• 제목/요약/키워드: Unit Cost Model

검색결과 478건 처리시간 0.024초

작업처리능력 제약하에서 자동창고 건설비용 최소화를 위한 연구 (A Solution Procedure for Minimizing AS/RS Construction Costs under Throughput Rate Requirement Constraint)

  • 나윤균;이동하;오근태
    • 산업경영시스템학회지
    • /
    • 제25권4호
    • /
    • pp.40-45
    • /
    • 2002
  • An AS/RS construction cost minimization model under throughput rate requirement constraint has been developed, whose objective function includes S/R machine cost, storage rack cost, and interrace conveyor cost. S/R machine cost is a function of the storage rack height, the unit load weight, and the control logic used by the system, while storage rack cost is a function of the storage rack height, the weight and the volume of the unit load. Since the model is a nonlinear integer programming problem which is very hard to solve exactly with large problem size, a solution procedure is developed to determine the height and the length of the storage rack with a fixed number of S/R machines, while increasing the number of S/R machines one by one to meet the throughput rate requirement.

복합형 유역모델 STREAM의 개발(I): 모델 구조 및 이론 (Development of a Hybrid Watershed Model STREAM: Model Structures and Theories)

  • 조홍래;정의상;구본경
    • 한국물환경학회지
    • /
    • 제31권5호
    • /
    • pp.491-506
    • /
    • 2015
  • Distributed models represent watersheds using a network of numerous, uniform calculation units to provide spatially detailed and consistent evaluations across the watershed. However, these models have a disadvantage in general requiring a high computing cost. Semi-distributed models, on the other hand, delineate watersheds using a simplified network of non-uniform calculation units requiring a much lower computing cost than distributed models. Employing a simplified network of non-uniform units, however, semi-distributed models cannot but have limitations in spatially-consistent simulations of hydrogeochemical processes and are often not favoured for such a task as identifying critical source areas within a watershed. Aiming to overcome these shortcomings of both groups of models, a hybrid watershed model STREAM (Spatio-Temporal River-basin Ecohydrology Analysis Model) was developed in this study. Like a distributed model, STREAM divides a watershed into square grid cells of a same size each of which may have a different set of hydrogeochemical parameters reflecting the spatial heterogeneity. Like many semi-distributed models, STREAM groups individual cells of similar hydrogeochemical properties into representative cells for which real computations of the model are carried out. With this hybrid structure, STREAM requires a relatively small computational cost although it still keeps the critical advantage of distributed models.

아파트 재건축사업의 수익성평가에 대한 확률적 위험도 분석 모형 적용방안 (Application of Probabilistic Risk Analysis for Profitability-Evaluation of Apartment Reconstruction Projects)

  • 우광민;이학기
    • 한국건설관리학회논문집
    • /
    • 제7권5호
    • /
    • pp.167-176
    • /
    • 2006
  • 현재 재건축사업은 추진 의사결정과 관련한 확정된 지표나 기준이 없이 막연한 수익성에 대한 기대를 토대로 시행되고 있으며, 사업시행과정 에서 직면하게 되는 제반 위험 에 대해 경험 적으로 대응하고 있는 실정이다. 또한 재건축조합이나 시공예정 회사들이 제공하는 관리처분계획에 포함된 수익성에 관한 정보는 결정론적 분석을 통한 단순한 예측에 불과하여 재건축을 시행하는 과정에서 결과가 수정되는 것이 일반적이다. 즉 수익성에 대한 예측이 재건축시행 과정상의 유동적인 상황에서 변경됨에 따라 예측결과에 대한 신뢰도는 근본적으로 내 외적인 한계를 갖고 있다. 본 연구는 재건축사업의 수익성에 영향을 미치는 변수들을 확률적으로 평가하여 수익과 위험을 동시에 분석하는 수익성예측모델을 개발하고, 사례연구를 통해 개발모델의 적합성을 검증하여 기존의 결정론적 접근방식이 갖는 한계를 극복하고자 한다.

전시탄약 재보급 할당에 관한 연구 (A Study on Ammunition Resupply Allocation Model)

  • 이영신
    • 한국국방경영분석학회지
    • /
    • 제30권2호
    • /
    • pp.133-140
    • /
    • 2004
  • In this paper, with the limited range of ammunition supply point(ASP) at ammunition battalion in specific corps and light automobile battalion(LAB) directly supports its vehicle for ammunition supply, we propose optimal model to minimize transportation time and logistics cost using integer programming(IP) for efficient ammunition resupply allocation during a given operation period of front combat unit. And then, we consider ammunition treatment and supply capacity of ammunition supply point(ASP), constraint elements of transportation ability considering time and cost, ammunition storage capacity of combat unit, combat situation and unit mission to propose this model. Finally, through numerical example, we examine the applicable feasibility of proposed model.

생산 시스템에서 직접 원가 분석 모델 (A Direct Cost Analysis Model in Manufacturing System)

  • 한주윤;정봉주;유일근
    • 대한산업공학회지
    • /
    • 제29권4호
    • /
    • pp.321-333
    • /
    • 2003
  • Although manufacturing cost is a major part of profit in a company, it is difficult to be calculated by an analytic method. Besides, the manufacturing cost gained by simple financial structure dose not have an important meaning in market place. Therefore, an analytic method of computing the manufacturing cost is very necessary in manufacturing system. In this study, we suggested the direct cost analysis model which are able to measure accurate cost analysis of product in manufacturing system. The direct cost analysis model is made up of directly used expenditure for unit product. Also, system performances are put in the manufacturing cost analysis model so that it could be possible to analyze the change of manufacturing cost as system performances change. At the end of this paper, it verifies its relevancy and practicality of the suggested direct cost analysis model through the case study, using real data for direct labor cost.

