• 제목/요약/키워드: Unit Testing

검색결과 612건 처리시간 0.032초

도시철도차량 알루미늄 차체의 동적 하중 시험에 의한 피로 강도 평가 (Fatigue Strength Evaluation of the Aluminum Car body of Urban Transit Unit by Large Scale Dynamic Load Test)

  • 서승일;박춘수;신병천
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2003년도 추계학술대회
    • /
    • pp.1051-1055
    • /
    • 2003
  • Aluminum carbody for rolling stocks is light and perfectly recycled, but includes severe defects which are very dangerous to fatigue strength. Structural integrity assessment for the carbody by static load test has been performed up to date. In this study, to evaluate fatigue strength of the aluminum carbody of urban transit unit. a testing method to simulate dynamic loading condition was proposed and the fatigue strength of the carbody was evaluated. The dynamic load test results showed that the alternating stress ranges were different from the estimated ranges based on the static test results. Excessive stress ranges at the center are thought to come from the flexible motion of the carbody. published fatigue test data for aluminum components, but variation of alternating acceleration along the length due to flexibility of carbody yielded unexpected results. Because fatigue strength based on the static test results may be overestimated at the center, modification of testing method is necessary.

  • PDF

Development of a Novel 30 kV Solid-state Switch for Damped Oscillating Voltage Testing System

  • Hou, Zhe;Li, Hongjie;Li, Jing;Ji, Shengchang;Huang, Chenxi
    • Journal of Power Electronics
    • /
    • 제16권2호
    • /
    • pp.786-797
    • /
    • 2016
  • This paper describes the design and development of a novel semiconductor-based solid-state switch for damped oscillating voltage test system. The proposed switch is configured as two identical series-connected switch stacks, each of which comprising 10 series-connected IGBT function units. Each unit consists of one IGBT, a gate driver, and an auxiliary voltage sharing circuit. A single switch stack can block 20 kV-rated high voltage, and two stacks in series are proven applicable to 30 kV-rated high voltage. The turn-on speed of the switch is approximately 250 ns. A flyback topology-based power supply system with a front-end power factor correction is built for the drive circuit by loosely inductively coupling each unit with a ferrite core to the primary side of a power generator to obtain the advantages of galvanic isolation and compact size. After the simulation, measurement, and estimation of the parasitic effect on the gate driver, a prototype is assembled and tested under different operating regimes. Experimental results are presented to demonstrate the performance of the developed prototype.

Dynamic Characterization of Sub-Scaled Building-Model Using Novel Optical Fiber Accelerometer System

  • Kim, Dae-Hyun
    • 비파괴검사학회지
    • /
    • 제31권6호
    • /
    • pp.601-608
    • /
    • 2011
  • This paper presents the damage assessment of a building structure by using a novel optical fiber accelerometer system. Especially, a sub-scaled building model is designed and manufactured to check up the feasibility of the optical fiber accelerometer for structural health monitoring. The novel accelerometer exploits the moir$\acute{e}$ fringe optical phenomenon and two pairs of optical fibers to measure the displacement with a high accuracy, and furthermore a pendulum to convert the displacement into acceleration. A prototype of optical fiber accelerometer system has been successfully developed that consists of a sensor head, a control unit and a signal processing unit. The building model is also designed as a 4-story building with a rectangular shape of $200{\times}300$ mm of edges. Each floor is connected to the next ones by 6 steel columns which are threaded rods. Basically, a random vibration test of the building model is done with a shaker and all of acceleration data is successfully measured at the assigned points by the optical fiber accelerometer. The experiments are repeated in the undamaged state and the damaged state. The comparison of dynamic parameters including the natural frequencies and the eigenvectors is successfully carried out. Finally, the optical fiber accelerometer is proven to be prospective to evaluate dynamic characteristics of a building structure for the damage assessment.

