• 제목/요약/키워드: Unit Pollution Loads

검색결과 71건 처리시간 0.025초

수질오염총량관리 단위유역의 유량변화 특성분석 - 금강수계를 대상으로 - (Characterization on the Variation of Streamflow at the Unit Watershed for the Management of Total Maximum Daily Loads - in Guem River Basin -)

  • 박준대;오승영;최옥연
    • 한국물환경학회지
    • /
    • 제27권6호
    • /
    • pp.914-925
    • /
    • 2011
  • The variation of streamflow is regarded as one of the most influential factors on the fluctuation of water quality in the stream. The characteristics of the variation should be taken into account in the plans for the management of Total Maximum Daily Loads (TMDLs). This study analysed and characterized spatial distribution and temporal variation of streamflow at each unit watershed in Guem-river basin. For the analysis of the distribution of streamflow, the type and the extent of the distribution were investigated for the unit watershed. For the analysis of the variation, short and long term changes of streamflow were examined. The result showed that most of the distributions were not log-normalized and the extent of variation tends to be greater at the unit watershed placed on the tributaries in the basin. A kind of margin could be granted to the unit watershed involving high variations so as to establish the water quality goal and load allotment more reasonably and effectively in view of whole waterbody.

금강수계 1단계 수질오염총량관리제의 목표수질 및 할당부하량 달성도 평가 (Evaluation of Water Quality Goal and Load Allocation Achievement Ratio in Guem River Total Maximum Daily Loads for the 1st Phase)

  • 박재홍;오승영;이재관
    • 한국물환경학회지
    • /
    • 제28권6호
    • /
    • pp.859-865
    • /
    • 2012
  • It is necessary to evaluate performances hitherto carried out in the management of Total Maximum Daily Loads (TMDLs) and to set up direction so that this system can be improved continuously in the future. This study was investigated load allocation achievement ratio, water quality goal achievement ratio and interrelation between water quality goal and load allocation for the first period (2004~2010). Load allocation achievement and BOD water quality goal achievement ratio were 50% and 73% in Guem River Basin, respectively. The main reason for excess of load allocation and shortfall of water quality goal were unfulfilled reduction plan and pollution sources increment. Therefore, it is necessary to develop enhanced pollution sources prediction method and make a list realizable reduction plan. 63% of the unit watershed was not interrelation between water quality goal and load allocation. The reason why water quality goal and load allocation had not correlation were water quality of upper unit watershed, increment of inflow quantity, effluent water quality of wastewater treatment plant affected the unit watershed, increment of inner productivity by algae, water quality deterioration during the specific period, river management flow, etc.

부하지속곡선(Load Duration Curve; LDC)을 이용한 한강수계 오염총량관리 목표수질 평가방법 적용 방안 (Application of the Load Duration Curve (LDC) to Evaluate the Achievement Rate of Target Water Quality in the Han-River Watersheds)

  • 김은경;류지철;김홍태;김용석;신동석
    • 한국물환경학회지
    • /
    • 제31권6호
    • /
    • pp.732-738
    • /
    • 2015
  • Water quality in four major river basin in Korea was managed with Total Maximum Daily Load (TMDL) System. The unit watershed in TMDL system has been evaluated with Target Water Quality (TWQ) assessment using average water quality, without considering its volume of water quantity. As results, although unit watershed are obtained its TWQ, its allocated loads were not satisfied and vice versa. To solve these problems, a number of TWQ assessments with using Load Duration Curve (LDC) have been studied at other watersheds. The purpose of this study was to evaluate achievement of TWQ with Flow Duration Curve (FDC) and Load Duration Curve(LDC) at 26 unit watersheds in Han river basin. The results showed that achievement rates in TWQ assessment with current method and with LDC were 50~56 % and 69~73%, respectively. Because of increasing about 20% of achievement rates with using LDC, the number of exceeded unit watershed at Han river Basin was decreased about 4~6 unit watersheds.

