• Title/Summary/Keyword: Underground workers

Search Result 74, Processing Time 0.028 seconds

Review of the installable area of multi-utility tunnel using feasibility assessment indexes (타당성 평가지표를 활용한 터널식 공동구 설치가능지역 검토)

  • Oh, Won-Joon.;Jin, Kyu-Nam.;Na, Gwi-Tae.;Cho, Choong-Yeun.;Sim, Young-Jong.
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.6
    • /
    • pp.795-810
    • /
    • 2019
  • In this paper, The study was conducted on the method to roughly determine the area and length of the multi-utility tunnel before the planning and design phase of the multi-utility tunnel construction. For this purpose, four feasibility indexes were used: traffic density, population density, disaster prevention index (number of workers), and urbanization rate, which reflect the regional characteristics. The installation criteria were set in consideration of the average value and minimum value of the feasibility indexes for the tunnel type among areas that can be installed in the multi-utility tunnel of Seoul. The analysis area included 200 areas based on 14 zones. The results of the analysis based on the minimum value of feasibility indexes indicated that the tunnel type of multi-utility tunnel is suitable for 39 areas with high traffic volume and population. On the other hand, the 'gun' area, etc., has a wider population than the 'si' and 'gu', suggesting that it is not suitable to install multi-utility tunnel. In addition, it can be seen that the larger the index value centered on the minimum value of each index, the smaller the tunnel type of multi-utility tunnel installation area.

A real-time construction management of a tunnel using position tracking sensor (위치추적 센서를 이용한 터널의 실시간 시공관리)

  • Lee, Kang-Hyun;Kim, Dae-Won;Mun, Sung-Mo;Cho, Hun-Hee;Kang, Kyung-In;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.2
    • /
    • pp.133-148
    • /
    • 2011
  • Construction sites are becoming larger and complex with the growth of national economy. Accordingly, it is important to identify real-time information about materials, equipments, and manpower during construction at sites. Even though research utilizing position tracking sensors has been conducted in architectural engineering fields, this area of research is almost nil in civil engineering fields. Therefore, a feasibility study to find a way to apply position tracking sensors to an in-situ tunnel construction site adopting conventional tunnelling method is performed in this study. A methodology is proposed that the progress management of the tunnelling work can be monitored by checking construction materials needed at job site and the safety management system can be assessed by checking distance between in-situ workers and construction equipments. The most representative materials were identified so that IT technology can be applied by attaching and monitoring sensors to the selected materials. Also, time of arrival (TOA) for a position determination technology along with a wireless network technology was chosen and build wireless network system. The adopted methodology was applied to an in-situ tunnelling site, and verified the usefulness of the proposed system.

An analysis of excavation cycle time for Korean tunnels and the comparison with the Standard of Construction Estimate (국내터널 굴착 사이클타임에 대한 분석결과와 표준품셈과의 비교)

  • Kim, Yangkyun;Kim, Hyung-Mok;Lee, Sean S.
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.137-153
    • /
    • 2019
  • Estimating tunnel construction time and costs are the most fundamental part of a tunnel project planning, which has been generally assessed on a deterministic basis until now. In this paper, excavation cycle time was investigated for two road tunnels and one subway tunnel, and the results were compared with the Standard of Construction Estimate (SE), which is made for the estimation of construction time and cost in a design stage. The results show that the difference in cycle time between SE and actual cycle time is 50%, 7% and 31% respectively for the three tunnels, which means that SE does not reflect practical operation time. The major reasons of the difference are skilled level of tunneling workers, the change of operation sequences for more effective operations, much more complicated working atmosphere in a tunnel than the assumption of SE etc. Finally, even though the results can not be generalized since investigated tunnels are only 3, but it is thought that SE needs to be upgraded into the model able to consider quite common situations through additional tunnel investigation and studies in the future.