Comprehensive Vibration Assessment Program for Yonggwang Nuclear Power Plant Unit 4

  • Huinam Rhee;Hwang, Jong-Keun;Kim, Tae-Hyung;Kim, Jung-Kyu;Song, Heuy-Gap;Kim, Beom-Shig
    • 한국원자력학회:학술대회논문집
    • /
    • 한국원자력학회 1995년도 추계학술발표회논문집(2)
    • /
    • pp.1001-1007
    • /
    • 1995
  • A Comprehensive Vibration Assessment Program (CVAP) has been performed for Yonggwang Nuclear Power Plant Unit 4 (YGN 4) in order to verify the structural integrity of the reactor internals for flow induced vibrations prior to commercial operation. The theoretical evidence for the structural integrity of the reactor internals and the basis for measurement and inspection are provided by the analysis. Flow induced hydraulic loads and reactor internals vibration response data were measured during pre-core hot functional testing in YGN 4 site. Also, the critical areas in the reactor internals were inspected visually to check any existence of structural abnormality before and after the pre-core hot functional testing. Then, the measured data have been analyzed and compared with the predicted data by analysis. The measured stresses are less than the predicted values and the allowable limits. It is concluded that the vibration response of the reactor internals due to the flow induced vibration under normal operation is acceptable for long term operation.

  • PDF

Modification of Reference Temperature Program in Reactor Regulating System

  • Yu, Sung-Sik;Lee, Byung-Jin;Kim, Se-Chang;Cheong, Jong-Sik;Kim, Ji-In;Doo, Jin-Yong
    • 한국원자력학회:학술대회논문집
    • /
    • 한국원자력학회 1998년도 춘계학술발표회논문집(1)
    • /
    • pp.404-410
    • /
    • 1998
  • In Yonggwang nuclear units 3 and 4 currently under commercial operation, the cold leg temperature was very close to the technical specification limit of 298$^{\circ}C$ during initial startup testing, which was caused by the higher-than-expected reactor coolant system flow. Accordingly, the reference temperature (Tref) program needed to be revised to allow more flexibility for plant operations. In this study, the method of a specific test performed at Yonggwang nuclear unit 4 to revise the Tref program was described and the test results were discussed. In addition, the modified Tref program was evaluated on its potential impacts on system performance and safety. The methods of changing the Tref program and the associated pressurizer level setpoint program were also explained. Finally, for Ulchin nuclear unit 3 and 4 currently under initial startup testing, the effects of reactor coolant system flow rate on the coolant temperature were evaluated from the thermal hydraulic standpoint and an optimum Tref program was recommended.

  • PDF

The Qualification Test of KSLV-I(NARO) Assembly Complex

  • Jin, Seung-Bo;Cho, Byoung-Gyu;Lee, Chang-Bae;Chun, Young-Doo;Seo, Dong-Chan;Chung, Eui-Seung
    • 한국우주과학회:학술대회논문집(한국우주과학회보)
    • /
    • 한국우주과학회 2009년도 한국우주과학회보 제18권2호
    • /
    • pp.49.1-49.1
    • /
    • 2009
  • Ground Complex, which is located at Naro Space Center, consists of Assembly Complex(AC) and Launch Complex(LC) which is necessary for successful launch of KSLV-I(NARO). AC consists of Assembly/Testing Building(ATB), Payload Processing Building(PPB), Kick Motor Building(KMB). The purpose of AC is accepting of KSLV-I components, testing, checkout, assembly(disassembly) of the launch vehicle(LV), readiness for transferring LV to LC, accepting of integrated Launch Vehicle(ILV) in case of launch cancellation and short/long time storage, and so on. Qualification tests(QT) for the total system at AC are carried out to check hardware used for operations with first stage unit mockup, upper stage unit Mockup and integrated mockup(GTV). The qualification tests is carried out according to program and procedures of QT. By course of this process, AC is certificated that all the systems and facilities of AC are guaranteed by the fulfillment of technological operations envisioned in the program of qualification tests during the work with the mock-up.

