.3
    • /
    • pp.328-333
    • /
    • 2011
  • A Distribution Automation System (DAS) is operated by monitoring and control of the field statesusing Feeder Remote Terminal Units (FRTUs) installed together withautomatic switches.An optimal placement of automatic switchescan enhanceefficiencyof the operation and restoration, and improve the power supply reliability ofa DAS.This paper proposes an algorithm to decide the optimal placement of automatic switches ina DAS.The proposed algorithm was developed ona DAS witha six sections and three links configuration. The proposed algorithm was provided inaneight-feeder power distribution system.

A Study on Ecological Characteristics of Interior Design for Apartment Building - A Case Analysis of Model Houses for Medium- and large-sized Pyeong Apartments in Busan Area - (아파트 실내디자인의 생태적 특성에 관한 연구 - 부산지역 중.대형 평수 아파트 모델하우스 사례분석 -)

  • Shin, Jae-Moon;Youn, Ji-Young
    • Korean Institute of Interior Design Journal
    • /
    • v.16 no.2 s.61
    • /
    • pp.181-191
    • /
    • 2007
  • This study attempted to analyze the characteristics of interior design of the apartment units of Model-houses in terms of ecological aspects. 9 companies that possessed their model houses among the construction companies in Busan area as of August 2006 were selected. 20 units in the model houses of these companies were visited and analyzed. Through literature review, the guideline for the environmentally-friendly residential design was designed and developed to the checklists. The data collected were analyzed to find out the ecological characteristics of the interior space of apartment units. The findings are the followings. First, energy efficiency was properly considered in terms of natural lighting and natural ventilation. Second, in sustainability, the materials for floors and walls could not be reused even though they were environmentally-friendly. Water system needs more improvement for sustainable development including grey-water and rain recycling system. Third, interior greening should be applied more for better environment both physically and emotionally. It is expected that future housing will be more high-risen and densely-populated apartment spaces. Therefore, an approach to new ecological aspects including an emphasis on interior greening, use of eco-materials and adhesives, water recycling and flexibility of the spatial configuration should be made for the next generation.

Application of Risk-Informed Inservice Inspection for Piping in Nuclear Power Plants (리스크 정보를 활용한 배관 가동중검사 적용)

  • Jin, Young Bok;Jin, Seuk Hong;Moon, Yong Sig
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.7 no.4
    • /
    • pp.31-37
    • /
    • 2011
  • Pressurized Water Reactor Owners Group(PWROG) proposed and applied a risk-informed inservice inspection(RI-ISI) program to alternate existing ASME Section XI periodic inspections. The RI-ISI programs enhance overall safety by focusing inspections of piping at high safety significant(HSS) and locations where failure mechanisms are likely to be present, and by improving the effectiveness on inspection of components because the examination methods are based on the postulated failure mode and the configuration of the piping structural element. The RI-ISI programs can reduce NDE, man-rem exposure, costs of engineering analysis, outage duration and chance of complicating plant operations etc. RI-ISI methods of piping inservice inspection were applied on 3 units(KSNP : Korea Standard Nuclear Power Plant) and are scheduled to apply on the other units. In this paper, we compared and showed the results of the 2 units and we concluded that the RI-ISI application could enhance and maintain plant safety and give unquantifiable benefits.

Optimal Configuration of Distribution System considering the Economic Operations of a Microgrid

  • Moon, Hyun-Ho;Lee, Jong-Joo;Choi, Sang-Yule;Shin, Myong-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.7
    • /
    • pp.20-25
    • /
    • 2010
  • With the diversification of distribution facilities, existing distributed generation can be subdivided into Microgrids, which are smaller units for application. These Microgrids, subdivided as such and connected to distribution systems, should operate under driving plans that will ensure their economic efficiency and, accordingly, the configuration of those distribution systems that include Microgrids should also be changed. The perception of the necessity to secure the economic efficiency of distribution systems is gradually increasing and studies intended to assess the economic efficiency of Microgrids and Smartgrids are ongoing. In this paper, the power generation capacity of an economically operative Microgrid was calculated using the MonteCarlo simulation, which is a method based on the probability theory considering the power generation cost of Microgrids linked with power supply systems and reverse sales costs, etc., and an optimum distribution systems was configured based on the results of these calculation.