A Study on the Introduction and Application of Core Technologies of Smart Motor-Graders for Automated Road Construction (도로 시공 자동화를 위한 스마트 모터 그레이더의 구성 기술 소개 및 적용에 관한 연구)

  • Park, Hyune-Jun;Lee, Sang-Min;Song, Chang-Heon;Cho, Jung-Woo;Oh, Joo-Young
    • Tunnel and Underground Space
    • /
    • v.32 no.5
    • /
    • pp.298-311
    • /
    • 2022
  • Some problems, such as aging workers, a decreased population due to a low birth rate, and shortage of skilled workers, are rising in construction sites. Therefore research for smart construction technology that can be improved for productivity, safety, and quality has been recently developed with government support by replacing traditional construction technology with advanced digital technology. In particular, the motor grader that mainly performs road surface flattening is a construction machine that requires the application of automation technology for repetitive construction. It is predicted that the construction period will be shortened if the construction automation technology such as trajectory tracking, automation work, and remote control technology is applied. In this study, we introduce the hardware and software architecture of the smart motor grader to apply unmanned and automation technology and then analyze the traditional earthwork method of the motor grader. We suggested the application plans for the path pattern and blade control method of the smart motor grader based on this. In addition, we verified the performance of waypoint-based path-following depending on scenarios and the blade control's performance through tests.

An Experimental Study on the Flexural Behavior of Deck Plates with Metal Lath and Mortar (라스와 모르타르를 이용한 데크의 휨거동에 관한 실험적 연구)

  • Kim, Sung-Bae;Kim, Sung-Jin;Seo, Dong-Min;Kim, Sang-Seup
    • Journal of the Korea Concrete Institute
    • /
    • v.20 no.1
    • /
    • pp.117-125
    • /
    • 2008
  • In the domestic construction industry field nowadays, the usage of deck plates is currently increasing due to the lack of construction workers and the rised in construction cost. However, using deck plates manufactured by thin zinc galvanization in underground structures is criticised because it can lead to increase in maintenance cost caused by rust generation and water leakage. As a solution for this particular problem, deck plates created by Lath and Mortar instead of zinc galvanized steel sheets were developed. This paper deals with the experimental study on flexural behavior of deck plate using metal lath and mortar. Seventeen fullscale specimens were constructed and tested with different type of truss, the diameter of the top and bottom bar, and the thickness of slab. Tests results show that LAMO deck displayed equal performance such as zinc galvanized steel sheets.

A Study on Changes of Apartment Landscapes (아파트 조경의 변화에 관한 연구)

  • Kim, Do-Hee;Sung, Hyun-Chan
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.13 no.4
    • /
    • pp.75-90
    • /
    • 2010
  • The purpose of this study is to identify landscaping costs for apartment landscapes, landscape facility factors, and the transition of spatial composition for landscapes. In addition, based on the questionnaires and analysis results for workers in related fields such as landscape design companies and construction companies, this study aimed at acquiring results for the development of current apartment landscapes and directions for improvement in the future. Through the results, it aimed at providing basic data for apartment landscapes in the future. Results showed that there was approximately a 2.6 times increase for landscaping expenses of actual apartment landscapes, and a 7.0 to 11.5 times increase in the future can be expected. The cause of such increase is the continuously growing demand for a more pleasant environment. Landscape facilities factors have been diversified, and most facilities are used as multi-purpose spaces rather than serving simple facilities. Questionnaires and field investigations showed that water facilities underwent the biggest changes, and the cause for such changes were found to be the introduction of new facilities such as water facilities and environmental structures, as well as the creation of integrated functions and spaces. Spatial composition for landscapes showed that multi-purpose spaces were established, and for the apartment differentiation strategy, there were many different changes such as theming of green areas and places for exchange among residents. For changes, the most changes were in green areas, and studies also showed that there were many changes for rest areas as well. The cause for such change is judged to have been brought about by the increase of landscape space by placing parking areas underground, and investigations showed that compared to green areas composed of large grass patches, recent apartments are establishing diverse and experience-based green areas.