수질오염총량관리제에서 난분해성 유기물질 관리 필요성 및 개선방안 (Necessity of Refractory Organic Matters Management in Total Maximum Daily Loads (TMDLs))

  • 박재홍;박배경;이재관;류덕희
    • 한국물환경학회지
    • /
    • 제29권3호
    • /
    • pp.393-399
    • /
    • 2013
  • To control organic matters, it needs to manage not only biodegradable organic matters but also refractory organic matters. Refractory organic matters from municipal wastewater, industrial wastewater, non-point sources and etc., have been continuously discharged to the near watersheds. It is estimated that the refractory organic matter ratios are continuously increased in waterbody. In watersheds of the Total Maximum Daily Loads (TMDLs), it was investigated that COD/BOD ratios increased in many unit watersheds of the 4 major river basins. The portions COD/BOD ratios increased were found to be a 97% of Geum River unit watersheds, a 81% of Yeongsan/Seumjin River unit watersheds, a 78% of Nakdong River unit watersheds, a 70% of Han River unit watersheds, respectively. Therefore, it has become important for establishment of effective management strategies to control refractory organic matter in watersheds of the Total Maximum Daily Loads (TMDLs). In order to properly manage organic matters including refractory organic matters, the present organic indicator (BOD) has to be converted to TOC (or COD). Compared to COD and BOD, TOC, as a organic matter indicator, is evaluated more appropriate.

수질오염총량관리 단위유역 유량측정자료를 이용한 유황곡선 작성 (Development of a Flow Duration Curve with Unit Watershed Flow Data for the Management of Total Maximum Daily Loads)

  • 박준대;오승영;최윤호
    • 한국물환경학회지
    • /
    • 제28권2호
    • /
    • pp.224-231
    • /
    • 2012
  • It is necessary to develop flow duration curve (FDC) on each unit watershed in order to analyze flow conditions in the stream for the management of Total Maximum Daily Loads (TMDLs). This study investigated a simple method to develop FDC for the general use of the curve. A simple equation for daily flow estimation was derived from the regression analysis between the 8-day interval flow data of a unit watershed and the daily flow monitoring data of an adjacent upstream region. FDC can be prepared with the calculation of daily flow by the equation for each unit watershed. An annual and a full-period FDC were drawn for each unit watershed in Guem river basin. Standard flow such as low and ordinary flow can be obtained from the annual FDC. Major percentile of flow such as 10, 25, 50, 75 or 90% can be obtained from the full-period FDC. It is considered that this simple method of developing FDC can be utilized more widely for the calculation of standard flow and the assessment of water quality in the process of TMDLs.

수질오염총량관리를 위한 4대강수계 장기유황곡선 작성방안 (Development of Long Term Flow Duration Curves in 4 River Basins for the Management of Total Maximum Daily Loads)

  • 박준대;오승영
    • 한국물환경학회지
    • /
    • 제29권3호
    • /
    • pp.343-353
    • /
    • 2013
  • Flow duration curve (FDC) can be developed by linking the daily flow data of stream flow monitoring network to 8-day interval flow data of the unit watersheds for the management of Total Maximum Daily Loads. This study investigated the applicable method for the development of long term FDC with the selection of the stream flow reference sites, and suggested the development of the FDC in 4 river basins. Out of 142 unit watersheds in 4 river basins, 107 unit watersheds were shown to estimate daily flow data for the unit watersheds from 2006 to 2010. Short term FDC could be developed in 64 unit watersheds (45%) and long term FDC in 43 unit watersheds (30%), while other 35 unit watersheds (25%) were revealed to have difficulties in the development of FDC itself. Limits in the development of the long term FDC includes no stream monitoring sites in certain unit watersheds, short duration of stream flow data set and missing data by abnormal water level measurements on the stream flow monitoring sites. To improve these limits, it is necessary to install new monitoring sites in the required areas, to keep up continuous monitoring and make normal water level observations on the stream flow monitoring sites, and to build up a special management system to enhance data reliability. The development of long term FDC for the unit watersheds can be established appropriately with the normal and durable measurement on the selected reference sites in the stream flow monitoring network.

토지이용의 공간적 다양성에 따른 GIS 기반 오염부하 산정에 관한 연구 - 왕숙천 유역을 중심으로 - (A Study of GIS-based Estimation of Pollutant Loads in Accordance with Spatial Landuse Variation - Focussing on Wangsook Watershed -)