Optimal Configuration Algorithm for ESS with Renewable Energy Resources Considering Peak-shaving Effects (신재생 에너지가 도입된 전력저장장치의 첨두부하절감 효과를 고려한 최적 구성 알고리즘)

  • Lee, Na-Eun;Kim, Wook-Won;Kim, Jin-O
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.9
    • /
    • pp.1199-1205
    • /
    • 2014
  • A power system configuration has been increasingly advanced with a number of generating units. In particular, renewable energy resources are widely introduced due to the environmental issues. When applying the renewable energy sources with the ESS (Energy Storage System), the ESS is the role of a potential generating resource in the power system while mitigating the output volatility of renewable energy resources. Thus, for applications of the ESS, the surrounding environment of it should be considered, which means that capacity and energy of the ESS can be affected. Moreover, operation strategy of the ESS should be proposed according to the installation purpose as well as the surrounding environment. In the paper, operation strategy of the ESS is proposed considering load demand and the output of renewable energy resources on a hourly basis. Then, the cost of electrical energy is minimized based on the economic model that consists of capital cost, operation cost, fuel cost, and grid cost for a year. It is sure that peak-shaving effects can be achieved while satisfying the minimum cost of electrical energy.

Analysis of Damage Trend for Gas Turbine 1st Bucket Related to the Change of Models (모델 변천에 따른 가스터빈 1단 버켓의 손상경향 분석)

  • Kim, Moon-Young;Park, Sang-Yeol;Yang, Sung-Ho;Choi, Hee-Sook;Ko, Won;Song, Kuk-Hyun
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.31 no.6 s.261
    • /
    • pp.718-724
    • /
    • 2007
  • Some of gas turbine model of 7F-Class has constructed and is operating with units domestically. Non-destructive testing (NDT) is one of the methods being used to inspect damage $1^{st}$ stage bucket and review damage trends. We also analyze damage configuration and microstructure according to material and compare with pape of electric power research institute (EPRI). The damaged mode could be determined by leveraging failure analysis. Especially, configuration uprate of bucket is not only to prevent damage during operation but also avoid domestic manufacturing by the competitors. Modifications were mainly concentrated on surfaces such as cooling hole and bucket tips. Analyzing of bucket damage, the earlier model of 7F-Class used with one cycle with equivalent operation hour (EOH), has various cracking of the bucket surface. Bucket damage of new model is centered on tip area (54%) as analyzed by EPRI research. We conclude that improving bucket configuration would increase repair rate on the bucket tip.

A Study about Output Filter of Paralleled Three-Phase Grid-Connected PV Inverters

  • Vu, Trung-Kien
    • Proceedings of the KIPE Conference
    • /
    • 2011.07a
    • /
    • pp.271-272
    • /
    • 2011
  • The rising popularity of renewable energy sources resulted in development of the units of higher rated powers. As a result of the limited power handling capacity of individual devices, paralleling is the choice to increase the equipment rating, while keeping the THD of the current at the PCC within the agency specified standards. And their typical power circuit configuration limits the stress on individual devices to an appreciable extent. The main scope of this paper is the analysis of filter structure in paralleling inverter system's operation. Simulation results are shown to verify the theoretical analysis.

  • PDF

A Processor Assignment Problem for ATM Switch Configuration

  • Han, Junghee;Lee, YoungHo
    • Management Science and Financial Engineering
    • /
    • v.10 no.2
    • /
    • pp.89-102
    • /
    • 2004
  • In this paper, we deal with a processor assignment problem that minimizes the total traffic load of an ATM switch controller by optimally assigning processors to ATM interface units. We develop an integer programming (IP) model for the problem, and devise an effective tabu search heuristic. Computational results reveal the efficacy of the proposed tabu search procedure, finding a good quality solution within 5% of optimality gap.

Existing Situation and Future Prospect of Cogeneration (코제니레이션의 현상(現狀)과 전망(展望))

  • Yoon, Kap-Koo;Lee, Kang-Won;Han, Young-Suk
    • Proceedings of the KIEE Conference
    • /
    • 1987.11a
    • /
    • pp.150-153
    • /
    • 1987
  • This paper describes the fundamentals, system configuration, existing situation and future prospect of the cogeneration system and valuation of its economic effects. Especially, increasing this system should be evaluated for national energy management deeply, because KEPCO has generation units eneugh which can be met demend currently and in the near future and nuclear power generation has been more than 50% of total generation.

  • PDF