Study on the Fuzzy Inference System for Objectivity of Ground Evaluation in Tunnelling (터널지반 평가의 객관화를 위한 퍼지추론시스템 연구)

  • 조만섭;김영석
    • Tunnel and Underground Space
    • /
    • v.13 no.1
    • /
    • pp.6-19
    • /
    • 2003
  • This study has for its object to increase an objectivity of the observation result in the face mapping of tunnel and to suggest the reasonable support and reinforcement methods to be considered the rock properties. It was developed in this study to the tunnel stability evaluation system(Prototype NFEST) to be used fuzzy set theory and neuro-fuzzy techniques, and this system was verified according to the reliability evaluation between the 36 learning data and the inferred results. When it summarized the results; (1) 12 evaluation items and ranges were proposed to be modified basis on the RMR which are well known to the domestic workers. (2) It was shown that correlation coefficient(│R│) between $RMR_{inf}$ inferred by 12 items and $RMR_{org}$ due to arithmetic total, $RMR_{chk}$ due to subjective judgement of observer are relatively high relationship with each 0.83 and 0.79. (3) Inferred result of the total tunnel safety shows also a good relationship with $RMR_{inf}$ (│R│=0.7) and the rock weathering(│R│=0.84).

Factors Influencing Cost Overruns in Construction Projects of International Contractors in Vietnam

  • VU, Thong Quoc;PHAM, Cuong Phu;NGUYEN, Thu Anh;NGUYEN, Phong Thanh;PHAN, Phuong Thanh;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.9
    • /
    • pp.389-400
    • /
    • 2020
  • A construction project is a designed product made up of labors, materials, and installations in the project positioned on the ground and may include the underground and ground section, and the section in water or on the water surface. It is a civil, industrial, transport, agricultural and rural development, infrastructure, or some other. A key phase in the life cycle of these construction projects is the implementation when building products are made directly with workers, equipment, materials, and managers. If there is a lack of management experience, information, and problem-solving solutions to tackle the risks faced by contractors, especially foreign ones, will fail in controlling the project's cost. This study was conducted with investigations, discussions, and evaluation of the factors that lead to cost overruns in the construction projects of international contractors in Vietnam. The principal component analysis (PCA) showed that those factors that influence cost overruns these construction projects fall into five general groups, including factors related to (i) the owners, (ii) the foreign contractors, (iii) the subcontractors and suppliers, (iv) state management, and (v) the project itself. Besides, the study proposes solutions to limit cost overruns in construction projects and improve the profitability of international contractors in Vietnam.

A Study on the Sensor Module System for Real-Time Risk Environment Management (실시간 위험환경 관리를 위한 센서 모듈시스템 연구)

  • Cho, Young Chang;Kwon, Ki Jin;Jeong, Jong Hyeong;Kim, Min Soo
    • Journal of IKEEE
    • /
    • v.22 no.4
    • /
    • pp.953-958
    • /
    • 2018
  • In this study, a portable detection system was developed that can detect harmful gas and signals simultaneously in an enclosed space of industrial sites and underground facilities. The developed system is a sensor module for gas detection, a patch type 1 channel small ECG sensor, a module for three-axial acceleration detection sensor, and a system for statistics. In order to verify the performance of the system modules, the digital resolution, signal frequency, output voltage, and ultra-small modules were evaluated. As a result of the performance of the developed system, the digital resolution was 300 (rps) and the signal amplification gain was 500 dB or more, and the ECG module was manufactured with $50mm{\times}10mm{\times}10mm$ to increase patch utilization. It is believed that the product of this research will be valuable if it is used as an IoT-based management system for real-time monitoring of industrial workers.

Introduction to Research Trend of Real-Time Measurement for Wear of TBM Disc Cutter (TBM 디스크커터의 마모량 실시간 계측을 위한 연구현황)

  • Min-Sung, Park;Min-Seok, Ju;Min-Sung, Cho;Jun, Lee;Jung-Joo, Kim;Hoyoung, Jeong
    • Tunnel and Underground Space
    • /
    • v.32 no.6
    • /
    • pp.478-490
    • /
    • 2022
  • TBM disc cutter, which is the main cutting tool of tunnel boring machine (TBM), is replaced when it is excessively worn during the boring process. Disc cutters are usually monitored by workers at cutterhead chamber, and they check the status and wear amount of cutters. Because cutterhead chamber is usually in dangerous circumstance due to high pressure and instability of excavation surface, the measurement by manpower occasionally results in inaccuracy of measurement result. In order to overcome the limitations, the real-time disc cutter monitoring techniques have been developed in some foreign countries. This paper collected the current status of disc cutter monitoring system from the literature. Several types of sensors are used to measure the cutter wear, and it is believed that the collected information can be useful reference when similar domestic technologies are developed in the future.