Optimal Schedules of Periodic Preventive Maintenance Model with Different PM Effect

  • Lim, Jae-Hak
    • International Journal of Reliability and Applications
    • /
    • 제9권1호
    • /
    • pp.113-122
    • /
    • 2008
  • In this paper, we consider a periodic preventive maintenance policy in which each preventive maintenance reduces the hazard rate of amount proportional to the failure intensity, which increases since the system started to operate. And the effect of preventive maintenance at each preventive maintenance epoch is different. The expected cost rate per unit time for the proposed model is obtained. We discuss the optimal number N of the periodic preventive maintenance and the optimal period x, which minimize the expected cost rate per unit time and obtain the optimal preventive maintenance schedule for given cost structures of the model. A numerical example is given for the purpose of illustrating our results when the failure time distribution is Weibull distribution.

  • PDF

초기 기획단계의 신한옥 공사비 예측 모델 - 모듈(칸) 기반의 목공사 개략 물량 산출 중심으로 - (Preliminary Construction Cost Prediction Model Based on Module for Modernized Hanok)

  • 강승희;정영수
    • 한국건설관리학회논문집
    • /
    • 제21권3호
    • /
    • pp.48-56
    • /
    • 2020
  • 기획단계에서의 공사비 예측은 타당성 분석, 예산 책정, 계획수립 등을 위한 기초정보를 제공한다는 점에서 성공적인 프로젝트 수행을 위한 중요한 요소이다. 본 연구에서는 초기 기획단계의 신한옥 공사비 예측 정확도 향상을 목적으로 전체 공사비 중 가장 많은 비중을 차지하는 목공사는 다양한 조건(구조형식, 지붕형태, 평면형태 등)에 의해 개략 물량을 자동 산출하여 공사비를 예측하고, 이외의 공종은 단위단가식을 적용해 공사비를 예측하는 모델을 제시하였다. 2개의 사례를 대상으로 개략 견적 모델로써의 활용성 및 타당성을 검증하였으며, 총공사비의 오차율은 각각 -4%(사례 1), -6%(사례2)로 나타났다. 이러한 결과값은 초기 기획단계에서 실무활용 가능한 범위에서의 오차를 보였다.

무료 재생교체-비재생수리보증이 종료된 이후의 교체모형 (Replacement Model Following the Expiration of Free RRNMW)

  • 정기문
    • Communications for Statistical Applications and Methods
    • /
    • 제18권6호
    • /
    • pp.697-705
    • /
    • 2011
  • 본 논문에서는 수리가 가능한 시스템에 대하여 무료 재생교체-비재생수리보증이 종료된 이후의 최적의 교체정책을 제안한다. 이를 위해서, 무료재생교체-비재생수리보증을 정의하고, 사용자 측면에서 무료재생교체-비재생수리보증이 종료된 이후의 보전모형을 고려한다. 최적의 보전정책을 결정하기 위한 기준으로는 사용자 측면의 단위시간당 기대비용을 사용하는데, 이러한 단위시간당 기대비용을 구하기 위해서 사용자측면의 기대순환길이와 총기대비용을 각각 유도한다. 끝으로 본 논문에서 제안된 무료 재생교체-비재생수리 보증이 종료된 이후의 최적의 교체정책을 설명하기 위해서 수치적 예를 살펴본다.

비재생무료교체-수리보증이 종료된 이후의 예방보전모형 (Preventive maintenance model following the expiration of NFRRW)

  • 정기문
    • Journal of the Korean Data and Information Science Society
    • /
    • 제22권4호
    • /
    • pp.775-784
    • /
    • 2011
  • 본 논문에서는 비재생무료교체-수리보증이 종료된 이후의 수리가 가능한 시스템에 대한 주기적인 예방보전모형을 고려한다. 이러한 예방보전모형에 대하여 기대순환길이, 총기대비용 그리고 단위시간당 기대비용을 각각 유도하고자 한다. 또한 유도된 단위시간당 기대비용을 최소화하는 최적의 예방 보전주기와 예방보전횟수를 결정하는 방법에 대하여 자세히 설명한다. 끝으로 고장시간이 와이블분포를 따르는 경우에 최적의 주기적 예방보전정책을 결정하여 본다.

매개변수기법을 이용한 고속철도 노반공사의 개략공사비 예측모델 (Conceptual Cost Estimation Model Using by a Parametric Method for High-speed Railroad)

  • 이영주;장성용
    • 대한토목학회논문집
    • /
    • 제31권4D호
    • /
    • pp.595-601
    • /
    • 2011
  • 고속철도 기본계획단계에서 노반공사의 토공사 공사비 추정은 단위길이당 공사비(원/km)를 활용하고 있다. 이 단가는 과거자료를 기준으로 한 산술평균으로 오차가 클 수 있으며, 기본설계 단계 등 다음단계의 견적과 연계성이 부족한 단점이 있다. 본 연구는 철도연장에 토공사의 기술적 특성인 지질조건을 추가하는 매개변수 기반 개략공사비 산정모델을 제시한다. 데이터분석은 회귀분석법을 적용하였으며, 독립변수는 길이, 지질(토사, 풍화암, 연암, 경암) 구성 비율이고, 36개 공구 실적공사비를 참조하였다. 개발된 모델은 실적공사비와 비교한 결과 -0.4% ~ +31% 범위로 나타나, 전형적 범위인 -30% ~ +50% 이내이므로 유효한 것으로 판정한다. 본 모델은 공사비 영향의 주요요인인 길이에 기술적 특성인 지질요건을 추가함으로써 공사비 산정결과의 신뢰도 향상을 꾀함으로써 단계별 효과적 총사업비관리, 재정지출 감소 및 사업의 경제성 확보에 기여할 수 있을 것으로 기대된다.