  • 김경순;김계현;권오준
    • 환경영향평가
    • /
    • 제14권5호
    • /
    • pp.305-315
    • /
    • 2005
  • The scheme to classify pollution sources in Korean TMDL planning has been pointed out too much complex to implement practically because of requiring a wide range of items to be collected from a field. Within a deficient situation to collect field data, the mathematical scheme that focuses only on counting an uniform area ratio of the different land uses to estimate of pollutant loads from individual sub-catchments has been used without taking into account of the spatial characteristics of major land uses as well as the locations of pollution sources in each sub-catchment. It would cause to significant level of errors to estimate the pollution loads. Therefore, this study proposes a renovated scheme that can be adopted more easily to classify pollution sources in the watershed and reduce the estimation errors in the spatial distribution of pollution sources by introducing a spatial analysis based on digital land cover maps. In order to estimate a unit area to calculate the uniform pollution load, the pollution response unit area that is locating spatially at the same place and having same land use is identified through the application of GIS overlay technique. Unlikely existing conventional method to calculate the pollution load based on equal distribution of pollutants for each administrative boundary, it is assumed that the pollution load from household and livestock sources are generated and washed off from only residential areas. While, pollution from business population comes from commercial area and industrial load from wastewater discharge facilities are from industrial areas. From comparison of the calculated results from the existing the method and the proposed one, it is found that although the estimation of pollution load from sub-catchment in the case of the existing conventional method application results in negligible difference in total pollution amounts from the whole area of Wangsook watershed as a study area, significant difference of pollution load among sub-catchment in which pollution response unit areas are diverse, however, appears in the case of the application of the renovated scheme.

총량관리 단위유역의 토지이용 변화 및 오염물질 배출형태 분석 (Analysis of Changes in Land Use and Pollution Load for the Unit Watersheds of Total Maximum Daily Loads)

  • 박준대;오승영;최옥연
    • 한국물환경학회지
    • /
    • 제30권2호
    • /
    • pp.128-137
    • /
    • 2014
  • The land use of the unit watersheds should be maintained appropriately in order to keep the load allotment stable for the management of Total Maximum Daily Loads (TMDLs). This study classified the land area in four types and analyzed the use of each land type and its changing pattern by calculating the occupation and conversion ratios for the unit watersheds in three river basins. The forest land showed the greatest occupation ratio with 63.0%, followed by the farm land with 23%, the other area with 8.0% and the site area with 6.0% in 2003. The occupation ratio of the site and the other area increased by 0.4% and 0.2% respectively, and that of the farm and the forest land decreased by 0.4% and 0.2% respectively in 2007. The conversion ratio for the site area ranged from 1.65% to 1.97%, for the farm land from -0.47% to -0.33%, for the forest land from -0.10% to -0.04% and for the other area from 0.17% to 1.97%. It can be inferred that the decrease in the farm and the forest land contributed to the increase in the site area and that the increase in the other area was mainly made by the decrease in the forest land. It could be more effective to take into account the changes in the site area and in the forest land in the process of developing the TMDL plans.

고해상도 영상자료를 이용한 실제토지이용에 따른 지목면적 및 부하량 산정 (Calculation of Land Category Area and Pollution Loads according to Real Land Usage using High Resolution Satellite Image)

  • 박재홍;이수웅;박주현;류덕희;정동일;최혜미;전우송
    • 한국물환경학회지
    • /
    • 제25권2호
    • /
    • pp.193-204
    • /
    • 2009
  • The study was conducted investigation on land of D-dong in N city which is an urban area and D myeon of N city which is a suburban area, based on high resolution satellite image, to find out actual land usage. As for D-dong in N city, different rate between actual usage and official land information was 0.5~4.8% in terms of 5 major land types (paddy field, farm, ground, forest, and others). D myeon in N city posted 1.4~8.4%, which is higher than that of its counterpart. As for unit load, "land" which is large in terms of load presented a big difference between official information and actual usage. On the other hand, the levels of paddy, field, forest and others posted only small changes in load. In case of T-P, in particular, unit of each land type is lower than BOD and T-N, showing almost no changes in pollution loads.

원단위법을 이용한 홍보유역의 오염부하량 산정 (Estimation of Pollutants Loads using Unit Load Method in Hong-Bo Watershed)

  • 김선주;이석호;허배영
    • 한국농공학회:학술대회논문집
    • /
    • 한국농공학회 2001년도 학술발표회 발표논문집
    • /
    • pp.492-496
    • /
    • 2001
  • The purpose of this study is to estimation of pollutants loads using unit load method in Hong-bo watershed. In general, because river water quality management have been conducted with point source pollutant in our country, pollutants caused by precipitation have not been managed well so far. Especially the pollutants tends to concentrate in the reservoir of reclaimed land. Therefore, the reservoir of reclaimed land is need to continuous monitoring and update of an accurate data. also, It is need to improvement of environmental pollution. There are divide into nine sub-catchments and made an estimate of pollutants loads using unit load method in Hong-bo basin. The sample of data was during the 10 years.

  • PDF