  • PDF

개념 설계 평가를 위한 제품 품질지수 (Product Quality Index for Concept Design Evaluation)

  • 정진하;박영원
    • 한국생산제조학회지
    • /
    • 제19권4호
    • /
    • pp.521-528
    • /
    • 2010
  • A product system will be improved continually until requirements are satisfied. It is true that considering alternative designs to improve product system is hard work; it is also true that selecting an adequate design idea that represents the needs of stakeholders concerned and meets effectiveness factors properly is not an easy work, either. In the process of driv-ing an idea and designing, which is called Design Phase, there are lots of existing tools for testing the driven idea in DFSS. But, those kinds of tools do not offer the function that helps to select the technically better design idea among alternative design ideas that have the same evaluation level. Moreover it is inappropriate to select adequate alternative design ideas by just verifying only the evaluation table in pugh matrix, since satisfied deviation val-ues are low when there is a too competitive mass product system in a market. Also, for the IT product with short life cycle, faster and more effective testing tool is needed. Therefore, the 'roduct quality index' is suggested in order to select an appropriate candidate design concept for system development that meets requirements by using 'deality concept' pro-vided by TRIZ. According to the result of this research, it is possible to select technically better idea fast and effectively; it is confirmed by applying the approach to the case of LCD BLU (Back Light Unit).

전동차 인버터 구동용 전해콘덴서의 신뢰도예측과 수명 연구 (A Study on the Reliability Prediction and Lifetime of the Electrolytic Condenser for EMU Inverter)

  • 한재현;배창한;구정서
    • 한국안전학회지
    • /
    • 제29권1호
    • /
    • pp.7-14
    • /
    • 2014
  • Inverter module, which feeds the converted power to the traction motor for EMU. Consists of the power semiconductors with their gate drive unit(GDU)s and the control computer for driving, voltage, current and speed controls. Electrolytic condenser, connected to the gate drive unit and a core component to drive the power semiconductor, has problems such as reduction in lifetime and malfunction caused by electrical and mechanical characteristic changes from heat generation during high speed switching for generation of stable power. In this study, To check the service life of electrolytic condenser, the test was carried out in two ways. First, In the case of accelerated life testing of condenser, the Arrhenius model is a way of life testing. Another way is to analyze the reliability of the failure data by the method of parametric data analysis. Eventually, life time by accelerated life test than a method of failure data analysis(Weibull distribution) was found to be slightly larger output.

A new model and testing verification for evaluating the carbon efficiency of server

  • Liang Guo;Yue Wang;Yixing Zhang;Caihong Zhou;Kexin Xu;Shaopeng Wang
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제17권10호
    • /
    • pp.2682-2700
    • /
    • 2023
  • To cope with the risks of climate change and promote the realization of carbon peaking and carbon neutrality, this paper first comprehensively considers the policy background, technical trends and carbon reduction paths of energy conservation and emission reduction in data center server industry. Second, we propose a computing power carbon efficiency of data center server, and constructs the carbon emission per performance of server (CEPS) model. According to the model, this paper selects the mainstream data center servers for testing. The result shows that with the improvement of server performance, the total carbon emissions are rising. However, the speed of performance improvement is faster than that of carbon emission, hence the relative carbon emission per unit computing power shows a continuous decreasing trend. Moreover, there are some differences between different products, and it is calculated that the carbon emission per unit performance is 20-60KG when the service life of the server is five years.

분광측색계에 의한 착색 수돗물 시험방법 연구 (A study on the testing method of discolored tap water by spectrophotometer)

  • 김동헌;이종금;오지윤;김기태;전항배
    • 상하수도학회지
    • /
    • 제37권4호
    • /
    • pp.187-202
    • /
    • 2023
  • This study focuses on the application of a new measurement method that quantifies the residual color of filtered water using a spectrocolorimeter after filtering the discolored substances. It was confirmed through the color and turbidity cross-test that the discolored substances cannot be measured effectively with the current legal color and turbidity test method. Therefore, the National Institute of Environmental Research's filter testing method, which involves filtering the sample through 0.45 ㎛ filter and visually inspecting the color, was improved. A membrane filter colorimetry (MFC) method was established by measuring the color difference (ΔE*ab(65)) of the filtered filter using a spectrophotometer and expressing it as filter color unit (FCU). Using the MFC method, the FCU for reference materials such as iron and manganese, as well as field samples, was measured. The results showed a high correlation with turbidity, and the color difference patterns varied depending on the type of reference materials and field samples. This indicates that the MFC method is an effective new measurement method of discolored tap water.